Skip to main content
Language Translation
  Close Menu

Design Manual Editable Documents

Design Manual Editable Documents

This page contains editable versions of documents, worksheets, and other forms referenced in the Indiana Design Manual (IDM).

Last Updated: 05/30/23
Category
IDM
Ch.
EdDoc/
Figure
Document Title
INDOT Bridge Design and Load Rating webpage
Bridges
14
N/ABridge Load Rating Request Form (del. 5/01/20)
Requests are now made through ITAP - Load Rating Request Application.
Load Rating Request Instructions
Bridges
17
17-5KBridge Painting Locations and Information (Rev. Apr. 2020, Jul. 2020)
Bridges
408
408-1B-LRFD
prev. 66-1A
Foundation Review (LRFD)
Bridges
408
408-1B-LFD
prev. 66-1A
Foundation Review (LFD/ASD)
Bridges
412
412-02-01Bridge Preventive Maintenance Meeting Minutes (Rev. Mar. 2021)
Bridges
412
412-02-02Bridge Rehabilitation Report (Rev. Mar. 2021)
Category
IDM
Ch.
EdDoc/
Figure
Document Title
Contract
Administration
14
14-1CContract Preparation Documents to Contract Administration Division
(rev. Mar. 2016, Apr. 2020, Oct. 2020, Jul. 2022, Aug. 2022)
(FOR LETTINGS BEFORE SEPTEMBER 1, 2023)
Contract
Administration
14
14-1CContract Preparation Documents to Contract Administration Division (New. Mar. 2023)
(FOR LETTINGS ON OR AFTER SEPTEMBER 1, 2023)
Contract
Administration
14
103-02-17PS&E Checklist Bundling Information and Instructions (added 06/02/16)
Contract
Administration
14
14-1E(1)FHWA- Indiana PS&E Checklist (INDOT staff only) (rev. 05/02/19)
Contract Administration
14
14-1E(2)Narrative for PS&E Checklist (INDOT staff only) (rev. 03/21/16)
Contract Administration
14
14-1E(3)PS&E Documentation required (INDOT staff only)
Contract Administration
14
103-02-10Request for Proposed Contract Revision After Advertisement (rev. Aug. 2021, Mar. 2022, Sep.2022)
Contract Administration
14
103-02-11Contract Information Book Certification (del. 08/21/2020)
Contract Administration
14
14-1GConstruction Change
Category
IDM
Ch.
EdDoc/
Figure
Document Title
Design Submittal
14
103-02-03Field Check Notification Letter (in house or consultant)
Notification for Bridge Field Checks (added 06/27/19)
Design Submittal
14
103-02-01Final Tracings Checklist (Rev. Oct. 2021, Jul. 2022)
Final Tracings Additional Instructions (Rev. Jul. 2022)
Final Tracings Checklist (Excel format) (Rev. Oct. 2021, Jul. 2022)
Design Submittal
14
N/AERMS Information
ERMS File Naming Convention (Rev. Oct. 2021, Jan.2022, Jul. 2022)
Example Notification Email
Design Submittal
40
40-8ASDDCTEA Interstate Vertical Clearance Exception Coordination (added 07/01/14)
Design Submittal
40
40-8BLevel One Design Criteria Checklist and Instructions (Rev. 10/08/20)
See Design Memo 20-13 for updates to Level One Controlling Criteria.
Design Submittal
40
40-8CLevel One Design Exception Request - NHS or Non-NHS (Rev. 07/01/14, Jun. 2022)
Template 3R Design Exception Documentation
Design Submittal
51
N/ARoundabout Review Checklist (Rev. Apr. 2022)
Design Submittal N/APre-bid Template
Pre-bid example
Pre-bid Sign-In Sheet Template
Design Submittal N/AShop Drawings Checklist - 3 sided and 4 sided culverts
Category
IDM
Ch.
EdDoc/
Figure
Document Title
Environmental
7
7-3CEnvironmental Consultation Form and Instructions (Rev. Feb. 2017, Apr. 2020, Mar. 2023)
Environmental
9
9-4JIDEM Class V Well Inventory
Environmental
9
9-4AU.S. Army Corps of Engineers Section 404 Permit and Levee Work Permit Application
Environmental
9
9-4BIDEM Water Quality Section 401 Permit Application (Link for update)
Environmental
9
9-4CIDNR Construction in Floodway Permit Application - The permit type to be checked is IC-14-28-1 Flood Control Act.
Environmental
9
9-4DCSGP Data Sheet
Environmental
9
9-4EFAA Notice of Proposed Construction or Alteration in Airspace Application
(Link for update)
Environmental
9
N/AThe following five counties require additional drainage permits.
Regulated Drain Permit Application – Allen County
Regulated Drain Permit Application – Elkhart County
Regulated Drain Permit Application – Hamilton County
Regulated Drain Permit Application – Lake County
Regulated Drain Permit Application – LaPorte County
Environmental
205
205-01-01 prev. 37-1AErosion and Sediment Control Plan Technical Review Checklist
Environmental
9
N/AConstruction Stormwater General Permit (CSGP) Public Notice Requirements
Category
IDM
Ch.
EdDoc/
Figure
Document Title
Geotechnical
107
107-01-01(fig. 107-1A)Geotechnical Waiver or Investigation Request Transmittal (added 08/01/13)
Geotechnical
107
107-05-01 (Fig. 107-5A) prev. 18-1BGeotechnical Review of Final Check Prints
GeotechnicalN/AN/AMSE Wall Shop Drawing Review Checklist
GeotechnicalN/AN/AMSE Wall Design Review Checklist (rev. 12/31/21)
Category
IDM
Ch.
EdDoc/
Figure
Document Title
INDOT Hydraulics webpage
Hydraulics
202
202-2ATR-55 Time of Concentration Worksheet
Hydraulics
202
202-3CRegional Multiplier for Determination of 0.2% Annual EP (GIS Shape File) (added 02/07/14)
Hydraulics
203
203-3DSample Scour Report (added 05/22/15)
Hydraulics
203
203-2LRiprap Basin Design Checklist (del. 04/07/22)
Hydraulics
203
203-3CHydraulics Quality Assurance Checklist (del. 04/07/22)
Hydraulics
203
203-4EInlet Spacing Computation Worksheet (rev. 04/01/13)
Hydraulics
203
203-4IStorm Drain Computation Worksheet (rev. 04/01/13)
Hydraulics
203
203-5ASummary Performance Table for Storage
Category
IDM
Ch.
EdDoc/
Figure
Document Title
Lighting
502
502-04-01Highway Lighting Accident Warrant Analysis Worksheet
Appendices for Worksheet. Prev. Fig. 78-2B
Lighting
502
502-04-02Service Cost per Year for Luminaire Replacement or Partial Modernization (added 06/12/13). Prev. Fig. 78-5B
Lighting
502
502-04-03Service Cost per Year for New or Fully-Modernized Lighting (added 06/12/13). Prev. Fig. 78-5C
Category
IDM
Ch.
EdDoc/
Figure
Document Title
INDOT Pavement Design webpage
Pavement
601
601-6.0.1Pavement Design Request – Local Public Agency Project (rev. 01/07/20)
Instructions for Completion of Pavement Design Request - LPA
Pavement
601
601-6.0.2Pavement Design Request – INDOT Project (rev. 03/01/23)
Pavement
601
601-6.0.3Pavement Design Request – INDOT Project Shoulder MOT (new 01/21/22)
Pavement
604
 Falling-Weight Deflectometer (FWD) Testing Request (removed 04/10/14)
Requests are now made through ITAP - Research and Development Testing Website.
Category
IDM
Ch.
EdDoc/
Figure
Document Title
Proprietary Material Approval:Roadway and Roadside items = Highway Engineering Director
Bridge items = Bridge Engineering Director
Traffic items = Traffic Administration Manager
Proprietary Materials
17
17-01-01Proprietary Material Request
Category
IDM
Ch.
EdDoc/
Figure
Document Title
Public Involvement
n/a
103-02-15Public Involvement Summary
Example
Public Involvement
n/a
103-02-16Public Involvement Notification
Category
IDM
Ch.
EdDoc/
Figure
Document Title
Right of Way
85
n/aRight of Way Engineering Quality Assurance Form (consultant)
Right of Way
85
85-2CPlat No. 1 Checklist
Right of Way
85
85-2FRight-of-Way Plans Checklist
Right of Way
85
85-3APartial Suspension of Right-of-Way Acquisition Activities
Right of Way
85
85-3BComplete Suspension of Right-of-Way Acquisition Activities
Right of Way
86
86-1AComparative Cost Study for Local Service Roads [Form R/W-16]
Right of Way
86
86-1BLocal Service Road Study (Multiple Properties) Form
Category
IDM
Ch.
EdDoc/
Figure
Document Title
Survey
22
22-3ANotice of Survey Letter
Survey
22
22-3BSurvey Interview Report Form
Survey
23
23-2AGuide for Checking Survey Book
Category
IDM
Ch.
EdDoc/
Figure
Document Title
Traffic
5
5-2BTraffic Forecasting Request
Requests are processed through ITAP
Traffic
5
5-2CCrash Statistics Request
Traffic
55
55-8ACrash Analysis Form
Traffic
502
502-02-01Pavement Marking Material Summary (added 12/09/21)
Traffic
502
502-03-01
(prev. 77-5DD)
Loop Tagging Table
Instructions for Completing the Loop Tagging Table (added 02/18/14)
Traffic
502
502-03-02
(prev. 77-6A)
Radio Site Survey Report (rev. 02/18/14)
Traffic
502
502-03-03APS Study Report Form (added 01/07/16)
Procedure for Completing the APS Study (Operations Memo 14-01)
Category
IDM
Ch.
EdDoc/
Figure
Document Title
Traffic Maintenance (MOT)
503
503-2.02.1Significant Work Zone Impact Determination Worksheet
(rev. 08/05/2021, May 2023)
Traffic Maintenance (MOT)
503
503-2.05.1Traffic Control Strategy Memo (rev. May 2023)
Traffic Maintenance (MOT)
503
503-2.05.2Detour Worksheet - Non-Interstate (rev. May 2023)
Traffic Maintenance (MOT)
503
503-2.05.3Crossover and Runaround Viability Worksheet
Traffic Maintenance (MOT)
503
503-2.05.4Detour Worksheet - Interstate (rev. May 2023)
Traffic Maintenance (MOT)
503
503-2.06.1Determination of Incentive Disincentive Amount (rev. May 2023)
Traffic Maintenance (MOT)
503
503-3.01.1Traffic Control Plan Checklist ( rev. May 2023)
Traffic Maintenance (MOT)
503
503-7.01.1Programming Information for Portable Changeable Message Sign
Traffic Maintenance (MOT)
503
503-7.04.1Temporary Signal Type Determination
Category
IDM
Ch.
EdDoc/
Figure
Document Title
Utilities
9
9-4(IL)Trunkline Right of Way Permit Application – Illinois
Utilities
9
9-4G(MI)Trunkline Right of Way Permit Application – Michigan
Utilities
9
9-4G(OH)Trunkline Right of Way Permit Application – Ohio

Contact Information

DesignManualInquires@indot.in.gov