Header

  Close Menu
Design Manual Editable Documents

Article

Design Manual Editable Documents

Design Manual Editable Documents

This page contains editable versions of documents, worksheets, and other forms referenced in the Indiana Design Manual (IDM).
Last Updated: 04/11/24
Category
IDM
Ch.
EdDoc/
Figure
Document Title
INDOT Bridge Design and Load Rating webpage
Bridges
14
N/A Bridge Load Rating Request Form (del. 5/01/20)
Requests are now made through ITAP - Load Rating Request Application.
Load Rating Request Instructions
Bridges
17
17-5K Bridge Painting Locations and Information (Rev. Apr. 2020, Jul. 2020)
Bridges
408
408-1B-LRFD
Foundation Review (LRFD) - PILES (Rev. Oct. 2023)
Bridges
408
408-1C-LRFD
Foundation Review (LRFD) - SPREAD FOOTING (New. Oct. 2023)
Bridges
408
408-1B-LFD
prev. 66-1A
Foundation Review (LFD/ASD)
Bridges
412
412-02-01 Bridge Preventive Maintenance Meeting Minutes (Rev. Mar. 2021)
Bridges
412
412-02-02 Bridge Rehabilitation Report (Rev. Mar. 2021)

 

Category
IDM
Ch.
EdDoc/
Figure
Document Title
Contract
Administration
14
14-1C Contract Preparation Documents to Contract Administration Division (New. Mar. 2023, Rev. Nov. 2023)
Contract
Administration
14
103-02-17 PS&E Checklist Bundling Information and Instructions (added 06/02/16)
Contract
Administration
14
14-1E(1) FHWA- Indiana PS&E Checklist (INDOT staff only) (rev. 12/08/23)
Contract Administration
14
14-1E(2) Narrative for PS&E Checklist (INDOT staff only) (rev. 03/21/16)
Contract Administration
14
14-1E(3) PS&E Documentation required (INDOT staff only)
Contract Administration
14
103-02-10 Request for Proposed Contract Revision After Advertisement (rev. Aug. 2021, Mar. 2022, Sep.2022, Sep 2023)
Contract Administration
14
103-02-11 Contract Information Book Certification (del. 08/21/2020)
Contract Administration
14
14-1G Construction Change

 

Category
IDM
Ch.
EdDoc/
Figure
Document Title
Design Submittal
14
103-02-03 Field Check Notification Letter (in house or consultant)
Notification for Bridge Field Checks (added 06/27/19)
Design Submittal
14
103-02-01 Final Tracings Checklist (Rev. Oct. 2021, Jul. 2022, Apr. 2024)
Final Tracings Additional Instructions (Rev. Jul. 2022, Apr. 2024)
Final Tracings Checklist (Excel format) (Rev. Oct. 2021, Jul. 2022, Apr. 2024)
Design Submittal
14
N/A ERMS Information
ERMS File Naming Convention (Rev. Oct. 2021, Jan.2022, Jul. 2022)
Example Notification Email
Design Submittal
40
40-8A SDDCTEA Interstate Vertical Clearance Exception Coordination (added 07/01/14)
Design Submittal
40
40-8B Level One Design Criteria Checklist and Instructions (Rev. 10/08/20)
See Design Memo 20-13 for updates to Level One Controlling Criteria.
Design Submittal
40
40-8C Level One Design Exception Request - NHS or Non-NHS (Rev. 07/01/14, Jun. 2022)
Template 3R Design Exception Documentation
Design Submittal
51
N/A Roundabout Review Checklist (Rev. Apr. 2022)
Design Submittal
N/A Pre-bid Template
Pre-bid example
Pre-bid Sign-In Sheet Template
Design Submittal
N/A Shop Drawings Checklist - 3 sided and 4 sided culverts

 

Category
IDM
Ch.
EdDoc/
Figure
Document Title
Environmental
7
7-3C Environmental Consultation Form and Instructions (Rev. Feb. 2017, Apr. 2020, Mar. 2023)
Environmental
9
9-4J IDEM Class V Well Inventory
Environmental
9
9-4A U.S. Army Corps of Engineers Section 404 Permit and Levee Work Permit Application
Environmental
9
9-4B IDEM Water Quality Section 401 Permit Application (Link for update)
Environmental
9
9-4C IDNR Construction in Floodway Permit Application - The permit type to be checked is IC-14-28-1 Flood Control Act.
Environmental
9
9-4D CSGP Data Sheet
Environmental
9
9-4E FAA Notice of Proposed Construction or Alteration in Airspace Application
(Link for update)
Environmental
9
N/A The following five counties require additional drainage permits.
Regulated Drain Permit Application – Allen County
Regulated Drain Permit Application – Elkhart County
Regulated Drain Permit Application – Hamilton County
Regulated Drain Permit Application – Lake County
Regulated Drain Permit Application – LaPorte County
Environmental
205
205-01-01 prev. 37-1A Erosion and Sediment Control Plan Technical Review Checklist
Environmental
9
N/A Construction Stormwater General Permit (CSGP) Public Notice Requirements

 

Category
IDM
Ch.
EdDoc/
Figure
Document Title
Geotechnical
107
107-01-01 Geotechnical Waiver or Investigation Request Transmittal (Revised 09/29/2023)
Geotechnical
107
107-05-01 Geotechnical Review of Final Check Prints(Revised 09/29/2023)
Geotechnical
N/A
N/A MSE Wall Shop Drawing Review Checklist
Geotechnical
N/A
N/A MSE Wall Design Review Checklist (rev. 12/31/21)

 

Category
IDM
Ch.
EdDoc/
Figure
Document Title
INDOT Hydraulics webpage
Hydraulics
202
202-2A TR-55 Time of Concentration Worksheet
Hydraulics
202
202-3C Regional Multiplier for Determination of 0.2% Annual EP (GIS Shape File) (added 02/07/14)
Hydraulics
203
203-3D Sample Scour Report (added 05/22/15)
Hydraulics
203
203-2L Riprap Basin Design Checklist (del. 04/07/22)
Hydraulics
203
203-3C Hydraulics Quality Assurance Checklist (del. 04/07/22)
Hydraulics
203
203-4E Inlet Spacing Computation Worksheet (rev. 04/01/13)
Hydraulics
203
203-4I Storm Drain Computation Worksheet (rev. 04/01/13)
Hydraulics
203
203-5A Summary Performance Table for Storage

 

Category
IDM
Ch.
EdDoc/
Figure
Document Title
Lighting
502
502-04-01 Highway Lighting Accident Warrant Analysis Worksheet
Appendices for Worksheet. Prev. Fig. 78-2B
Lighting
502
502-04-02 Service Cost per Year for Luminaire Replacement or Partial Modernization (added 06/12/13). Prev. Fig. 78-5B
Lighting
502
502-04-03 Service Cost per Year for New or Fully-Modernized Lighting (added 06/12/13). Prev. Fig. 78-5C

 

Category
IDM
Ch.
EdDoc/
Figure
Document Title
INDOT Pavement Design webpage
Pavement
601
601-6.0.1
Pavement Design Request – Local Public Agency Project (rev. 01/07/20)
Instructions for Completion of Pavement Design Request - LPA
Pavement
601
601-6.0.2
Pavement Design Request – INDOT Project (rev. 03/01/23, 4/11/24)
Pavement
601
601-6.0.3
Pavement Design Request – INDOT Project Shoulder MOT (new 01/21/22)
Pavement
604
Falling-Weight Deflectometer (FWD) Testing Request (removed 04/10/14)
Requests are now made through ITAP - Research and Development Testing Website.

 

Category
IDM
Ch.
EdDoc/
Figure
Document Title
Proprietary Material Approval: Roadway and Roadside items = Highway Engineering Director
Bridge items = Bridge Engineering Director
Traffic items = Traffic Administration Manager
Proprietary Materials
17
17-01-01 Proprietary Material Request

 

Category
IDM
Ch.
EdDoc/
Figure
Document Title
Public Involvement
n/a
103-02-15 Public Involvement Summary
Example
Public Involvement
n/a
103-02-16 Public Involvement Notification

 

Category
IDM
Ch.
EdDoc/
Figure
Document Title
Right of Way
85
n/a Right of Way Engineering Quality Assurance Form (consultant)
Right of Way
85
85-2C Plat No. 1 Checklist
Right of Way
85
85-2F Right-of-Way Plans Checklist
Right of Way
85
85-3A Partial Suspension of Right-of-Way Acquisition Activities
Right of Way
85
85-3B Complete Suspension of Right-of-Way Acquisition Activities
Right of Way
86
86-1A Comparative Cost Study for Local Service Roads [Form R/W-16]
Right of Way
86
86-1B Local Service Road Study (Multiple Properties) Form

 

Category
IDM
Ch.
EdDoc/
Figure
Document Title
Survey
22
22-3A Notice of Survey Letter
Survey
22
22-3B Survey Interview Report Form
Survey
23
23-2A Guide for Checking Survey Book

 

Category
IDM
Ch.
EdDoc/
Figure
Document Title
Traffic
5
5-2B Traffic Forecasting Request
Requests are processed through ITAP
Traffic
5
5-2C Crash Statistics Request
Traffic
55
55-8A Crash Analysis Form
Traffic
502
502-02-01
Pavement Marking Material Summary (added 12/09/21)
Traffic
502
502-03-01
(prev. 77-5DD)
Loop Tagging Table
Instructions for Completing the Loop Tagging Table (added 02/18/14)
Traffic
502
502-03-02
(prev. 77-6A)
Radio Site Survey Report (rev. 02/18/14)
Traffic
502
502-03-03
APS Study Report Form (added 01/07/16)
Procedure for Completing the APS Study (Operations Memo 14-01)

 

Category
IDM
Ch.
EdDoc/
Figure
Document Title
Traffic Maintenance (MOT)
503
503-2.02.1 Significant Work Zone Impact Determination Worksheet
(rev. 08/05/2021, May 2023)
Traffic Maintenance (MOT)
503
503-2.05.1
Traffic Control Strategy Memo (rev. May 2023)
Traffic Maintenance (MOT)
503
503-2.05.2 Detour Worksheet - Non-Interstate (rev. May 2023)
Traffic Maintenance (MOT)
503
503-2.05.3 Crossover and Runaround Viability Worksheet
Traffic Maintenance (MOT)
503
503-2.05.4 Detour Worksheet - Interstate (rev. May 2023)
Traffic Maintenance (MOT)
503
503-2.06.1
Determination of Incentive Disincentive Amount (rev. May 2023)
Traffic Maintenance (MOT)
503
503-3.01.1
Traffic Control Plan Checklist ( rev. May 2023)
Traffic Maintenance (MOT)
503
503-7.01.1
Programming Information for Portable Changeable Message Sign
Traffic Maintenance (MOT)
503
503-7.04.1 Temporary Signal Type Determination

 

Category
IDM
Ch.
EdDoc/
Figure
Document Title
Utilities
9
9-4(IL) Trunkline Right of Way Permit Application – Illinois
Utilities
9
9-4G(MI) Trunkline Right of Way Permit Application – Michigan
Utilities
9
9-4G(OH) Trunkline Right of Way Permit Application – Ohio


Contact Information

DesignManualInquires@indot.in.gov


News and FAQs

INDOT Events

Click here to view more events

Top FAQs