Article
Standards, Specifications, and Provisions
- Standards Committee
- Standard Specifications
- Standard Drawings
- Recurring and Unique Special Provisions & Recurring Plan Details
- Special Provisions Technical Advisories have been discontinued as of 08/06/18. The publication schedule for the RSP Menu has been standardized and occurs in February, May, August, and November, approximately 14 days after the preceding Standards Committee meeting. The schedule of Standards Committee meetings, submittals, and distributions is available from the Standards Committee webpage found in the link above titled "Standards Committee."
- Indiana Design Manual
Memos, Policies, and Instructions
- Design Memorandums
- Construction Memorandums
- Work Zone Safety Mobility Policy
- Interstate Highways Congestion Policy
- General Instructions to Field Employees (GIFE)
Procedures and Documents for SiteManager Contracts
Select this ERMS location to access the following documents:
- Certification for Temporary Traffic Control Devices
- Final Construction Record (FCR) Guide
- Final Description and Elevation of Benchmarks (SF 3031)
- IC-113 Signature Affidavit
- IC-149 Property Release
- IC-225 Pile Driving Record
- IC-625 Salvage Construction Material Record
- IC-699 Checklist for Final Construction Record Index
- IC-740 Pile Driving Equipment Data Form
- INDOT Consultant New User for ProjectWise
- Notice of Termination (SF 51514)
- Pre-Construction Conference Agenda
- Progress Meeting Agenda
- ProjectWise Intelligent FCR
- Railroad 15 day Expiration Letter
- Railroad Release Letter
- Signature Request Letter with DBE
- Signature Request Letter with MBE/WBE/IVBE
References
- Office of Pavement Engineering
- Pipe-Backfill Calculation Software (MS Excel File)
- Underdrain Table (zipped MS Excel file)
- Pipe Material Selection Program (Template Download Required)
- Pay Items List
- ProjectWise Software