Date |
Description |
Number |
06/19/2008 |
Mulched Seeding vs Temporary Mulching |
08-09 |
05/29/2008 |
Procedure for How to Handle Existing Construction Claims |
08-08 |
05/07/2008 |
Final Construction Record and Contract Finalization Procedures for SiteManager Contracts |
08-07 |
04/25/2008 |
New Field Office and Computer Specifications |
08-06 |
04/24/2008 |
Revised Borrow and Disposal Site Specifications |
08-05 |
02/11/2008 |
Zero Dollar Change Order to Change QC/QA HMA Pay Items to PWL QC/QA |
08-04 |
02/04/2008 |
Material Certifications for CRA Contracts |
08-03 |
01/28/2008 |
Revised IC-730 Request for Approval of Subcontractor |
08-02 |
01/14/2008 |
Security of Nuclear Moisture / Density Gauges |
08-01 |
12/18/2007 |
Unit Price Justification for Extra Work |
07-28 |
12/17/2007 |
HMA Revisions for 2008 |
07-27 |
12/07/2007 |
Gabions and Gabion Revet Mattresses |
07-26 |
10/30/2007 |
Measurement of Interstate Work Zone
Queues and Delays |
07-25 |
10/29/2007 |
Revised On the Job Training Requirements
for Construction Contracts |
07-24 |
10/10/2007 |
Placing Concrete for Bridge Decks
and Approaches |
07-23 |
09/19/2007 |
Use of IC-124 to Report Controlling
Operation |
07-22 |
09/10/2007 |
Payment for Hand Dig Holes for Guardrail
Post Installation |
07-21 |
09/04/2007 |
Documentation of Original Field Measurements |
07-20 |
08/27/2007 |
Fabrication and Installation of Worksite
Added Penalty Signs |
07-19 |
07/23/2007 |
Possession of Roadway Samples |
07-18 |
07/09/2007 |
Verifying Pipe Backfill Quantities
for Final Construction Record |
07-17 |
06/29/2007 |
Painting Specification |
07-16 |
06/28/2007 |
Revised Field Office Specifications
for Site Manager |
07-15 |
06/26/2007 |
Worksite Added Penalty Signs |
07-14 |
06/12/2007 |
House Enrolled Act 1623, Construction
Signs |
07-13 |
05/25/2007 |
Discontinuance of Form FHWA-47 |
07-12 |
05/24/2007 |
Compaction Acceptance Testing
of Chemically Modified Soils |
07-11 |
05/14/2007 |
Clarification on Mandrel Testing of
Pipes |
07-10 |
05/03/2007 |
Use of Cones on the Interstate |
07-09 |
04/25/2007 |
Reporting of Payments to Subcontractors |
07-08 |
03/30/2007 |
Required Documentation for Claims |
07-07 |
03/26/2007 |
IC-730 Request for Approval of Subcontractor |
07-06 |
03/19/2007 |
Polymer Coated Double Wall Pipe |
07-05 |
01/30/2007 |
Revised CR-2 Form and Instructions |
07-04 |
01/24/2007 |
Monitoring of Suspended or Debarred
Firms |
07-03 |
01/24/2007 |
Procedures for Determining When the
Davis Bacon Act (DBA) Applies |
07-02 |
01/09/2007 |
DBE Program Policy and Revised Recurring
Special Provision |
07-01 |
12/21/2006 |
Documentation of Controlling Operation
of Work |
06-26 |
12/14/2006 |
Lay Rates for Open Graded HMA Mixes |
06-25 |
09/12/2006 |
Certified Precast Concrete Producers |
06-24 |
08/23/2006 |
Field Office Internet Service Specification |
06-23 |
08/23/2006 |
Policy for Use of Temporary Worksite
Speed Limit Assembly Signs |
06-22 |
07/18/2006 |
Basis of Use for Detectable Warning
Elements for Sidewalk Curb Ramps |
06-21 |
07/17/2006 |
Shop Drawing and Falsework Review
Procedures (revised 7/17/06) |
06-20 |
06/26/2006 |
Clarification of Requirements for
Concrete Mix Designs |
06-19 |
06/13/2006 |
Change Order and Time Extension Policies |
06-18 |
06/13/2006 |
Documentation of Accidents in Work
Zones |
06-17 |
06/13/2006 |
DBE Hauling Special Provision for Federal Aid Contracts |
06-16 |
05/25/2006 |
Hardware for Metal Pipe End Sections |
06-15 |
05/15/2006 |
Clarification of Profilograph Requirements
for the Zero Blanking Band |
06-14 |
05/15/2006 |
Preconstruction Conference, Additional
Invitees |
06-13 |
05/11/2006 |
Pay Items for Ditch Grading, Excavation
and Linear Grading |
06-12 |
05/01/2006 |
Retrofitted Tie Bars |
06-11 |
04/17/2006 |
Location of Pedestrian Push Button
for Signals |
06-10 |
04/12/2006 |
Cellular Concrete Grout Testing |
06-09 |
04/12/2006 |
Documentation That Traffic Control
Devices Meet 350 Crash Test Requirements (rev. 5/30/2006) |
06-08 |
04/05/2006 |
Payment Procedure for Signal Cable,
Specification 805.15 |
06-07 |
04/05/2006 |
Sampling Concrete for PCCP Air Content |
06-06 |
04/03/2006 |
Moisture Tests for HMA & SMA,
2006 |
06-05 |
04/03/2006 |
Profilograph Requirements for the
Zero Blanking Band |
06-04 |
03/24/2006 |
Concrete Mix Designs for 2006 |
06-03 |
03/06/2006 |
Fabrication Detail of Expansion Joints
Class SS |
06-02 |
01/12/2006 |
Contract Items for Cellular Telephones
/ Radios |
06-01 |
09/06/2005 |
Fly Ash and GGBFS Cutoff Date for
PCCP |
05-14 |
08/24/2005 |
Memorandum 04-12 Specification Section
306 - Milling |
05-13 |
07/26/2005 |
Guardrail Transitions, Type TGS-1 |
05-12 |
06/13/2005 |
Acceptance of Plastic Pipe and Pipe
Liner Materials |
05-11 |
06/24/2005 |
Specifications Section 401.14 and
HMA Notched Wedge Longitudinal Joint |
05-10 |
05/25/2005 |
Change Order Procedures |
05-09 |
| 05/09/2005 |
Dynamic Cone Testing of Chemically
Modified Subgrade |
05-08 |
| 04/21/2005 |
Memorandum 04-03 QC/QA Failed Materials
Policy Revision |
05-07 |
| 03/29/2005 |
Hot Mix Asphalt (HMA) Paver Modifications |
05-06 |
| 03/23/2005 |
Concrete Pavement Patching Detail |
05-05 |
| 03/29/2005 |
Revised Special Provision for MSE
Retraining Walls on Active Contracts |
05-04 |
| 03/23/2005 |
Revised IT 530 |
05-03 |
| 03/05/2005 |
Change
Orders |
05-02 |
| 01/27/2005 |
Profilographs and Profilograms |
05-01 |
| 12/29/2004 |
Guidelines for Using Temporary Concrete
Traffic Barriers |
04-15 |
| 11/04/2004 |
Construction Inspection & CSL
Testing on Drilled Shaft Bridge Foundation |
04-14 |
| 10/14/2004 |
Specification Change for MSE Wall
Panel Cores |
04-13 |
| 09/23/2004 |
Specification Section 306 - Milling |
04-12 |
| 07/21/2004 |
Acceptance of Plastic Pipe and Pipe
Liner Materials |
04-11 |
| 07/14/2004 |
Traffic Control and Maintenance of
Traffic Control Devices |
04-10 |
| 06/08/2004 |
QC/QA HMA Quality Assurance Adjustments
and Failed Material |
04-09 |
| 05/21/2004 |
Use of Prime Coat |
04-08 |
| 04/23/2004 |
Flexible Tubular Marker |
04-07 |
| 04/19/2004 |
Temporary Movable Wood Sign Stands |
04-06 |
| 04/19/2004 |
Standard Drawing No 604-SWCR-02,
Sidewalk Curb Ramps General Notes and Details |
04-05 |
| 03/22/2004 |
Standard Specifications Section 213,
Flowable Backfill |
04-04 |
| 03/30/2004 |
QC/QA Failed Materials Policy Revision *Deleted
4/21/05* |
04-03 |
| 03/03/2004 |
Stockpiling of Steel Products |
04-02 |
| 02/23/2004 |
Materials & Tests Approved Lists |
04-01 |
| 12/19/2003 |
Materials & Tests Approved Lists *No Longer Valid -replaced by memo 04-01* |
03-16 |
| 10/28/2003 |
Temporary Concrete Barrier Wall |
03-15 |
| 10/10/2003 |
Placement of Rip Rap Within The Clear
Zone |
03-14 |
| 08/27/2003 |
Preconstruction Notification Concern |
03-13 |
| 08/25/2003 |
Guardrail Components - Timber Block
(SAT) |
03-12 |
| 08/25/2003 |
New Specification Dealing with Demolition
(DAK) |
03-11 |
| 07/22/2003 |
Summary of Changes of HMA Contracts
for Construction in 2003 (GGP) |
03-10 |
| 07/15/2003 |
Use of Circular Traffic Vehicle Detection
Loops (GGP) |
03-09 |
| 05/19/2003 |
Salvaging of Raised Pavement Markers
(GGP) |
03-08 |
| 05/15/2003 |
Operations Conference Follow-Up
(DAK) |
03-07 |
| 05/06/2003 |
PG Binder Sampling and Testing
(GGP) |
03-06 |
| 05/05/2003 |
Acceptance of Widening Mixtures
(GGP) |
03-05 |
| 04/30/2003 |
Specifications 801.10 & 801.12(4) |
03-04 |
| 04/30/2003 |
Non-Standard Pavement joints
(PCCP) (SAT) |
03-03 |
| 01/29/2003 |
Buy American Specification (DAK) |
03-02 |
| 01/21/2003 |
Certification for Category 1 and
2 Temporary Traffic Control Devices (SAT) |
03-01 |
|
10/7/2002 |
Section 801 Changes Regarding Measurement
/ Payment (DAK) |
02-12 |
|
07/10/2002 |
Test
Procedure Exception for HMA --Theoretical Maximum Specific Gravity and
Density of Bituminous Paving Mixtures (AASHTO T 209) |
02-11 |
|
07/02/2002 |
Contractor's
Acceptance Procedures on HMA Volumetric and SMA Contracts |
02-10 |
|
07/01/2002 |
ET-2000
Manufacturer Recommended Installation Changes |
02-09 |
|
06/21/2002 |
Revised
Change Order Approval Policy (DAK) |
02-08 |
|
06/13/2002 |
Frequency
Manual Amendment -Pre-Formed Joint Filler for Concrete(TDB) |
02-07 |
|
06/12/2002 |
Recyclable
Spent Foundry Sand (DAK) (Revised 09/10/02) |
02-06 |
|
05/29/2002 |
2002
SMA Specifications (TDB) |
02-05 |
|
05/10/2002 |
Recycled
Concrete (DAK) |
02-04 |
|
04/19/2002 |
HMA
Binder Content Testing Policy |
02-03 |
|
04/10/2002 |
Field
Density of Soil, Soil-Aggregate, & Aggregate (SAT) |
02-02 |
|
01/24/2002 |
Specification
Changes Involving "Basis for Use" for Temp. Traffic Control
Devices(DAK) |
02-01 |
|
10/17/2001 |
Clarification
of Field Office Specification 105.17 (DAK) |
01-13 |
|
10/16/2001 |
Expansion
Joint Installation (SAT) |
01-12 |
|
10/04/2001 |
Use
of Fly Ash in Concrete after Oct 15 (TDB) |
01-11 |
|
07/24/2001 |
Curing-Sealing
Materials (TDB) |
01-10 |
|
07/24/2001 |
Timber/Wood
Blocks used as Guardrail Components (TDB) |
01-09 |
|
07/11/2001 |
Maintenance
of Attenuator & Guardrail End Treatments (DAK) |
01-08 |
|
06/25/2001 |
Bridge
Paint Specification Changes (GGP) |
01-07 |
|
06/12/2001 |
Acceptance
of Quality Control Plans for Bridge Planning (GGP) |
01-06 |
|
05/30/2001 |
HMA
Binder Content Testing Policy (TDB) |
01-05 |
|
04/17/2001 |
Microsilica
Bridge Deck Overlays (TDB) |
01-04 |
|
04/05/2001 |
Clarification
of Specification 105.17 (Field Office) (DAK) |
01-03 |
|
02/27/2001 |
Guardrail
End Treatments Special Provisions (DAK) |
01-02 |
|
01/02/2001 |
Density
and Moisture Controls on HMA Mixtures (RLY) |
01-01 |
|
12/14/2000 |
Maintenance
of Traffic Plans (TDB) |
00-20 |
|
12/14/2000 |
Time
Extensions (TDB) |
00-19 |
|
10/18/2000 |
Worksite
Traffic Supervisor (TDB) |
00-18 |
|
09/21/2000 |
Use
of Fly Ash in Concrete after October 15 (TDB) |
00-17 |
|
09/05/2000 |
Spec
Revision for 909.02(e) (TDB) |
00-16 |
|
07/07/2000 |
QC/QA
HMA Mixture Appeals (RLY) |
00-15 |
| 06/23/2000 |
Temporary Pavement Markings, 801.10(a)2
(RLY) |
00-14 |
| 06/20/2000 |
Change Order and Time Extension Approval
Authority (RLY) |
00-13 |
|
06/09/2000 |
Construction
of Concrete Public Road Crossovers (DAK) |
00-12 |
|
05/24/2000 |
Bridge
Painting Subcontractors (TDB) |
00-11 |
|
03/31/2000 |
HMA
Notched Wedge Longitudinal Joint (RLY) |
00-10 |
|
03/31/2000 |
Plate
Samples, HMA Thickness Greater Than 75 mm (RLY) |
00-09 |
|
03/31/2000 |
HMA
Roller (RLY) |
00-08 |
|
03/20/2000 |
Random
Crack Remediation for Concrete Pavement (PCCP) (DAK) |
00-07 |
|
03/10/2000 |
Conclusion
of report on Embankment Widening (TDB) |
00-06 |
|
03/06/2000 |
Spec
904.02(d) Surface Aggregate Requirements (TDB) |
00-05 |
|
03/06/2000 |
Spec
for Glass Beads and Thermoplastic (TDB) |
00-04 |
|
03/01/2000 |
HMA
Binder Content Policy 2000 (RLY) |
00-03 |
|
02/04/2000 |
Guidelines
for Transportation Enhancement Projects (TDB) |
00-02 |
|
01/05/2000 |
Tracking
Purchase Order Amounts (RLY) |
00-01 |
|
10/27/1999 |
Making
and Curing "Opening to Traffic" Beams (DAK) |
99-15 |
|
10/19/1999 |
Use
of Foundry Sand in 1999 (GGP) |
99-14 |
|
09/24/1999 |
Bridge
Painting in the Field (GGP) |
99-13 |
|
09/15/1999 |
Fast
Dry Traffic Paint (RLY) |
99-12 |
|
09/01/1999 |
Revised
801, Effective September 1, 1999 (RLY) |
99-11 |
|
08/31/1999 |
Field Office
computers - Y2K (RLY) -Not available at this time |
99-10 |
|
08/12/1999 |
Ignition Oven
for HMA Mixture with Dolomite (RLY) -Not available at this time |
99-09 |
|
07/23/1999 |
Random
Transverse Midpanel Cracking of PCCP (TDB) |
99-08 |
|
05/03/1999 |
TD
459, QA Quantity Adjustments (RLY) |
99-07 |
|
04/23/1999 |
Use
of Maturity Meter for PCC Pavement (TDB) |
99-06 |
|
04/23/1999 |
Revised
Details to Standard Drawings for Guardrail Transition, Type TGB
99-03 (DAK) |
99-05 |
|
04/09/1999 |
Longitudinal
Joints in HMA (RLY) |
99-04 |
|
03/30/1999 |
Detail
Changes to Standard Drawings for Guardrail Transition, Type TGB (DAK) |
99-03 |
|
03/22/1999 |
400 Spec Section
of the Standard Specification (RLY) -Not available at this time |
99-02 |
|
03/01/1999 |
AE-PL
Used as a Prime Coat (RLY) |
99-01 |