This page contains editable versions of documents, worksheets, and other forms referenced in the Indiana Design Manual (IDM).
For questions, contact DesignManualInquires@indot.in.gov
Last Updated: 11/10/2026
| Category | IDM Ch. |
Eddoc/ Figure |
Document Title |
|---|---|---|---|
| INDOT Bridge Design and Load Rating webpage | |||
| Bridges | 14 |
N/A | Bridge Load Rating Request Form (Del. May 2020) Requests are now made through ITAP - Load Rating Request Application. Load Rating Request Instructions |
| Bridges | 17 |
17-5K | Bridge Coating Locations and Information (Editorial Rev. Feb. 2024) |
| Bridges | 408 |
408-1B-LRFD | Foundation Review (LRFD) - PILES (Rev. Oct. 2023) |
| Bridges | 408 |
408-1C-LRFD | Foundation Review (LRFD) - SPREAD FOOTING (Add. Oct. 2023) |
| Bridges | 408 |
408-1B-LFD | Foundation Review (LFD/ASD) |
| Bridges | 412 |
412-02-01 | Bridge Preventive Maintenance Meeting Minutes (Rev. Mar. 2021) |
| Bridges | 412 |
412-02-02 | Bridge Rehabilitation Report (Rev. Mar. 2021) |
| Category | IDM Ch. |
Eddoc/ Figure |
Document Title |
|---|---|---|---|
| Contract Administration | 14 |
14-1C | Contract Preparation Document to Contract Administration Division (Rev. links only, Sep. 2026) |
| Contract Administration | 14 |
103-02-17 | PS&E Checklist Bundling Information and Instructions (Rev. Nov. 2024) |
| Contract Administration | 14 |
14-1E(1) | FHWA-Indiana PS&E Checklist (Rev. Sep. 2026) |
| Contract Administration | 14 |
14-1E(2) | PS&E Checklist Narrative (Rev. Sep. 2026) |
| Contract Administration | 14 |
14-1E(3) | PS&E Documentation Required (Rev. Nov. 2024) |
| Contract Administration | 14 |
103-02-10 | Request for Contract Revision After Advertisement (Rev. Apr. 2025) |
| Contract Administration | 14 |
14-1G | Construction Change |
| Category | IDM Ch. |
Eddoc/ Figure |
Document Title |
|---|---|---|---|
| Design Submittal | 14 |
103-02-03 | Field Check Notification Letter (in house or consultant) Notification for Bridge Field Checks (Add. Jun. 2019) |
| Design Submittal | 14 |
103-02-01 | Final Tracings Checklist (Rev. Sep. 2026) Final Tracings Additional Instructions (Rev. Sep. 2026) Final Tracings Checklist (Excel format) (Rev. Sep. 2026) |
| Design Submittal | 14 |
N/A | ERMS Information ERMS File Naming Convention (Rev. Apr. 2026) Example Notification Email |
| Design Submittal | 14 |
N/A | Infrastructure Cloud User Guide |
| Design Submittal | 14 |
103-02-04 | Road Review Checklist and Status Sheet |
| Design Submittal | 40 |
40-8A | SDDCTEA Interstate Vertical Clearance Exception Coordination (Add. Jul. 2014) |
| Design Submittal | 40 |
40-8B | Level One Design Criteria Checklist and Instructions (Rev. Oct. 2020) See Design Memo 20-13 for updates to Level One Controlling Criteria. |
| Design Submittal | 40 |
40-8C | Level One Design Exception Request - NHS or Non-NHS (Rev. Jun. 2022) Template 3R Design Exception Documentation |
| Design Submittal | 51 |
N/A | Roundabout Review Checklist (Rev. Apr. 2022) |
| Design Submittal | N/A |
Pre-bid Template Pre-bid example Pre-bid Sign-In Sheet Template |
|
| Design Submittal | N/A | Shop Drawings Checklist - 3 sided and 4 sided culverts | |
| Design Submittal | 305 |
N/A |
NCHRP Rpt 910 Design Guidelines for Horizontal Sightline Offset NCHRP Rpt 910 Reliability Analysis Spreadsheet |
| Category | IDM Ch. |
Eddoc/ Figure |
Document Title |
|---|---|---|---|
| Environmental | 7 |
7-3C | Environmental Consultation Form and Instructions (Rev. Mar. 2023) |
| Environmental | 9 |
9-4J | IDEM Class V Well Inventory |
| Environmental | 9 |
9-4A | U.S. Army Corps of Engineers Section 404 Permit and Levee Work Permit Application--note: this is a static PDF. If you need a fillable form, save the file from the Army Corps site and open with Adobe Acrobat Reader. |
| Environmental | 9 |
9-4B | IDEM Water Quality Section 401 Permit Application (IDEM WQC Forms Link) |
| Environmental | 9 |
9-4C | IDNR Construction in Floodway Permit Application - The permit type to be checked is IC-14-28-1 Flood Control Act. |
| Environmental | 9 |
9-4D | Construction Stormwater General Permit (CSGP) Data Sheet (Rev. Mar. 2026) |
| Environmental | 9 |
9-4E | FAA Notice of Proposed Construction or Alteration in Airspace Application (FAA Forms Link) |
| Environmental | 9 |
N/A | The following five counties require additional drainage permits. Regulated Drain Permit Application – Allen County Regulated Drain Permit Application – Elkhart County Regulated Drain Permit Application – Hamilton County Regulated Drain Permit Application – Lake County Regulated Drain Permit Application – LaPorte County |
| Environmental | 205 |
205-01-01 | Erosion and Sediment Control Plan Technical Review Checklist |
| Category | IDM Ch. |
Eddoc/ Figure |
Document Title |
|---|---|---|---|
| Geotechnical | 107 |
107-01-01 | Geotechnical Waiver or Investigation Request Transmittal (Rev. Sep. 2023) |
| Geotechnical | 107 |
107-05-01 | Geotechnical Review of Final Check Prints (Rev. Sep. 2023) |
| Geotechnical | N/A |
N/A | MSE Wall Shop Drawing Review Checklist (Rev. Nov. 2024) |
| Geotechnical | N/A |
N/A | MSE Wall Design Review Checklist (Rev. Dec. 2021) |
| Category | IDM Ch. |
Eddoc/ Figure |
Document Title |
|---|---|---|---|
| INDOT Hydraulics webpage | |||
| Hydraulics | 202 |
202-2A | TR-55 Time of Concentration Worksheet |
| Hydraulics | 202 |
202-3C | Regional Multiplier for Determination of 0.2% Annual EP (GIS Shape File) (Add. Feb. 2014) |
| Hydraulics | 203 |
203-3D | Sample Scour Report (Add. May 2015) |
| Hydraulics | 203 |
203-2L | Riprap Basin Design Checklist (Del. Apr. 2022) |
| Hydraulics | 203 |
203-3C | Hydraulics Quality Assurance Checklist (Del. Apr. 2022) |
| Hydraulics | 203 |
203-4E | Inlet Spacing Computation Worksheet (Rev. Apr. 2013) |
| Hydraulics | 203 |
203-4I | Storm Drain Computation Worksheet (Rev. Apr. 2013) |
| Hydraulics | 203 |
203-5A | Summary Performance Table for Storage |
| Category | IDM Ch. |
Eddoc/ Figure |
Document Title |
|---|---|---|---|
| Lighting | 502 |
502-04-01 | Highway Lighting Accident Warrant Analysis Worksheet |
| Lighting | 502 |
502-04-02 | Service Cost per Year for Luminaire Replacement or Partial Modernization (Add. Jun. 2013) |
| Lighting | 502 |
502-04-03 | Service Cost per Year for New or Fully-Modernized Lighting (Add. Jun. 2013) |
| Category | IDM Ch. |
Eddoc/ Figure |
Document Title |
|---|---|---|---|
| INDOT Pavement Design webpage | |||
| Pavement | 601 |
601-6.0.1 | Pavement Design Request - Local Public Agency Project (Rev. Jan. 2020) Instructions for Completion of Pavement Design Request - LPA |
| Pavement | 601 |
601-6.0.2 | Pavement Design Request - INDOT Project (Rev. Apr. 2024) |
| Pavement | 601 |
601-6.0.3 | Pavement Design Request - INDOT Project Shoulder MOT (Add. Jan. 2022) |
| Category | IDM Ch. |
Eddoc/ Figure |
Document Title | |
|---|---|---|---|---|
| Proprietary Material Approval: |
Roadway and Roadside items = Highway Engineering Director Bridge items = Bridge Engineering Director Traffic items = Traffic Administration Manager |
|||
| Proprietary Materials | 17 |
17-01-01 | Proprietary Material Request | |
| Category | IDM Ch. |
Eddoc/ Figure |
Document Title |
|---|---|---|---|
| Public Involvement | N/A |
103-02-15 | Public Involvement Summary Example |
| Public Involvement | N/A |
103-02-16 | Public Involvement Notification |
| Category | IDM Ch. |
Eddoc/ Figure |
Document Title |
|---|---|---|---|
| Right-of-Way | 85 |
N/A | Right-of-Way Engineering Quality Assurance Form (consultant) |
| Right-of-Way | 85 |
85-2C | Plat No. 1 Checklist |
| Right-of-Way | 85 |
85-2F | Right-of-Way Plans Checklist |
| Right-of-Way | 85 |
85-3A | Partial Suspension of Right-of-Way Acquisition Activities |
| Right-of-Way | 85 |
85-3B | Complete Suspension of Right-of-Way Acquisition Activities |
| Right-of-Way | 86 |
86-1A | Comparative Cost Study for Local Service Roads [Form R/W-16] |
| Right-of-Way | 86 |
86-1B | Local Service Road Study (Multiple Properties) Form |
| Category | IDM Ch. |
Eddoc/ Figure |
Document Title |
|---|---|---|---|
| Survey | 22 |
22-3A | Notice of Survey Letter |
| Survey | 22 |
22-3B | Survey Interview Report Form |
| Survey | 23 |
23-2A | Guide for Checking Survey Book |
| Category | IDM Ch. |
Eddoc/ Figure |
Document Title |
|---|---|---|---|
| Traffic | 5 (Del.) |
Traffic Forecasting | Traffic Forecasting Requests are processed through ITAP. Forecast Request Decision Tree (Add. Nov. 2026) |
| Traffic | 5 (Del.) |
Crash Data | Crash Data Request - An INDOT Project Manager must contact the Office of Traffic Safety to request crash data. The AASHTOWare Safety crash data portal is available to all Indiana transportation professionals. Request access through ITAP. |
| Traffic | 55 |
55-8A | Crash Analysis Form |
| Traffic | 502 |
502-02-01 | Pavement Marking Material Summary (Add. Dec. 2021) |
| Traffic | 502 |
502-03-01 | Loop Tagging Table Instructions for Completing the Loop Tagging Table (Add. Feb. 2014) |
| Traffic | 502 |
502-03-02 | Radio Site Survey Report (Rev. Feb. 2014) |
| Traffic | 502 |
502-03-03 |
APS Study Report Form (Add. Jan. 2016) Procedure for Completing the APS Study (Operations Memo 14-01) |
| Category | IDM Ch. |
Eddoc/ Figure |
Document Title |
|---|---|---|---|
| Traffic Maintenance (MOT) | 503 |
503-2.02.1 | Significant Work Zone Impact Determination Worksheet (Rev. May 2023) |
| Traffic Maintenance (MOT) | 503 |
503-2.05.1 | Traffic Control Strategy Memo (Rev. May 2023) |
| Traffic Maintenance (MOT) | 503 |
503-2.05.2 | Detour Worksheet - Non-Interstate (Rev. May 2023) |
| Traffic Maintenance (MOT) | 503 |
503-2.05.3 | Crossover and Runaround Viability Worksheet |
| Traffic Maintenance (MOT) | 503 |
503-2.05.4 | Detour Worksheet - Interstate (Rev. May 2023) |
| Traffic Maintenance (MOT) | 503 |
503-2.06.1 | Determination of Incentive Disincentive Amount (Rev. May 2023) |
| Traffic Maintenance (MOT) | 503 |
503-3.01.1 | Traffic Control Plan Checklist (Rev. May 2023) |
| Traffic Maintenance (MOT) | 503 |
503-7.01.1 | Programming Information for Portable Changeable Message Sign |
| Traffic Maintenance (MOT) | 503 |
503-7.04.1 | Temporary Signal Type Determination |
| Category | IDM Ch. |
Eddoc/ Figure |
Document Title |
|---|---|---|---|
| Utilities | 9 |
9-4G(IL) | Trunkline Right-of-Way Permit Application – Illinois |
| Utilities | 9 |
9-4G(MI) | Trunkline Right-of-Way Permit Application – Michigan |
| Utilities | 9 |
9-4G(OH) | Trunkline Right-of-Way Permit Application – Ohio |
Contact Information
Please send all inquires to the Standards and Policy Division's shared inbox at:
DesignManualInquiries@indot.in.gov