Article
Effective for Lettings with the 2018 INDOT Standard Specifications on or after September 1, 2017
| RSP Home | Section 100 | Section 200 | Section 300 | Section 400 |
| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |
| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |
*Revision Date = Date the Recurring Special Provision was Added or Revised (mm/dd/yy)
**Letting Date = Effective for use on lettings on or after this date (mm/dd/yy) - Be sure
to select the RSP or RPD for the correct Letting date you need
Section 100 - General Provisions
RSP or RPD |
Description |
Rev. Date* |
Letting Date** |
| Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN190001 | 02/03/17 |
02/03/17 |
|
| Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN190006 | 02/03/17 |
02/03/17 |
|
| Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN______ (edit.) | 10/26/06 |
09/01/13 |
|
| FHWA - 1273 | 05/01/12 |
09/01/13 |
|
| Executive Order 11246 | 05/25/17 |
09/01/17 |
|
| Title VI Assurances | 05/21/15 |
08/01/15 |
|
| As-Built Traffic Signal Plans | 08/15/07 |
09/01/13 |
|
| Standard Specifications | 05/25/17 |
09/01/17 |
|
| Indiana Department of Administration M/WBE and IVOSB Participation Policy for Indiana Department of Transportation Construction Projects | 07/19/18 |
12/01/18 |
|
| E-Mail Submittal of Electronic Documents for Bid Express | 04/23/08 |
09/01/13 |
|
| As-Built Lighting Plans | 04/17/12 |
09/01/13 |
|
| Alternate Pavement Sections, Present Value Cost And Pavement Section For Construction Of The Mainline, Shoulders And Ramps | 06/19/15 |
09/01/15 |
|
| Cargo Preference Act | 01/07/16 |
02/01/16 |
|
| Structure Numbers for Pay Items (edit.) | 09/01/05 |
09/01/13 |
|
| Schedule of Pay Items for Option Bids (edit.) | 07/19/18 |
12/01/18 |
|
| Prequalification | 05/23/13 |
09/01/13 |
|
| Owners' and Contractors's Protective Liability Insurance Coverage for Operations of the Designated Contractor (edit.) | 05/25/17 |
09/01/17 |
|
| Wage and Payrolls Requirements | 05/18/17 |
07/01/17 |
|
| DBE Joint Check Request Form | 12/11/14 |
02/01/15 |
|
| Traffic Control Changes and On-Call Maintenance of Traffic Control Devices (edit.) | 09/01/05 |
09/01/13 |
|
| Schedule of Operations and Traffic Control for Undersealing, Concrete Patching, Placing Underdrains and Resurfacing (edit.) | 05/25/17 |
09/01/17 |
|
| Construction Engineering and Inspection for Utility Relocation | 03/01/10 |
09/01/13 |
|
| GPS Rover for Use by Project Personnel | 09/19/13 |
12/01/13 |
|
| Bridge Inspection Coordination | 01/21/16 |
09/01/16 |
|
| Environmental Restrictions | 05/23/13 |
09/01/13 |
|
| Inspection Hole | 05/21/15 |
01/01/16 |
|
| Opening Sections of Project to Traffic | 11/14/18 |
06/01/19 |
|
| Statements About Existing Conditions of Utilities, Additional Right-of-Way, and Encroachments (edit.) | 05/25/17 |
09/01/17 |
|
| Incentive For Opening Project To Traffic Ahead of Schedule (edit.) | 05/25/17 |
09/01/17 |
|
| Percentage of Work Required of Prime Contractor | 05/23/13 |
09/01/13 |
|
| Latest Date to Begin Work (edit.) | 05/25/17 |
09/01/17 |
|
| Failure to Complete on Time For Restriction(edit.) | 05/25/17 |
09/01/17 |
|
| Failure to Complete on Time for Restrictions - 2 or More Locations (edit.) | 05/25/17 |
09/01/17 |
|
| Failure to Complete on Time for Road Closure (edit.) | 05/25/17 |
09/01/17 |
|
| Failure to Complete on Time for Intermediate Completion Date (edit.) | 05/25/17 |
09/01/17 |
|
| Failure to Complete on Time for Calendar Completion Date (edit.) | 05/25/17 |
09/01/17 |
|
| Earliest Date To Begin Work (edit.) | 05/25/17 |
09/01/17 |
|
| Storm Water, Erosion, and Sediment Control Inspection Report | 04/19/12 |
09/01/13 |
|
| Critical Path Method Schedule | 05/25/17 |
09/01/17 |
|
| Contract Completion due to IDEM Notice of Termination, NOT | 02/20/14 |
03/05/14 |
|
| Contract Prosecution and Progress | 09/20/18 |
03/01/19 |
|
| Project Estimate Adjustment | 07/27/07 |
09/01/13 |
|
| PG Asphalt Binder Material Cost Adjustments | 05/25/17 |
09/01/17 |
|
| Payment for Extra Work | 07/19/17 |
10/01/17 |
|
| Dowel Bar Assembly Stockpiled Materials Requirements | 05/23/13 |
09/01/13 |
|
| State Funded Contract Requirements | 09/01/05 |
09/01/13 |