Himsel Army Airfield
Camp Atterbury provides the opportunity for aviation units to schedule aviation assets for forward area operations. Himsel Air Traffic Control Tower is operational from 0700L to 2300L daily. The Airfield Operations Office is staffed seven days a week Monday through Friday, 0700L-2300L; Saturday-Sunday, 0800L-1600L and other times as mission requires. Fuel is available Monday-Friday with 24-hour prior notice and at other times with a 72-hour notice. If a mission requires 24-hour operations, a 72-hour advance notification must be requested. The staff is here to provide knowledge of local operations and procedures, customer service and airspace de-confliction.
Camp Atterbury also provides areas for realistic flight training under VFR (Visual Flight Rules), night and night systems. Included are terrain flight areas, confined areas, and unit supported FARPs (Forward Arming and Refueling Points).
Airfield Reservation Information
Geographic Information Supporting Military Operations (GISMO) is a geospatial data viewer designed to assist users of Army National Guard installations by providing map-based query and display of installation range and training facilities.
Aviation assets for forward area operations
- Cargo Building
- Parking Ramp
- Available support equipment
Amenities
- Planning Facilities
- Aircrew Lounge
- Aircraft Support Equipment
- Runway is approximately 18/36 4050’ x 72’ and Field Elevation 709’ Mean Sea Level
- May require approach over impact area. (Ranges must be in check-fire)
Prior Permission Required (PPR) Form -- Now Online!
Complete the PPR Form Online Form, or download, complete and email the PPR PDF Form to: ng.in.inarng.mesg.haaf-operations-and-airfield-support@army.mil
Support Equipment Available for Users of Himsel Army Airfield
Note: The photos below are best viewed on a small screen. Reduce your screen size for optimal viewing.
Contact Us
Phone and Email
Himsel Army Airfield
Phone
812-526-1355
Email
ng.in.inarng.mesg.haaf-operations-and-airfield-support@army.mil
Hours
Office
Monday-Friday, 0700L to 2300L
Saturday-Sunday 0800L to 1600L
Other times as mission requires.
Tower
Monday-Sunday, 0700L to 2300L
Other times as mission requires, with notification of 5 business days.
Range Information
Department of Defense (DoD)
Visual Flight Rules (VFR)
supplement as “HIMSEL AAF”
Prior Permission Request (PPR)
Required For Arrivals
Himsel Tower or Range Control
126.2 VHF
Runway
approximately 18/36 4050’ x 72’
Field Elevation
709’ Mean Sea Level
May require approach over impact area. Ranges must be in check-fire.
Fuel
Fuel available with 24 hour's notice, 72 hour’s notice for weekend availability.
72 hours advance notice if your mission requires 24-hour operations.