Note: This message is displayed if (1) your browser is not standards-compliant or (2) you have you disabled CSS. Read our Policies for more information.
| Last Updated: 05/15/2012 |
| Category | DM Ch. |
Figure | Document Title | Units |
| Application/Request | 5 |
5-2C | Crash Statistics Request | Either |
| Application/Request | 5 |
5-ROP | Request for Old Plans (online Application, Non PDF) | Either |
| Application/Request | 9 |
9-4A | U.S. Army Corps of Engineers Section 404 Permit and Levee Work Permit Application | English |
| Application/Request | 9 |
9-4B | IDEM Water Quality Section 401 Permit Application (Link for update) | English |
| Application/Request | 9 |
9-4C | IDNR Construction in Floodway Permit Application – The permit type to be checked is IC-14-28-1 Flood Control Act. |
English |
| Application/Request | 9 |
9-4D | IDEM Storm water Runoff Rule 5 Permit Application (Link for Update) | English |
| Application/Request | 9 |
9-4E | FAA Notice of Proposed Construction or Alteration in Airspace Application (Link for update) |
English |
| Application/Request | 9 |
9-4F(02) | Regulated Drain Permit Application – Allen County | English |
| Application/Request | 9 |
9-4F(20) | Regulated Drain Permit Application – Elkhart County (Link for update) | English |
| Application/Request | 9 |
9-4F(29) | Regulated Drain Permit Application – Hamilton County (Link for update) | English |
| Application/Request | 9 |
9-4F(45) | Regulated Drain Permit Application – Lake County, Structure Placement | English |
| Application/Request | 9 |
9-4F(46) | Regulated Drain Permit Application – LaPorte County | English |
| Application/Request | 9 |
9-4G(IL) | Trunkline Right of Way Permit Application – Illinois (Link for update) | English |
| Application/Request | 9 |
9-4G(MI) | Trunkline Right of Way Permit Application – Michigan (Link for update) | English |
| Application/Request | 9 |
9-4G(OH) | Trunkline Right of Way Permit Application – Ohio (Link for update) | English |
| Application/Request | 40 |
40-8A | MTMCTEA Design Exception Request Letter | Either |
| Application/Request | 52 |
52-7A | Falling-Weight Deflectometer Testing Request | English |
| Application/Request | 52 |
52-7A | Falling-Weight Deflectometer Testing Request | Metric |
| Application/Request | 52 |
52-14A | Pavement Design Request – INDOT Project | Either |
| Application/Request | 52 |
52-14B | Pavement Design Request – Local Public Agency Project | Either |
| Application/Request | 82 |
82-2B | Traffic Maintenance Recommendations Request Memorandum to District | English |
| Application/Request | 82 |
82-2B | Traffic Maintenance Recommendations Request Memorandum to District | Metric |
| Certification | 6 |
6-Ltd Cer | Limited Review Certification (revised 10/04/05) | Either |
| Certification | 7 |
Scope/Environmental Compliance Certification/Permit Applic. Cert. (Deleted) | ||
| Certification | 7 |
7-2G | Certification of Public Hearing Held | Either |
| Certification | 7 |
7-2H | Certification of Public Hearing Afforded But Not Held | Either |
| Certification | 10 |
10-2B | Utility Coordination Certification | Either |
| Certification | 10 |
Utility Coordination Certification – Short-Term Project (Deleted) | ||
| Certification | 10 |
10-2D | Utility Coordination Certification – Waiver | Either |
| Certification | 14 |
14-1D | Asbestos Certification | Either |
| Certification | 14 |
14-1F | Contract Information Book Certification | Either |
| Certification | 17 |
17-1C | Proprietary-Material Use, No Suitable Equal Exists | Either |
| Certification | 17 |
17-1D | Proprietary-Material Use, Essential for Synchronization | Either |
| Certification | 17 |
17-1E | Public-Interest Finding for Proprietary-Material Use | Either |
| Certification | 17 |
17-1F | Programmatic Certification for Proprietary-Material Use, No suitable Equal Exists | Either |
| Certification | 18 |
18-1B | Geotechnical Review of Field Check Prints | Either |
| Checklist | 6 |
6-Ltd Chk | Limited Review Checklist (revised 10/04/05) | Either |
| Checklist | 14 |
14-1E | Final Tracings Checklist | Either |
| Checklist (Internal) | 14 |
14-1E(1) | FHWA - Indiana PS&E Checklist (INDOT staff only) | Either |
| Checklist (Internal) | 14 |
14-1E(2) | Narrative for PS&E Checklist (INDOT staff only) | Either |
| Checklist (Internal) | 14 |
14-1E(3) | PS&E Documentation required (INDOT staff only) | Either |
| Checklist | 23 |
23-2A | Guide for Checking Survey Book | Either |
| Checklist | 28 |
28-5A | Documentation Project Checklist | Either |
| Checklist | 34 |
34-5A | Energy Dissipator Checklist | English |
| Checklist | 34 |
34-5A | Energy Dissipator Checklist | Metric |
| Checklist | 34 |
34-7A | St. Anthony Falls Basin Design Checklist | Either |
| Checklist | 34 |
34-8C | Riprap Basin Design Checklist | English |
| Checklist | 34 |
34-8C | Riprap Basin Design Checklist | Metric |
| Checklist | 34 |
34-9E | Impact Basin Type VI Design Checklist | English |
| Checklist | 34 |
34-9E | Impact Basin Type VI Design Checklist | Metric |
| Checklist | 37 |
37-1A | Erosion and Sediment Control Plan Technical Review Checklist | English |
| Checklist | 37 |
37-1A | Erosion and Sediment Control Plan Technical Review Checklist | Metric |
| Checklist | 40 |
40-8B | Level One Design Criteria Checklist | English |
| Checklist | 40 |
40-8B | Level One Design Criteria Checklist | Metric |
| Checklist | 82 |
82-7A | Traffic Control Plan Checklist | English |
| Checklist | 82 |
82-7A | Traffic Control Plan Checklist | Metric |
| Checklist | 85 |
85-2C | Plat No. 1 Checklist | Either |
| Checklist | 85 |
85-2F | Right-of-Way Plans Checklist | Either |
| Cover Letter/ Memorandum | 7 |
7-2F | Documents Transmittal to Hearings Examiner and Request for Public Hearing | Either |
| Cover Letter/ Memorandum | 7 |
7-2I | Design Approval Packet Transmittal Cover Memorandum – INDOT- or Consultant-Developed Project | Either |
| Cover Letter/ Memorandum | 7 |
Design Approval Packet Transmittal Cover Memorandum – Consultant-Developed Project (Deleted) | ||
| Cover Letter/ Memorandum |
14 |
14-1Bh | Field Check Notification Letter (in house) | Either |
| Cover Letter/ Memorandum | 14 |
14-1Bc | Field Check Notification Letter (consultant) | Either |
| Cover Letter/ Memorandum | 14 |
14-1G | Construction Change | Either |
| Cover Letter/ Memorandum | 14 |
14-2B | Underground Storage Tanks Removal | Either |
| Cover Letter/ Memorandum | 17 |
17-1A | Proprietary-Material Transmittal Memorandum | Either |
| Cover Letter/ Memorandum | 22 |
22-3A | Notice of Survey Letter | Either |
| Cover Letter/ Memorandum | 40 |
40-8C | Level One Design Exception Request – NHS | Either |
| Cover Letter/ Memorandum | 40 |
Level One Design Exception Request – Non–NHS (Deleted) | ||
| Cover Letter/ Memorandum | 85 |
85-3A | Partial Suspension of Right-of-Way Acquisition Activities | Either |
| Cover Letter/ Memorandum | 85 |
85-3B | Complete Suspension of Right-of-Way Acquisition Activities | Either |
| Evaluation | 6 |
6-2A | Quality Assurance Form | Either |
| Evaluation | 6 |
6-3A | Rating / Evaluation Form – Design Plan Process with Database | Either |
| Evaluation | 6 |
6-3D | Rating / Evaluation Form – Design Exception | Either |
| Evaluation | 6 |
6-3E | Rating / Evaluation Form – Contracts Section | Either |
| Evaluation | 31 |
31-4A | Culvert Inspection Form | Either |
| Summarization | 7 |
7-2A | Design Summary – Road or Bridge Project | Either |
| Summarization | 7 |
7-2B | Design Summary –Traffic Project | Either |
| Summarization | 7 |
Design Summary – Roadway Lighting Replacement (Deleted) | ||
| Summarization | 7 |
Design Summary – Roadway Signing Replacement (Deleted) | ||
| Summarization | 7 |
Design Summary – Signalization Project (Deleted) | ||
| Summarization | 7 |
Fish and Wildlife Review Memorandum, EIS or EA. (Deleted) | ||
| Summarization | 7 |
Fish and Wildlife Review Memorandum, CE (Deleted) | ||
| Summarization | 7 |
7-3C | Environmental Consultation Form | Either |
| Summarization | 7 |
Summary of Commitments (Deleted) | ||
| Summarization | 9 |
9-4J | IDEM Class V Well Inventory | Either |
| Summarization | 14 |
14-1C | Contract-Preparation Documents to Contract Administration Division | Either |
| Summarization | 17 |
17-5K | Bridge Painting Locations and Information | English |
| Summarization | 17 |
17-5K | Bridge Painting Locations and Information | Metric |
| Summarization | 20 |
20-2A | Consultant Project Input Form | English |
| Summarization | 20 |
20-2A | Consultant Project Input Form | Metric |
| Summarization | 22 |
22-3B | Survey Interview Report Form | Either |
| Summarization | 66 |
66-1A LFD | Foundation Review | English |
| Summarization | 66 |
66-1A LRFD | Foundation Review | English |
| Summarization | 66 |
66-1A LFD | Foundation Review | Metric |
| Summarization | 66 |
66-1A LRFD | Foundation Review | Metric |
| Summarization | 83 |
83-2E | Programming Information for Portable Changeable Message Sign | Either |
| Worksheet | 17 |
17-2A | Earthwork Computation Form | English |
| Worksheet | 17 |
17-2A | Earthwork Computation Form | Metric |
| Worksheet | 30 |
30-5F | Water Surface Profile Form | Either |
| Worksheet | 31 |
31-10D | Culvert Design Form – Conventional End Treatment | English |
| Worksheet | 31 |
31-10D | Culvert Design Form – Conventional End Treatment | Metric |
| Worksheet | 31 |
31-10E | Culvert Design Form – Tapered End Treatment | English |
| Worksheet | 31 |
31-10E | Culvert Design Form – Tapered End Treatment | Metric |
| Worksheet | 31 |
31-10F | Culvert Design Form – Mitered End Treatment | English |
| Worksheet | 31 |
31-10F | Culvert Design Form – Mitered End Treatment | Metric |
| Worksheet | 36 |
36-10K | Inlet Spacing Computation Worksheet | English |
| Worksheet | 36 |
36-10K | Inlet Spacing Computation Worksheet | Metric |
| Worksheet | 36 |
36-12F | Storm Drain Computation Worksheet | English |
| Worksheet | 36 |
36-12F | Storm Drain Computation Worksheet | Metric |
| Worksheet | 36 |
36-13D | Hydraulic Grade Computer Form | Either |
| Worksheet | 38 |
38-6K | Filter Design Form | English |
| Worksheet | 38 |
38-6K | Filter Design Form | Metric |
| Worksheet | 38 |
38-6P | Riprap Size Particle Erosion Form | English |
| Worksheet | 38 |
38-6P | Riprap Size Particle Erosion Form | Metric |
| Worksheet | 38 |
38-6Q | Bank Protection Data Sheet | English |
| Worksheet | 38 |
38-6Q | Bank Protection Data Sheet | Metric |
| Worksheet | 55 |
55-8A | Accident Analysis Form | Either |
| Worksheet | 59 |
59-BSD | Bridge Search Data Form | Either |
| Worksheet | 78 |
78-2B | Highway Lighting Accident Warrant Analysis Worksheet | Either |
| Worksheet | 81 |
81-3D | Determination of Incentive/Disincentive Amount | English |
| Worksheet | 81 |
81-3D | Determination of Incentive/Disincentive Amount | Metric |
| Worksheet | 86 |
86-1A | Comparative Cost Study for Local Service Roads [Form R/W-16] | English |
| Worksheet | 86 |
86-1A | Comparative Cost Study for Local Service Roads [Form R/W-16] | Metric |
| Worksheet | 86 |
86-1B | Local Service Road Study (Multiple Properties) Form | English |
| Worksheet | 86 |
86-1B | Local Service Road Study (Multiple Properties) Form | Metric |
| Back to Forms and Manuals Page | ||||