Note: This message is displayed if (1) your browser is not standards-compliant or (2) you have you disabled CSS. Read our Policies for more information.
Documents Identified As Design Manual Figures
| Category |
DM |
Figure |
Document Title |
Units |
| Application / Request |
5 |
Traffic Projections Request |
Either |
|
| Application / Request |
5 |
Crash Statistics Request |
Either |
|
| Application / Request |
5 |
5-ROP |
Request for Old Plans (On line application, Non PDF) (Link to the Web) |
Either |
| Application / Request |
9 |
U.S. Army Corps of Engineers Section 404 Permit and Levee Work Permit Application (Link for update) |
English |
|
| Application / Request |
9 |
IDEM Water Quality Section 401 Permit Application (Link for update) |
English |
|
| Application / Request |
9 |
IDNR Construction in Floodway Permit Application (Link for update) |
English |
|
| Application / Request |
9 |
IDEM Storm water Runoff Rule 5 Permit Application (Link for update) |
English |
|
| Application / Request |
9 |
FAA Notice of Proposed Construction or Alteration in Airspace Application (Link for update) |
English |
|
| Application / Request |
9 |
9-4F(02) |
Regulated Drain Permit Application — Allen County |
English |
| Application / Request |
9 |
Regulated Drain Permit Application — Elkhart County (Link for update) |
English |
|
| Application / Request |
9 |
Regulated Drain Permit Application — Hamilton County (Link for update) |
English |
|
| Application / Request |
9 |
Regulated Drain Permit Application — Lake County, Structure Placement (Link for update) |
English |
|
| Application / Request |
9 |
9-4F(46) |
Regulated Drain Permit Application — LaPorte County |
English |
| Application / Request |
9 |
Trunkline Right of Way Permit Application — Illinois (Link for update) |
English |
|
| Application / Request |
9 |
Trunkline Right of Way Permit Application — Michigan (Link for update) |
English |
|
| Application / Request |
9 |
Trunkline Right of Way Permit Application — Ohio (Link for update) |
English |
|
| Application / Request |
40 |
MTMCTEA Design Exception Request Letter |
Either |
|
| Application / Request |
52 |
Falling-Weight Deflectometer Testing Request |
English |
|
| Application / Request |
52 |
Falling-Weight Deflectometer Testing Request |
Metric |
|
| Application / Request |
52 |
Pavement Design Request — INDOT Project |
Either |
|
| Application / Request |
52 |
Pavement Design Request — Local Public Agency Project |
Either |
|
| Application / Request |
82 |
Traffic Maintenance Recommendations Request Memorandum to District |
English |
|
| Application / Request |
82 |
Traffic Maintenance Recommendations Request Memorandum to District |
Metric |
|
| Certification |
6 |
Limited Review Certification (revised 10/04/05) |
Either |
|
| Certification |
7 |
Scope / Environmental Compliance Certification / Permit Applic. Cert. |
Either |
|
| Certification |
7 |
Certification of Public Hearing Held |
Either |
|
| Certification |
7 |
Certification of Public Hearing Afforded But Not Held |
Either |
|
| Certification |
10 |
Utility Coordination Certification |
Either |
|
| Certification |
10 |
|
Utility Coordination Certification — Short-Term Project (Deleted) |
Either |
| Certification |
10 |
Utility Coordination Certification — Waiver |
Either |
|
Certification |
14 |
Asbestos Certification |
Either |
|
| Certification |
14 |
Contract Information Book Certification |
Either |
|
| Certification |
17 |
Justification for Use of Proprietary Material |
Either |
|
| Certification |
18 |
Geotechnical Review of Field Check Prints |
Either |
|
| Checklist |
6 |
Limited Review Checklist (revised 10/04/05) |
Either |
|
Checklist |
14 |
Final Tracings Checklist |
Either |
|
| Checklist |
23 |
Guide for Checking Survey Book |
Either |
|
| Checklist |
28 |
Documentation Project Checklist |
Either |
|
| Checklist |
34 |
Energy Dissipator Checklist |
English |
|
| Checklist |
34 |
Energy Dissipator Checklist |
Metric |
|
| Checklist |
34 |
St. Anthony Falls Basin Design Checklist |
Either |
|
| Checklist |
34 |
Riprap Basin Design Checklist |
English |
|
| Checklist |
34 |
Riprap Basin Design Checklist |
Metric |
|
| Checklist |
34 |
Impact Basin Type VI Design Checklist |
English |
|
| Checklist |
34 |
Impact Basin Type VI Design Checklist |
Metric |
|
| Checklist |
37 |
Erosion and Sediment Control Plan Technical Review Checklist |
English |
|
| Checklist |
37 |
Erosion and Sediment Control Plan Technical Review Checklist |
Metric |
|
| Checklist |
40 |
Level One Design Criteria Checklist |
English |
|
| Checklist |
40 |
Level One Design Criteria Checklist |
Metric |
|
| Checklist |
82 |
Traffic Control Plan Checklist |
Either |
|
| Checklist |
85 |
Plat No. 1 Checklist |
Either |
|
| Checklist |
85 |
Right-of-Way Plans Checklist |
Either |
|
| Cover Letter/Memorandum |
7 |
Documents Transmittal to Hearings Examiner and Request for Public Hearing |
Either |
|
| Cover Letter/Memorandum |
7 |
Design Approval Packet Transmittal Cover Memorandum - INDOT- or Consultant-Developed Project |
Either |
|
| Cover Letter/Memorandum |
7 |
|
Design Approval Packet Transmittal Cover Memorandum - Consultant - Developed Project (Deleted) |
Either |
| Cover Letter/Memorandum |
14 |
Field Check Notification Letter (in house) |
Either |
|
| Cover Letter/Memorandum | 14 |
Field Check Notification Letter (consultant) |
Either |
|
| Cover Letter/Memorandum |
14 |
Construction Change |
Either |
|
| Cover Letter/Memorandum |
14 |
Underground Storage Tanks Removal |
Either |
|
| Cover Letter/Memorandum |
20 |
Consultant Project Input Form |
English |
|
| Cover Letter/Memorandum |
22 |
Notice of Survey Letter |
Either |
|
| Cover Letter/Memorandum |
40 |
Level One Design Exception Request - NHS |
Either |
|
| Cover Letter/Memorandum |
40 |
Level One Design Exception Request - Non-NHS |
Either |
|
| Cover Letter/Memorandum |
85 |
Partial Suspension of Right-of-Way Acquisition Activities |
Either |
|
| Cover Letter/Memorandum |
85 |
Complete Suspension of Right-of-Way Acquisition Activities |
Either |
|
| Evaluation |
6 |
Quality Assurance Form |
Either |
|
| Evaluation | 6 |
Rating/Evaluation Form - Design Plan Process w/Database (For INDOT internal use only. Requires Adobe 7.0 Professional not Reader) Figure is currently active, but will soon be superseded by Figure 6-3A1 |
Either |
|
| Evaluation | 6 |
Rating/Evaluation Form - Design Plan Process (For Consultant use or internal use if you do not have Adobe 7.0 Professional.) Figure is currently active, but will soon be superseded by Figure 6-3A1 |
Either |
|
| Evaluation | 6 |
Evaluation Form 082708 (Requires Adobe Professional 7.0 and a computer DSN PSCSACCESS connection) |
Either |
|
| Evaluation |
6 |
Rating / Evaluation Form — Design Exception |
Either |
|
| Evaluation |
6 |
Rating / Evaluation Form — Contracts Section |
Either |
|
| Evaluation |
31 |
Culvert Inspection Form |
Either |
|
| Summarization |
7 |
Design Summary - Road or Bridge Project |
Either |
|
| Summarization |
7 |
Design Summary - Traffic Project |
Either |
|
| Summarization |
7 |
|
Design Summary — Roadway Lighting Replacement (Deleted) |
Either |
| Summarization |
7 |
|
Design Summary — Roadway Signing Replacement (Deleted) |
Either |
|
Summarization |
7 |
|
Design Summary — Signalization Project (Deleted) |
Either |
| Summarization |
7 |
Fish and Wildlife Review Memorandum, EIS or EA. |
Either |
|
|
Summarization |
7 |
Fish and Wildlife Review Memorandum, CE |
Either |
|
|
Summarization |
7 |
Summary of Commitments |
Either |
|
| Summarization |
9 |
IDEM Class V Well Inventory |
Either |
|
| Summarization |
14 |
Contract-Preparation Documents to Contract Administration Division |
Either |
|
Summarization | 17 |
Bridge Painting Locations and Information |
Either |
|
| Summarization |
22 |
Survey Interview Report Form |
Either |
|
| Summarization |
66 |
Foundation Review |
Either |
|
| Worksheet |
17 |
Earthwork Computation Form |
English | |
| Worksheet |
17 |
Earthwork Computation Form |
Metric |
|
| Worksheet |
30 |
Water Surface Profile Form |
Either |
|
| Worksheet |
31 |
Culvert Design Form — Conventional End Treatment |
English |
|
| Worksheet |
31 |
Culvert Design Form — Conventional End Treatment |
Metric |
|
| Worksheet |
31 |
Culvert Design Form — Tapered End Treatment |
English |
|
| Worksheet |
31 |
Culvert Design Form — Tapered End Treatment |
Metric |
|
| Worksheet |
31 |
Culvert Design Form — Mitered End Treatment |
English |
|
| Worksheet |
31 |
Culvert Design Form — Mitered End Treatment |
Metric |
|
| Worksheet |
36 |
Inlet Spacing Computation Worksheet |
English |
|
| Worksheet |
36 |
Inlet Spacing Computation Worksheet |
Metric |
|
| Worksheet |
36 |
Storm Drain Computation Worksheet |
English |
|
| Worksheet |
36 |
Storm Drain Computation Worksheet |
Metric |
|
| Worksheet |
36 |
Hydraulic Grade Computer Form |
Either |
|
| Worksheet |
38 |
Filter Design Form |
English |
|
| Worksheet |
38 |
Filter Design Form |
Metric |
|
| Worksheet |
38 |
Riprap Size Particle Erosion Form |
English |
|
| Worksheet | 38 |
Riprap Size Particle Erosion Form |
Metric |
|
| Worksheet |
38 |
Bank Protection Data Sheet |
English |
|
| Worksheet |
38 |
Bank Protection Data Sheet |
Metric |
|
| Worksheet |
55 |
Accident Analysis Form |
Either |
|
| Worksheet |
59 |
Bridge Search Data Form |
Either |
|
| Worksheet |
78 |
Highway Lighting Accident Warrant Analysis Worksheet |
Either |
|
| Worksheet |
81 |
Determination of Incentive / Disincentive Amount |
English |
|
| Worksheet |
81 |
Determination of Incentive / Disincentive Amount |
Metric |
|
| Worksheet |
86 |
Comparative Cost Study for Local Service Roads [Form R/W-16] |
English |
|
| Worksheet |
86 |
Comparative Cost Study for Local Service Roads [Form R/W-16] |
Metric |
|
| Worksheet |
86 |
Local Service Road Study (Multiple Properties) Form |
English |
|
| Worksheet |
86 |
Local Service Road Study (Multiple Properties) Form |
Metric |