Header

  Close Menu
Section 200 RSPs

Article

Section 200 RSPs and Plan Details

Effective for Lettings with the 2018 INDOT Standard Specifications on or after September 1, 2017


| RSP Home | Section 100 | Section 200 | Section 300 | Section 400 |

| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |

*Revision Date = Date the Recurring Special Provision was Added or Revised (mm/dd/yy)
**Letting Date = Effective for use on lettings on or after this date (mm/dd/yy) - Be sure to select the RSP or RPD for the correct letting date you need

Section 200 - Earthwork


RSP or RPD
Description
Rev. Date*
Letting Date**
Recycled Foundry Sand
06/18/15
09/01/15
Initial Payment for Clearing Right-of-Way (edit.)
06/08/15
09/01/15
Debris Removal at Bridge Structures
05/01/15
09/01/15
Open Burning of Natural Growth Permitted
05/23/13
09/01/13
Air-Curtained Open-Pit Incineration of Natural Growth Required
05/23/13
09/01/13
Houses and Buildings Demolition (edit.)
11/14/18
06/01/19
Inspection and Testing for Asbestos Material
05/25/17
09/01/17
Removal of Existing Traffic Signal Equipment (edit.)
11/30/06
09/01/13
Marion County Borrow Areas
05/25/17
09/01/17
Borrow Area Wetland Enhancement
05/25/17
09/01/17
Embankments Constructed of Coal Combustion By-Products
05/23/13
09/01/13
Excavation and Embankment
09/20/18
03/01/19
Temporary Turbidity Curtain
02/21/13
09/01/13
Temporary Erosion Control Turbidity Curtain
02/21/13
07/01/13
Storm Water Management
05/25/17
09/01/17
Steel Sheet Piling at Railroad Grade Separation
05/25/17
09/01/17
Subgrade
09/21/17
07/01/18
Gore Area Treatment
05/23/13
09/01/13
Geocell Confining System
09/21/17
07/01/18

News and FAQs

INDOT Events

Click here to view more events

Top FAQs