Article
Division 800 RSPs and Plan Details
- INDOT
- Doing Business with INDOT
- Standards & Specifications
- RSP Home
- Current: Division 800 RSPs and Plan Details
Effective for Lettings with the 2020 INDOT Standard Specifications
| RSP Home | Division 100 | Division 200 | Division 300 | Division 400 |
| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |
| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |
*Revision Date = Date the Recurring Special Provision was Added or Revised (mm/dd/yy)
**Letting Date = Effective for use on lettings on or after this date (mm/dd/yy) - Be sure to select the RSP or RPD for the correct letting date you need
Division 800 - Traffic Control Devices and Lighting
RSP or RPD |
Description |
Rev. Date* |
Letting Date** |
Certification for Temporary Traffic Control Devices | 05/23/13 |
09/01/13 |
|
Temporary U-turns for Contractor's Vehicles | 05/25/17 |
09/01/17 |
|
Mobile Construction Signs | 09/01/05 |
09/01/13 |
|
Material Used for Temporary Ingress/Egress to Properties | 05/23/13 |
09/01/13 |
|
Worksite Added Penalty Sign | 03/16/17 |
09/01/17 |
|
Law Enforcement Officer for Work Zone Safety | 03/04/21 |
03/04/21 |
|
Maintaining Existing Traffic Signal Installation | 09/01/05 |
09/01/13 |
Temporary Pavement Markings | 09/17/20 |
03/01/21 |
Traffic Control Device Report | 09/01/05 |
09/01/13 |
|
Traffic Control For Traffic Breaks | 05/25/17 |
09/01/17 |
|
Lane Ends Warning Signs | 05/21/15 |
08/01/15 |
|
Temporary Traffic Barriers | 05/02/19 |
09/01/19 |
|
Temporary Portable Rumble Strips | 05/02/19 |
09/01/19 |
|
Temporary Portable Rumble Strip Installation | 08/20/15 |
01/01/16 |
|
Portable Signal Inspection Checklist | 12/17/15 |
09/01/16 |
|
Temporary Signal Timing Plan | 12/17/15 |
09/01/16 |
|
Lane Closures | 11/17/17 |
11/17/17 |
|
Next Level Roads Signs (Plan Details) | 09/21/17 |
01/01/18 |
|
Truck Mounted Attenuators | 06/18/20 |
12/01/20 |
|
Truck Mounted Attenuators (Plan Details) | 06/18/20 |
12/01/20 |
|
Basis of Payment for Construction Signs | 01/21/21 |
06/01/21 |
|
Sign Box Truss Structure Extended Span (Plan Details) | 09/19/19 |
03/01/20 |
|
Sign, Ground Mounted, Reset | 02/20/20 |
09/01/20 |
|
Lane Separators | 07/17/14 |
12/01/14 |
|
Department Furnished Materials (edit.) | 05/23/13 |
09/01/13 |
|
Loop Testing Table | 09/01/05 |
09/01/13 |
|
Electrical Insulation Sealant | 05/18/17 |
09/01/17 |
|
Traffic Signal Equipment Salvaged by the Department (edit.) | 05/23/11 |
09/01/13 |
|
Signal Bulb Replacement, Aerial Inspection, and Loop Replacement (edit.) | 05/23/13 |
09/01/13 |
|
Traffic Signal Maintenance and Repair | 05/23/13 |
09/01/13 |
|
Video Vehicle Detector System | 05/23/13 |
09/01/13 |
|
Integrated Video Vehicle Detector System | 05/23/13 |
09/01/13 |
|
Wireless Vehicle Detection System | 01/18/18 |
06/01/18 |
|
Wireless Vehicle Detectors | 07/17/14 |
03/01/15 |
|
Radio Site Survey Report (edit.) | 04/19/12 |
09/01/13 |
|
Magnetometers and Microloop Detectors | 05/16/13 |
09/01/13 |
|
Radio Interconnection | 05/16/13 |
09/01/13 |
|
Preformed Pave-Over Loops | 02/21/13 |
09/01/13 |
|
Accessible Pedestrian Signals with Speech Walk Messages (edit.) | 11/22/13 |
03/01/14 |
|
Traffic Signals | 05/21/20 |
12/01/20 |
|
Highway Illumination Maintenance and Repair | 05/23/13 |
09/01/13 |
|
High Pressure Sodium Luminaires | 01/19/17 |
09/01/17 |
|
Highway Illumination | 05/21/20 |
12/01/20 |
|
Refurbished Snowplowable Raised Pavement Marker Castings | 05/02/19 |
09/01/19 |
|
Retro-Reflectivity Testing | 12/19/19 |
06/01/20 |