Division 200 RSPs

Article

Division 200 RSPs and Plan Details

Effective for Lettings with the 2020 INDOT Standard Specifications


| RSP Home | Division 100 | Division 200 | Division 300 | Division 400 |

| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |

*Revision Date = Date the Recurring Special Provision was Added or Revised (mm/dd/yy)
**Letting Date = Effective for use on lettings on or after this date (mm/dd/yy) - Be sure to select the RSP or RPD for the correct letting date you need

Division 200 - Earthwork


RSP or RPD
Description
Revision Date*
Letting Date**
Recycled Foundry Sand
06/18/15
09/01/15
Initial Payment for Clearing Right-of-Way (edit.)
05/02/19
09/01/19
Debris Removal at Bridge Structures
05/02/19
09/01/19
Open Burning of Natural Growth Permitted
05/23/13
09/01/13
Air-Curtained Open-Pit Incineration of Natural Growth Required
05/23/13
09/01/13
Houses and Buildings Demolition (edit.)
11/14/18
06/01/19
Inspection and Testing for Asbestos Material
05/02/19
09/01/19
Removal of Structures and Obstructions
10/17/19
06/01/20
Removal of Existing Traffic Signal Equipment (edit.)
11/30/06
09/01/13
Marion County Borrow Areas
05/02/19
09/01/19
Borrow Area Wetland Enhancement
05/02/19
09/01/19
Method of Making Strength, Stiffness and Density Tests
02/20/20
09/01/20
Granular Tire Shreds
09/19/19
03/01/20
Geotechnical Instrumentation
09/19/19
03/01/20
Temporary Turbidity Curtain
02/21/13
09/01/13
Temporary Erosion Control Turbidity Curtain
02/21/13
07/01/13
Stormwater Management
01/16/20
09/01/20
Steel Sheet Piling at Railroad Grade Separation
05/02/19
09/01/19
Structure Excavation
12/19/19
06/01/20
Dewatering
05/21/20
12/01/20
Subgrade Treatment
02/20/20
09/01/20
Gore Area Treatment
05/02/19
09/01/19
Flowable Backfill
09/19/19
03/01/20
Chemical Modification of Soils
02/20/20
09/01/20
Cement Stabilized Subgrade Soil
11/19/20
06/01/21