Article

Division 100 RSPs and Plan Details

Effective for Lettings with the 2020 INDOT Standard Specifications


| RSP Home | Division 100 | Division 200 | Division 300 | Division 400 |

| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |

*Revision Date = Date the Recurring Special Provision was Added or Revised (mm/dd/yy)
**Letting Date = Effective for use on lettings on or after this date (mm/dd/yy) - Be sure to select the RSP or RPD for the correct Letting date you need

Division 100 - General Provisions


RSP or RPD
Description
Rev. Date*
Letting Date**
Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN20200001
02/03/17
02/03/17
Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN20200006
02/03/17
02/03/17
Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN______ (edit.)
10/26/06
09/01/13
FHWA - 1273
05/01/12
09/01/13
Executive Order 11246
05/02/19
09/01/19
Title VI Assurances
05/21/15
08/01/15
As-Built Traffic Signal Plans
08/15/07
09/01/13
Standard Specifications
05/02/19
09/01/19
Indiana Department of Administration M/WBE and IVOSB Participation Policy for Indiana Department of Transportation Construction Projects
07/19/18
12/01/18
E-Mail Submittal of Electronic Documents for Bid Express
04/23/08
09/01/13
As-Built Lighting Plans
04/17/12
09/01/13
Alternate Pavement Divisions, Present Value Cost And Pavement Division For Construction Of The Mainline, Shoulders And Ramps (edit.)
06/19/15
09/01/15
Cargo Preference Act
01/07/16
02/01/16
Structure Numbers for Pay Items (edit.)
09/01/05
09/01/13
Schedule of Pay Items for Option Bids (edit.)
07/19/18
12/01/18
Prequalification
05/02/19
09/01/19
Owners' and Contractors's Protective Liability Insurance Coverage for Operations of the Designated Contractor (edit.)
05/02/19
09/01/19
DBE Joint Check Request Form
12/11/14
02/01/15
Traffic Control Changes and On-Call Maintenance of Traffic Control Devices (edit.)
09/11/19
09/01/19
Schedule of Operations and Traffic Control for Undersealing, Concrete Patching, Placing Underdrains and Resurfacing (edit.)
05/02/19
09/01/19
Construction Engineering and Inspection for Utility Relocation
03/01/10
09/01/13
GPS Rover for Use by Project Personnel
09/19/13
12/01/13
Bridge Inspection Coordination (edit.)
01/21/16
09/01/16
Buy America Requirements
06/18/20
12/01/20
Environmental Restrictions
05/02/19
09/01/19
Inspection Hole
05/21/15
01/01/16
Maintaining Pedestrian Accessibility During Construction
02/20/20
09/01/20
Statements About Existing Conditions of Utilities, Additional Right-of-Way, and Encroachments (edit.)
05/02/19
09/01/19
Incentive For Opening Project To Traffic Ahead of Schedule (edit.)
05/02/19
09/01/19
Percentage of Work Required of Prime Contractor
05/23/13
09/01/13
Latest Date to Begin Work (edit.)
05/02/19
09/01/19
Failure to Complete on Time For Restriction (edit.)
05/02/19
09/01/19
Failure to Complete on Time for Restrictions - 2 or More Locations (edit.)
05/02/19
09/01/19
Failure to Complete on Time for Road Closure (edit.)
09/19/19
03/01/20
Failure to Complete on Time for Intermediate Completion Date (edit.)
05/02/19
09/01/19
Failure to Complete on Time for Calendar Completion Date (edit.)
05/02/19
09/01/19
Earliest Date To Begin Work (edit.)
05/02/19
09/01/19
Storm Water, Erosion, and Sediment Control Inspection Report
04/19/12
09/01/13
Critical Path Method Schedule
05/02/19
09/01/19
Contract Completion due to IDEM Notice of Termination, NOT
02/20/14
03/05/14
Subcontractor Payment Verification
12/19/19
06/01/20
Project Estimate Adjustment
07/27/07
09/01/13
Dowel Bar Assembly Stockpiled Materials Requirements
05/23/13
09/01/13
State Funded Contract Requirements
09/01/05
09/01/13