Language Translation
  Close Menu

Permits on Notice

The following are public notice documents as they have appeared in the newspaper of largest circulation in the county in which the discharging facility resides. The draft permits will remain on public notice for a period of 30 days from the date at the top of the public notice document to allow for public comments. All public comments, or requests for extension of the comment period, must be submitted in writing to:

Indiana Department of Environmental Management
Office of Water Quality - Permits Branch
100 N. Senate Ave.
Indianapolis, Indiana 46204

And must be received prior to the expiration of the public notice period.

The permits listed for final issuance will remain open for appeal for a period of 18 days. This period is available for the request of an adjudicatory hearing (appeal) of a permit being issued, not for public comment.

Allen County Onsite Residential Sewage Disposal Systems

Allen County Onsite Residential Sewage Discharging Disposal Systems 2018 Draft NPDES General Permit ING410000

American Suburban Utilities/Carriage Estates III WWTP

Carriage Estates III Wastewater Treatment Plant 2016 Final NPDES Permit

  • Carriage Estates III WWTP Major Final Renewal 2016 (Currently Unavailable)

Carriage Estates III Wastewater Treatment Plant 2015 Draft NPDES Permit

ArcelorMittal Indiana Harbor Central

ArcelorMittal Indiana Harbor Central Final NPDES Permit Renewal

  • ArcelorMittal Indiana Harbor Central IN0063711 Final NPDES Permit Renewal (Currently Unavailable)

ArcelorMittal Indiana Harbor Central Draft NPDES Permit Renewal

ArcelorMittal Indiana Harbor East

ArcelorMittal Indiana Harbor East Final NPDES Permit Renewal

  • ArcelorMittal Indiana Harbor East IN0000094 Final NPDES Permit Renewal (Currently Unavailable)

ArcelorMittal Indiana Harbor East Draft NPDES Permit Renewal

ArcelorMittal Indiana Harbor West

ArcelorMittal Indiana Harbor West Final NPDES Permit Renewal

  • ArcelorMittal Indiana Harbor West IN0000205 Final NPDES Permit Renewal (Currently Unavailable)

ArcelorMittal Indiana Harbor West Draft NPDES Permit Renewal

Danville Site-specific Water Effects Ratio Study for Copper

Danville Site-specific Water Effects Ratio Study for Copper

Groundwater Petroleum Remediation

Groundwater Petroleum Remediation Final 2015 General NPDES Permit

Hydrostatic Testing of Commercial Pipelines

Hydrostatic Testing of Commercial Pipelines Final 2015 General NPDES Permit

Once Through Noncontact Cooling Water

Once Through Noncontact Cooling Water Final 2015 General NPDES Permit

Pesticide General Permit

Pesticide Final 2016 General NPDES Permit

Petroleum Products Terminal

Petroleum Products Terminal Final 2015 General NPDES Permit

Sand, Gravel, Dimension Stone and Crushed Stone

Sand, Gravel, Dimension Stone, and Crushed Stone Final 2015 General NPDES Permit

Temporary Discharge General Permit

Temporary Discharge Final NPDES General Permit ING420000

 Top FAQs