Effective for Lettings with the 2022 INDOT Standard Specifications
| RSP Home | Division 100 | Division
200 | Division 300 | Division 400 |
| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |
| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |
*Revision Date = Date the Recurring Special Provision was Added or Revised (mm/dd/yy)
**Letting Date = Effective for use on lettings on or after this date (mm/dd/yy) - Be sure to select the RSP or RPD for
the correct letting date you need
Division 700 - Structures
RSP or RPD |
Description |
Revision Date* |
Letting Date** |
| Bridge Load Rating Calculations and Summary (edit.) | 04/25/21 |
09/01/21 |
|
| Pile Driving (edit.) | 04/19/11 |
09/01/13 |
|
| Structures | 05/20/21 |
12/01/21 |
|
| Structural Concrete and Use of Optimized Aggregate Gradation in Concrete | 10/20/22 |
03/01/23 |
|
| Headwalls, Wingwalls, and Footings Construction on an Existing Structure | 09/16/21 |
03/01/22 |
|
| Bar Bending Details | 06/17/21 |
12/01/21 |
|
| Reinforcing Bars | 09/15/22 |
03/01/23 |
|
| Bridge Railing Type TS-1; Guardrail Transition Type TGS-1 | 04/15/10 |
09/01/11 |
|
| Precast and Precast, Prestressed Concrete Structural Members | 09/15/22 |
03/01/23 |
|
| Steel Structures | 04/25/21 |
09/01/21 |
|
| Waterproofing Membrane for Reinforced-Concrete Box Structures and Three-Sided Structures | 10/21/21 |
03/01/22 |
|
| Reinforced Concrete Box Structures | 11/18/22 |
06/01/23 |
|
| Pipe Culverts, and Storm and Sanitary Sewers | 05/20/21 |
12/01/21 |
|
| Underdrain Outlet Pipe Requirements | 10/21/21 |
03/01/22 |
|
| Curb Inlet Casting | 04/25/21 |
09/01/21 |
|
| Longitudinal Grooving for the RCBA, Concrete Floor Slabs, and Concrete Bridge Deck Overlays Surfaces | 01/20/22 |
09/01/22 |
|
| Bridge Deck Overlays | 06/16/22 |
12/01/22 |
|
| Reinforced Concrete Three-Sided Structures | 11/18/22 |
06/01/23 |
|
| Approved Expansion Joint SS Devices | 03/21/06 |
09/01/13 |
|
| Alternate SS Joint Part | 01/22/01 |
01/22/01 |
|
| Cured-In-Place Pipe Liner, CIPP | 09/16/21 |
03/01/22 |
|
| Slip Lining of Existing Pipe | 10/21/21 |
03/01/22 |
|
| Drilled Shaft Foundations | 04/25/21 |
09/01/21 |
|
| Mechanically Stabilized Earth Retaining Walls | 12/17/21 |
06/01/22 |
|
| Mechanically Stabilized Earth Retaining Walls | 11/18/22 |
06/01/23 |
|
| Limiting Movement Criteria For Permanent Earth Retention System For Cut-Wall Application (edit.) | 08/20/09 |
09/01/13 |
|
| Polymeric Concrete Bridge Deck Overlay | 12/16/22 |
03/01/23 |