Effective for Lettings with the 2022 INDOT Standard Specifications
| RSP Home | Division 100 | Division
200 | Division 300 | Division 400 |
| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |
| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |
*Revision Date = Date the Recurring Special Provision was Added or Revised (mm/dd/yy)
**Letting Date = Effective for use on lettings on or after this date (mm/dd/yy) - Be sure to select the RSP or RPD for
the correct letting date you need
Division 100 - General Provisions
RSP or RPD |
Description |
Rev. Date* |
Letting Date** |
| Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN20230001 | 06/16/22 |
01/06/23 |
|
| Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN20230006 | 06/16/22 |
01/06/23 |
|
| Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN______ (edit.) | 06/16/22 |
12/01/22 |
|
| FHWA - 1273 | 07/05/22 |
09/06/22 |
|
| Executive Order 11246 | 05/02/19 |
09/01/19 |
|
| Title VI Assurances | 05/21/15 |
08/01/15 |
|
| As-Built Traffic Signal Plans | 08/15/07 |
09/01/13 |
|
| As-Built Traffic Signal Plans | 01/19/23 |
06/01/23 |
|
| Standard Specifications | 04/25/21 |
09/01/21 |
|
| Indiana Department of Administration M/WBE and IVOSB Participation Policy for Indiana Department of Transportation Construction Projects | 07/19/18 |
12/01/18 |
|
| E-Mail Submittal of Electronic Documents for Bid Express | 04/23/08 |
09/01/13 |
|
| As-Built Lighting Plans | 04/17/12 |
09/01/13 |
|
| As-Built Lighting Plans | 01/19/23 |
06/01/23 |
|
| Alternate Pavement Divisions, Present Value Cost And Pavement Division For Construction Of The Mainline, Shoulders And Ramps (edit.) | 06/19/15 |
09/01/15 |
|
| Cargo Preference Act | 01/07/16 |
02/01/16 |
|
| MBE, WBE, and IVOSB Participation Plan Protocols | 06/17/21 |
12/01/21 |
|
| Structure Numbers for Pay Items (edit.) | 09/01/05 |
09/01/13 |
|
| Schedule of Pay Items for Option Bids (edit.) | 04/25/21 |
09/01/21 |
|
| Prequalification | 05/02/19 |
09/01/19 |
|
| Owners' and Contractors's Protective Liability Insurance Coverage for Operations of the Designated Contractor (edit.) | 05/02/19 |
09/01/19 |
|
| DBE Joint Check Request Form | 12/11/14 |
02/01/15 |
|
| Indiana-Kentucky DBE Reciprocity | 06/17/21 |
12/01/21 |
|
| Submittal of DBE Quotes | 06/17/21 |
12/01/21 |
|
| DBE Affirmative Action Certificate Protocols | 06/17/21 |
12/01/21 |
|
| Traffic Control Changes and On-Call Maintenance of Traffic Control Devices (edit.) | 09/11/19 |
09/01/19 |
|
| Schedule of Operations and Traffic Control for Undersealing, Concrete Patching, Placing Underdrains and Resurfacing (edit.) | 04/25/21 |
09/01/21 |
|
| Construction Engineering and Inspection for Utility Relocation | 03/01/10 |
09/01/13 |
|
| GPS Rover for Use by Project Personnel | 09/19/13 |
12/01/13 |
|
| Bridge Inspection Coordination (edit.) | 01/21/16 |
09/01/16 |
|
| Plans and Working Drawings | 06/16/22 |
12/01/22 |
|
| Coordination of Pre-Bid Questions and Answers as Documents | 06/16/22 |
12/01/22 |
|
| E-Ticketing Information | 03/17/22 |
09/01/22 |
|
| Build America, Buy America Act Requirements | 11/18/22 |
02/01/23 |
|
| Buy America Requirements | 11/18/22 |
02/01/23 |
|
| Environmental Restrictions | 05/02/19 |
09/01/19 |
|
| Inspection Hole | 05/21/15 |
01/01/16 |
|
| Maintaining Pedestrian Accessibility During Construction | 02/20/20 |
09/01/20 |
|
| Migratory Bird Protection | 09/16/21 |
03/01/22 |
|
| Statements About Existing Conditions of Utilities, Additional Right-of-Way, and Encroachments (edit.) | 05/02/19 |
09/01/19 |
|
| Incentive For Opening Project To Traffic Ahead of Schedule (edit.) | 04/25/21 |
09/01/21 |
|
| Percentage of Work Required of Prime Contractor | 05/23/13 |
09/01/13 |
|
| Latest Date to Begin Work (edit.) | 04/25/21 |
09/01/21 |
|
| Failure to Complete on Time For Restriction (edit.) | 04/25/21 |
09/01/21 |
|
| Failure to Complete on Time for Restrictions - 2 or More Locations (edit.) | 04/25/21 |
09/01/21 |
|
| Failure to Complete on Time for Road Closure (edit.) | 04/25/21 |
09/01/21 |
|
| Failure to Complete on Time for Intermediate Completion Date (edit.) | 06/16/22 |
12/01/22 |
|
| Failure to Complete on Time for Calendar Completion Date (edit.) | 04/25/21 |
09/01/21 |
|
| Earliest Date To Begin Work | 03/17/22 |
09/01/22 |
|
| Storm Water, Erosion, and Sediment Control Inspection Report | 04/19/12 |
09/01/13 |
|
| Critical Path Method Schedule | 04/25/21 |
09/01/21 |
|
| Contract Completion due to IDEM Notice of Termination (NOT) | 03/17/22 |
09/01/22 |
|
| Prosecution of Work | 06/17/21 |
12/01/21 |
|
| Project Estimate Adjustment | 07/27/07 |
09/01/13 |
|
| Dowel Bar Assembly Stockpiled Materials Requirements | 05/23/13 |
09/01/13 |
|
| State Funded Contract Requirements | 09/01/05 |
09/01/13 |