Indiana Department of Transportation
INDOT > Doing Business with INDOT Recurring Special Provisions & Plan Details
Effective for Lettings on or after September 1, 2007
| RSP Home | Section 100 | Section
200 | Section 300 | Section 400 |
| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |
| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |
*Revision Date = Date the Recurring Special Provision was Added or Revised
**Letting Date = Effective for use on lettings on or after this date - Be sure to select the RSP or RPD for
the correct letting date you need
Section 700 - Structures
RSP or RPD |
Description |
Rev. Date* |
Letting Date** |
Bitumen Coating for Piles | 09/01/05 |
09/01/07 |
|
Oversized Predrilled Pile Holes for Integral End Bent Structures | 09/01/05 |
09/01/07 |
|
Pile Driving and Equipment Data Form | 11/05/99 |
09/01/07 |
|
Pile Driving (editable MS Word) | 09/01/05 |
09/01/07 |
|
Oversized Predrilled Pile Holes and Bentonite Grout for Reduction of Pile Downdrag | 09/01/05 |
09/01/07 |
|
Polychloropene Joint Membrane | 08/21/08 |
12/01/08 |
|
Reinforcing Bars | 08/21/08 |
01/01/09 |
|
Reinforcing Bars for Metric Designed Contracts | 09/04/08 |
09/01/07 |
|
Bridge Railing Type TS-1 & Guardrail Transition Type TGS-1 | 07/01/01 |
09/01/07 |
|
Alternate Prestressed Precast Concrete I-Beam to Standard AASHTO Type IV Prestressed Precast Concrete I-Beam | 09/01/05 |
09/01/07 |
|
Interior Diaphragms | 05/24/06 |
09/01/07 |
|
Precast and Precast Prestressed Concrete Structural Members | 11/20/08 |
02/01/09 |
|
Surface Seal for Steel Bridge to be Painted | 09/01/05 |
09/01/07 |
|
Patching Concrete Structures and Repointing Masonry in Structures | 03/19/07 |
09/01/07 |
|
Temporary Pipe | 09/01/05 |
09/01/07 |
|
Oversize Precast Reinforced Concrete Box Culvert | 11/01/06 |
09/01/07 |
|
Pipe Height of Cover Limits | 12/09/08 |
02/01/09 |
|
Alternates to Structural Plate Structures | 11/01/06 |
09/01/07 |
|
Extension of Cast Iron Floor Drains | 09/01/05 |
09/01/07 |
|
Capped Inlet | 09/01/05 |
09/01/07 |
|
Drainage Structures | 09/01/05 |
09/01/07 |
|
HMA Pavement Wedge at RCBA | 06/15/06 |
09/01/07 |
|
Precast Reinforced Concrete 3-Sided Drainage Structures | 05/17/07 |
09/01/07 |
|
Approved Expansion Joint SS Devices | 03/21/06 |
09/01/07 |
|
Expansion Joint Sealing System | 07/14/06 |
09/01/07 |
|
Alternate SS Joint Part | 01/22/01 |
09/01/07 |
|
Slip Lining of Existing Pipe | 01/04/08 |
02/06/08 |
|
Bearing Assemblies | 09/01/05 |
09/01/07 |
|
Concrete Repair by Epoxy Injection | 09/01/05 |
09/01/07 |
|
Concrete for Patching Bridge Structures | 09/27/07 |
10/01/07 |
|
QC/QA Superstructure Concrete | 01/01/06 |
09/01/07 |
|
Mechanically Stabilized Earth Retaining Walls | 01/15/09 |
04/01/09 |
|
Modular Concrete Block Retaining Walls | 02/19/09 |
04/01/09 |
|
Metal Bin-Type Retaining Wall | 02/16/06 |
09/01/07 |
|
Silica Fume Modified Structural Concrete Bridge Deck Overlay | 04/06/06 |
09/01/07 |
|
Wingwalls and Headwalls for Precast Concrete Box Culverts | 04/24/06 |
09/01/07 |