Language Translation
  Close Menu
Section 200 RSP

Indiana Department of Transportation

INDOT > Doing Business with INDOT Recurring Special Provisions & Plan Details

Effective for Lettings on or after September 1, 2007


*Revision Date = Date the Recurring Special Provision was Added or Revised
**Letting Date = Effective for use on lettings on or after this date - Be sure to select the RSP or RPD for the correct letting date you need

Section 200 - Earthwork


RSP or RPD
Description
Rev. Date*
Letting Date**
Recycled Foundry Sand
01/12/07
09/01/07
Clearing Right-of-Way (editable MS Word)
09/01/05
09/01/07
Debris Removal at Bridge Structures
09/01/05
09/01/07
Open Burning of Natural Growth Permitted
09/01/05
09/01/07
Air-Curtained Open-Pit Incineration of Natural Growth Required
09/01/05
09/01/07
Inspection and Testing for Asbestos Material
09/01/05
09/01/07
Election to Produce Recycled Concrete Aggregate
11/01/07
01/01/08
Mandatory to Production of Recycled Concrete Aggregate
11/01/07
01/01/08
Removal of Existing Traffic Signal Equipment (editable MS Word)
11/30/06
09/01/07
Marion County Borrow Areas
09/01/05
09/01/07
Borrow Area Wetland Enhancement
09/01/05
09/01/07
Embankments Constructed of Coal Combustion By-Products
09/01/05
09/01/07
Approval of Borrow and Disposal Sites
03/20/08
07/01/08
Steel Sheet Piling at Railroad Grade Separation
09/01/05
09/01/07
General Bridge Requirements
09/01/05
09/01/07
Gore Area Treatment
09/01/05
09/01/07
Crushed Glass as Bedding Material
09/01/05
09/01/07
B Borrow and Structure Backfill
01/15/09
04/01/09
Flowable Backfill
08/20/08
12/01/08
Dynamic Cone Penetrometer Test for Compaction of Chemically Modified Soils
05/31/07
09/01/07
[an error occurred while processing this directive]

INDOT Events

More News & Events

Top FAQs