Note: This message is displayed if (1) your browser is not standards-compliant or (2) you have you disabled CSS. Read our Policies for more information.
Link to Construction Memorandums
All files are in Adobe Acrobat "PDF" format and open in a new window
| Memo Number | Issue Date | Subject | Design
Manual Revised |
Design Manual Ch.-Sec. |
Deleted from website |
Super-seding Memo |
Policy | Advisory | Attachments |
| 06-13 | 9/27/06 | Design Memoranda in Website Listing | varies | STILL ON | Advisory | ||||
| 06-12 | 9/20/06 |
Transformed Beam Section |
63-4.01 | STILL ON | Advisory | ||||
| 06-11 | 9/15/06 |
Policy for Geotechnical Investigation or Geotechnical Waiver |
18-1.0 | STILL ON | Advisory | Geotechnical Policy | |||
| 06-10 | 9/14/06 |
Blue-Retroreflectors Raised Pavement Markers |
76-3.02(05) | STILL ON | Policy | Advisory | |||
| 06-09 | 9/14/06 |
Linear Grading |
17-2.06 | STILL ON | Advisory | RSP 203-R-260 | |||
| 06-08 | 9/01/06 |
Contract-Preparation Documents to Contract Administration Division |
14-1.02(03) | 1/02/07 | Advisory | ||||
| 06-07 | 8/29/06 | High-Performance Structural Steel | 64-2.01(01) | STILL ON | Advisory |
RSP
711-B-165
|
|||
| 06-06 | 8/18/06 | Interior Diaphragms with Prestressed-Concrete Members | 63-7.02 | STILL ON | Advisory |
RSP
707-B-171-172-173 RPD Eng. 707-B-173d RPD Met. 707-B-173d |
|||
| 06-05 | 8/03/06 | Level One Design Exception Approval Procedure | 40-8.04 | STILL ON | Policy | ||||
|
06-04 |
8/03/06 | Temporary Revetment Riprap Check Dam | 37-3.03(01) | STILL ON | |||||
| 06-03 | 6/01/06 | Development of Bridge Plans |
14-2.03 14-2.04 | STILL ON | Advisory | ||||
| 06-02 | 4/25/06 | Pay Unit for Water Pay Items |
17-3.10(07) | STILL ON | Advisory | ||||
| 06-01 | 4/25/06 | Final Quantities Values | 17-1.03 | STILL ON | Advisory | ||||
| Memo Number | Issue Date | Subject | Design
Manual Revised |
Design Manual Ch.-Sec. |
Deleted from website |
Super-seding Memo |
Policy | Advisory | Attachments |
| 05-38 | 12/21/05 | Errata Corrections to the Indiana Design Manual | July 2006 | varies | 9/27/06 | Advisory | |||
| 05-37 | 11/28/05 | Shoulder Cross Slope and Pavement Section | varies | STILL ON | Advisory | ||||
| 05-36 | 11/22/05 | English-Units Indiana Design Manual and Additions and Corrections to Manual | July 2006 | varies | 9/27/06 | Advisory | |||
| 05-35 | 11/14/05 | Snowplowable Raised Pavement Marker Castings | 76-3.02(05) | STILL ON | Advisory | RSP 808-T-151 | |||
| 05-34 | 11/9/05 | Concrete Railings and Moment Slabs at Mechanically Stabilized Earth (MSE) Wall Systems | 49-4.01(05) | STILL ON | Advisory | 706-R-504 RSP & RPD | |||
| 05-33 | 9/23/05 | New and Revised Editable Design Manual Documents | varies | STILL ON | Advisory | ||||
| 05-32 | 9/23/05 | New Estimator Software Pay Item List | 20-2.03 | STILL ON | Advisory | ||||
| 05-31 | 9/9/05 | Public Road Approaches and Drives | 46-11.0 | STILL ON | Advisory | RSP 610-R-502 | |||
| 05-30 | 9/1/05 | Bridge Deck Overhang Width | 61-5.02 | STILL ON | Advisory | ||||
| 05-29 | 9/1/05 | Curbed Section in Suburban or Intermediate Urban Area | July 2006 | Ch.53,55 | 9/27/06 | Policy | Advisory | ||
| 05-28 | 8/26/05 | Geometric Design Criteria for Recreational Roads | July 2006 | Fig. 51-6B | 9/27/06 | Advisory | IDM Fig. 51-6B | ||
| 05-27 | 7/28/05 | Inputting Data for Cost Estimate | 20-2.01 | STILL ON | Advisory | Inupt Form | |||
| 05-26 | 7/28/05 | Bridge Identification in Pay Item Names | 20-2.02(03) | STILL ON | Advisory | ||||
| 05-25 | 7/28/05 | Earthwork Quantities for Retaining Walls | July 2006 | 17-4.05(02) | 9/27/06 | Advisory | IDM Sec. 17-4.05(02) | ||
| 05-24 | 7/08/05 | Design Memoranda in Website Listings | July 2006 | varies | 9/27/06 | Advisory | |||
| 05-23 | 7/08/05 | 2006 INDOT Standard Specifications Book | July 2006 | n/a | 9/27/06 | Advisory | |||
| 05-22 | 7/08/05 | Seed Mixture CV | 17-3.10 | STILL ON | Advisory | ||||
| 05-21 | 6/27/05 | New or Revised Access to the Interstate System | 48-1.03 | STILL ON | Advisory | ||||
| 05-20 | 6/27/05 | Shoulder Width of Multi-Lane Urban Arterial | Table 53-6 | STILL ON | Advisory | ||||
| 05-19 | 6/27/05 | HMA Ramp Cross Section | July 2006 | Fig. 52-13S, Fig. 52-13T | 9/27/06 | Advisory | IDM Figures 52-12S & 52-12T | ||
| 05-18 | 6/27/05 | Mitigation Commitments | Unknown | STILL ON | Advisory | ||||
| 05-17 | 6/13/05 | Impact Attenuator Spare Parts Package | 49-6.01 | STILL ON | Advisory | RSP 601-R-497 | |||
| 05-16 | 6/02/05 | Guardrail End Treatment Spare Parts Package | 49-5.04(01) | STILL ON | Advisory | RSP 601-R-237 | |||
| 05-15 | 5/26/05 | Temporary Traffic Barrier (TTB) | July 2006 | 82-4.02(03) | 9/27/06 | Advisory | |||
| 05-14 | 5/26/05 | Use of Indiana Design Manual Part VI, Structural Design | varies | STILL ON | Policy | ||||
| 05-13 | 5/26/05 | Development of Bridge Plans | July 2006 | 14-2.03,-2.04 | 9/27/06 | Advisory | |||
| 05-12 | 5/26/05 | Relationship Between Guardrail End Treatment and Guardrail Length of Need | July 2006 | 49-5.04(04) | 9/27/06 | Advisory | |||
| 05-11 | 5/26/05 | New Geotechnical Instrumentation | July 2006 | 18-1.02 | 9/27/06 | Advisory | |||
| 05-10 | 5/26/05 | Level One Checklist for S-Lines | July 2006 | 14-2.0 | 9/27/06 | Advisory | |||
| 05-09 | 5/26/05 | Use of Integrated Traffic System (ITS) Controllers | July 2006 | 77-4.01(06) | 9/27/06 | Advisory | |||
| 05-08 |
4/14/05 |
ESALs or HMA mixtures,figure 52-9B |
May 2005 |
52-9B |
7/08/05 |
. |
. |
||
| 05-07 |
3/28/05 |
Maximum allowable stress in H-piles |
|
66-3.02(02) |
STILL ON |
. |
. |
. |
|
| 05-06 |
3/15/05 |
Prime coat,
IDM section 52-9.02(11) |
May 2005 |
52-9.02(11) |
7/08/05 |
. |
. |
. |
|
| 05-05 |
2/28/05 |
NCHRP bridge railings and transitions |
May 2005 |
61-6.01 |
7/08/05 |
. |
. |
||
| 05-04 |
2/8/05 |
Vertical alignment for 3R project |
May 2005 |
55-4.04 |
7/08/05 |
. |
. |
||
| 05-03 |
2/1/05 |
Status of design memorandum |
|
|
7/08/05 |
05-24 |
. |
. |
|
| 05-02 |
1/19/05 |
Truck-height barrier |
May 2005 |
49-5.02(01) |
7/08/05 |
. |
. |
||
| 05-01 |
1/10/05 |
Rating consultant plan submittals |
May 2005 |
6-3.03(02) |
7/08/05 |
. |
. |
||
| Memo Number | Issue Date | Subject | Design
Manual Revised |
Design Manual Ch.-Sec. |
Deleted from website |
Super-seding Memo |
Policy | Advisory | Attachments |
| 04-20 |
12/21/04 |
Barrier flare rates |
May 2005 |
49-9.0 |
7/08/05 |
. |
. |
||
| 04-19 |
12/20/04 |
Sidewalk curb ramps and sidewalk transitions |
May 2005 |
51-1.08 |
7/08/05 |
. |
. |
||
| 04-18 |
11/22/04 |
FHWA project oversight |
May 2005 |
40-7.0 |
7/08/05 |
. |
. |
. |
|
| 04-17 |
11/15/04 |
Retrofit thrie-beam bridge railing |
|
61-6.01(02) |
STILL ON |
. |
Advisory | . |
|
| 04-16 |
11/15/04 |
Thrie-beam guardrail and transitions |
May 2005 |
49-4.03 |
7/08/05 |
. | . |
. |
|
| 04-15 |
11/15/04 |
Crest vertical curves to remain in place |
11/15/04 |
55-4.04(03) |
7/08/05 |
. | . |
. |
|
| 04-14 |
10/12/04 |
Notif. proced. for temp. land acquisition suspension |
May 2005 |
85-3.03(01) |
7/08/05 |
. | . |
||
| 04-13 |
10/12/04 |
Intersecting welds in structural steel members |
May 2005 |
64-8.02 |
7/08/05 |
. | . |
. |
|
| 04-12 |
10/12/04 |
Fracture-critical structural steel members |
May 2005 |
64-1.07 |
7/08/05 |
. | . |
. |
|
| 04-11 |
10/12/04 |
Empirical design of concrete bridge decks |
May 2005 |
61-3.0 |
7/08/05 |
. | . |
. |
|
| 04-10 |
10/12/04 |
Wingwalls and headwalls for precast concrete box culvert |
May 2005 |
31-3.06 |
7/08/05 |
. | . |
||
| 04-09 |
10/12/04 |
Bridge loading rating policy |
May 2005 |
14-2.03(07) |
7/08/05 |
. |
. |
. |
|
| 04-08 |
10/12/04 |
Underground storage tank removal |
May 2005 |
14-2.01(07) |
7/08/05 |
. |
. |
||
| 04-07 |
10/12/04 |
Paving work at structure installation |
May 2005 |
17-3.03 |
7/08/05 |
. |
|||
| 04-06 |
8/4/04 |
Subgrade treatment |
May 2005 |
17-3.02 |
7/08/05 |
. |
. |
. |
|
| 04-05 | 5/26/04 | HS 25 loading for new and replacement bridges |
60-3.02 | STILL ON | . | Policy | . | . | |
| 04-04 | 5/13/04 | Partial 3R design policy |
Sept. 2004 | Ch. 56 | 2/1/05 | . | . | Advisory | . |
| 04-03 | 5/13/04 | Pavement design policy |
Sept. 2004 | Ch. 52 | 2/1/05 | . | Policy | Advisory | . |
| 04-02 | 5/12/04 | Temporary R/W for drive construction |
Sept. 2004 | 85-5.01(01) | 2/1/05 | . | Policy | . | . |
| 04-01 | 2/20/04 | Intersection sight distance at divided roadway |
Sept. 2004 | 49-6.01 | 2/1/05 | . | .. | Advisory | .. |
| Memo Number | Issue Date | Subject | Design
Manual Revised |
Design Manual Ch.-Sec. |
Deleted from website |
Super-seding Memo |
Policy | Advisory | Attachments |
| 03-19 | 12/8/03 | Drainage in curbed section |
Sept. 2004 | 45-1.05(04) | 2/1/05 | .. | Advisory | . | |
| 03-18 | 12/8/03 | Guardrail at culverts |
Sept. 2004 | 49-3.03(01) | 2/1/05 | Advisory | . | ||
| 03-17 | 10/15/03 | Reinforced concrete bridge approach |
Sept. 2004 | 17-4.09 | 2/1/05 | Advisory | . | ||
| 03-16 | 10/2/03 | Pavement milling |
5/13/04 | 04-03 | Policy | Advisory | . | ||
| 03-15 | 10/2/03 | Sidewalk curb ramps for partial 3R work |
Sept. 2004 | 56-4.0 | 2/1/05 | Advisory | . | ||
| 03-14 | 9/30/03 | IDEM Rule 5 submission for erosion control plan |
Sept. 2004 | 9-2.05(06) | 2/1/05 | Advisory | . | ||
| 03-13 | 9/10/03 | Guardrail end treatment type II pay limits |
Sept. 2004 | 49-5.04(01) | 2/1/05 | Advisory | . | ||
| 03-12 | 8/20/03 | Specifications conflicts |
Sept. 2004 | 19-2.02 | 2/1/05 | Advisory | . | ||
| 03-11 | 8/12/03 | Rest-area water treatment |
Sept. 2004 | 51-2.01(02) | 2/1/05 | Policy | Advisory | . | |
| 03-10 | 8/7/03 | Environmental permits |
Sept. 2004 | 9-2.02(09) | 2/1/05 | Advisory | . | ||
| 03-09 | 7/10/03 | HMA pavement ESAL ranges |
Sept. 2004 | 52-9.02(03) | 2/1/05 | Advisory | . | ||
| 03-08 | 7/2/03 | Interstate-highway lane closures |
Sept. 2004 | 82-6.01 | 2/1/05 | Policy | . | ||
| 03-07 | 7/2/03 | Context-sensitive design policy |
Unknown | STILL ON | Policy | . | |||
| 03-06 | 6/6/03 | HMA pavement ESAL ranges |
5/13/04 | 03-09 | Advisory | . | |||
| 03-05 | 5/8/03 | Partial 3R design policy |
5/13/04 | 04-04 | Policy | Advisory | . | ||
| 03-04 | 5/7/03 | Revised pay items |
June 2003 | 20-2.02(02) | 1/29/03 | Advisory | . | ||
| 03-03 | 4/15/03 | Compatibility of drainage structures and castings |
June 2003 | 36-2.14 | 1/29/03 | Advisory | . | ||
| 03-02 | 3/5/03 | Three-sided drainage structures |
NYA | STILL ON | Advisory | RSPs 723-R-282 723-R-282f | |||
| 03-01 | 2/17/03 | Sidewalk curb ramps |
12/20/04 | 04-19 | Advisory | . | |||
| Memo Number | Issue Date | Subject | Design
Manual Revised |
Design Manual Ch.-Sec. |
Deleted from website |
Super-seding Memo |
Policy | Advisory | Attachments |
| 02-11 | 12/5/02 | Sag vertical curve equations for undercrossing |
June 2003 | 44-3.02(04) | 1/29/03 | Advisory | |||
| 02-10 | 9/9/02 | Traffic maint. plan for roadway under overpass work |
June 2003 | 82-6.01 | 1/29/03 | Advisory | |||
| 02-09 | 8/14/02 | Status of design memoranda |
2/1/05 | 05-03 | Advisory | ||||
| 02-08 | 7/31/02 | Subgrade treatment | 8/4/04 | 04-06 | Advisory | ||||
| 02-07 | 7/19/02 | 2001 AASHTO “Green Book” affects on Design Manual |
June 2003 | varies | 1/29/03 | Policy | |||
| 02-06 | 7/9/02 | PCCP joints | June 2003 | 52-9.03 | 1/29/03 | Advisory | |||
| 02-05 | 6/13/02 | Pavement design policy |
5/13/04 | 04-03 | Advisory | ||||
| 02-04 | 6/7/02 | Subgrade treatment | 8/4/04 | 02-08 | Policy | Advisory | |||
| 02-03 | 6/7/02 | Shoulder corrugations | June 2003 | 45-1.02(06) | 1/29/03 | Policy | Advisory | ||
| 02-02 | 6/7/02 | HMA pavement design | 6/13/02 | 02-05 | Policy | Advisory | |||
| 02-01 | 1/7/02 | LED traffic signal indicator | June 2003 | 77-4.04 | 8/14/02 | Advisory | |||
| Memo Number | Issue Date | Subject | Design
Manual Revised |
Design Manual Ch.-Sec. |
Deleted from website |
Super-seding Memo |
Policy | Advisory | Attachments |
| 01-14 | 12/10/01 | Water main and sanitary sewer contract work |
Unknown | Unknown | STILL ON | Advisory | |||
| 01-13 | 11/15/01 | Use of english measurement units |
varies | STILL ON | Advisory | ||||
| 01-12 | 10/15/01 | Contract-specific standard-drawings index |
July 2002 | 19-1.04 | 8/14/02 | Advisory | |||
| 01-11 | 8/1/01 | Three-sided drainage structures |
3/5/03 | 03-02 | Advisory | ||||
| 01-10 | 8/1/01 | Subgrade treatment and soil chemical modification |
6/7/02 | 02-04 | Policy | Advisory | |||
| 01-09 | 6/13/01 | Construction-zone energy-absorbing terminal |
July 2002 | 82-4.02(03) | 8/14/02 | Advisory | |||
| 01-08 | 6/13/01 | Construction-zone GREAT unit |
6/13/01 | 01-09 | Advisory | ||||
| 01-07 | 6/5/01 | Status of design memoranda |
8/14/02 | 02-09 | Advisory | ||||
| 01-06 | 5/23/01 | Use of english measurement units |
varies | 11/15/01 | 01-13 | Advisory | |||
| 01-05 | 5/21/01 | Curing concrete bridge deck or RCBA |
62-1.01 | 9/1/02 | Advisory | ||||
| 01-04 | 5/21/01 | Bridge future wearing surface dead load |
May 2005 | 60-2.05 | 7/08/05 | Advisory | |||
| 01-03 | 5/21/01 | Use of english measurement units |
5/23/01 | 01-06 | Advisory | ||||
| 01-02 | 5/14/01 | Impact attenuators | June 2001 | 49-6.0 | 7/5/01 | Policy | Advisory | ||
| 01-01 | 2/7/01 | Concrete barrier railing | 1/18/05 | 05-02 | Advisory | ||||
| Memo Number | Issue Date | Subject | Design
Manual Revised |
Design Manual Ch.-Sec. |
Deleted from website |
Super-seding Memo |
Policy | Advisory | Attachments |
| 00-19 | 12/11/00 | Temporary erosion and sediment control |
Dec. 2000 | Ch. 37 | 7/5/01 | Policy | Advisory | ||
| 00-18 | 10/16/00 | Status of design memoranda |
7/5/01 | 01-07 | Advisory | ||||
| 00-17 | 10/6/00 | Three-sided drainage structures |
8/1/01 | 01-11 | Advisory | ||||
| 00-16 | 10/6/00 | Riprap ditch | June 2001 | 30-3.03(02) | 7/5/01 | Advisory | |||
| 00-15 | 10/6/00 | Design data on plans title sheet |
June 2001 | 14-3.04(06) | 7/5/01 | Advisory | |||
| 00-14 | 10/6/00 | ESALs determination | . | . | 6/13/02 | 02-05 | Policy | ||
| 00-13 | 9/22/00 | Nested guardrail and cable terminal anchor |
June 2001 | 49-5.03 | 7/5/01 | Advisory | |||
| 00-12 | 9/22/00 | Guardrail over large culvert |
June 2001 | 49-5.03 | 7/5/01 | Policy | Advisory | ||
| 00-11 | 9/22/00 | Three-sided drainage structures |
10/6/00 | 00-17 | Advisory | ||||
| 00-10 | 9/13/00 | NCHRP 350 bridge railings and transitions |
2/28/05 | 05-05 | Advisory | ||||
| 00-09 | 6/7/00 | PCCP typical sections | 6/13/02 | 02-05 | Policy | Advisory | |||
| 00-08 | 5/30/00 | Termination of new HMA pavement |
July 2002 | 56-4.01 | 8/14/02 | Advisory | |||
| 00-07 | 5/30/00 | Permanent easement for maintenance of legal ditch |
July 2000 | 85-5.03 | 10/16/00 | Advisory | |||
| 00-06 | 5/30/00 | Application of environmental documents |
July 2000 | 7-1.01 | 10/16/00 | Advisory | |||
| 00-05 | 5/30/00 | Environmental permit requirements |
Sep. 2004 | 9-2.0 | 8/14/02 | Advisory | |||
| 00-04 | 5/31/00 | Status of design memoranda |
10/16/00 | 00-18 | Advisory | ||||
| 00-03 | 3/1/00 | Impact attenuators | 5/14/01 | 01-02 | Policy | Advisory | |||
| 00-02 | 3/1/00 | Guardrail end treatments | July 2000 | 49-5.04(01) | 10/16/00 | Policy | Advisory | ||
| 00-01 | 3/1/00 | Positive guidance for const.-zone X-O traffic |
July 2000 | 82-4.02 | 10/16/00 | Policy | Advisory | ||
| Memo Number | Issue Date | Subject | Design
Manual Revised |
Design Manual Ch.-Sec. |
Deleted from website |
Super-seding Memo |
Policy | Advisory | Attachments |
| 99-19 | 12/21/99 | Contract-specific standard-drawings index |
10/15/01 | 01-12 | Advisory | ||||
| 99-18 | 12/15/99 | Underdrain table | 6/13/02 | 02-05 | Advisory | ||||
| 99-17 | 11/16/99 | Contract documents submittal |
July 2000 | 19-3.03 | 10/16/00 | Advisory | |||
| 99-16 | 11/15/99 | NCHRP 350 bridge railings and transitions |
9/13/00 | 00-10 | Policy | Advisory | |||
| 99-15 | 9/22/99 | Backfill behind bridge end bent |
July 2000 | 17-2.08 | 10/16/00 | Policy | |||
| 99-14 | 9/21/99 | NHS routes maps | July 2000 | 40-1.03(01) | 10/16/00 | Advisory | |||
| 99-13 | 8/30/99 | Underdrains | 6/13/02 | 02-05 | Policy | Advisory | |||
| 99-12 | 8/18/99 | HMA resurfacing | 5/08/03 | 03-05 | Advisory | ||||
| 99-11 | 5/26/99 | Subsurface investigation summary |
July 2000 | 18-1.05 | 10/16/00 | Advisory | |||
| 99-10 | 5/26/99 | Concrete deck slab permanent forms |
May 2005 | 61-4.03 | 7/08/05 | Advisory | |||
| 99-09 | 4/26/99 | Impact attenuators | 3/01/00 | 00-03 | Policy | Advisory | |||
| 99-08 | 4/15/99 | FHWA project oversight | 11/22/04 | 04-18 | Advisory | ||||
| 99-07 | 3/23/99 | Portland cement concrete pavement |
6/13/02 | 02-05 | Advisory | ||||
| 99-06 | 3/18/99 | GREAT unit | 3/01/00 | 00-03 | Advisory | ||||
| 99-05 | 3/17/99 | Reinforced concrete bridge approach | 10/15/03 | 03-17 | Advisory | ||||
| 99-04 | 3/17/99 | B / P profilograph | July 2000 | 17.3.01 | 5/31/00 | Advisory | |||
| 99-03 | 3/17/99 | Traffic control for construction operations | July 2000 | 83-4.0 | 5/31/00 | Advisory | |||
| 99-02 | 3/17/99 | NCHRP 350 guardrail, GRETs, bridge rlg. trans. | July 2000 | 49-4.03 | 10/16/00 | Advisory | |||
| 99-01 | 1/19/99 | Use of 1999 Standard Specifications | 5/31/00 | 05-23 | Advisory | ||||
| Memo Number | Issue Date | Subject | Design
Manual Revised |
Design Manual Ch.-Sec. |
Deleted from website |
Super-seding Memo |
Policy | Advisory | Attachments |
| 98-12 | 11/30/98 | B / P structural steel mbrs.;stud shear connectors | July 2000 | 17-4.01 | 5/31/00 | Advisory | |||
| 98-11 | 11/30/98 | B / P concrete structural members | July 2000 | 17-4.01(02) | 10/16/00 | Advisory | |||
| 98-10 | 11/23/98 | NCHRP 350 guardrail post requirements | 3/17/99 | 99-02 | Advisory | ||||
| 98-09 | 11/23/98 | IDEM Section 401 Water Quality Cert. | 5/30/00 | 00-05 | Policy | Advisory | |||
| 98-08 | 11/16/98 | Profile-wall PVC pipe | July 2000 | 28-6.05 | 10/16/00 | Advisory | |||
| 98-07 | 9/25/98 | Backfill behind bridge end bent | 9/22/99 | 99-15 | Advisory | ||||
| 98-06 | 8/1/98 | Three-sided drainage structure scour protection | 10/6/00 | 00-17 | Policy | Advisory | |||
| 98-05 | 7/15/98 | Utilities coordination process | July 2000 | Ch. 10 | 5/31/00 | Policy | Advisory | ||
| 98-04 | 6/22/98 | Pile loads table | May 2005 | 66-3.04 | 7/08/05 | Policy | |||
| 98-03 | 6/15/98 | GREAT unit | 3/1/00 | 00-03 | Advisory | ||||
| 98-02 | 6/15/98 | NCHRP 350 guardrail, GRETs, bridge rlg. trans. | 3/1/00 | 00-02 | Advisory | ||||
| 98-01 | 6/10/98 | New-pipes concept | July 2000 | 28-6.0 | 5/31/00 | Policy | Advisory | ||
| 6/3/98 | Proposing changes to Standard Documents or Proposing New Standard Documents | n/a | varies | STILL ON |