| 12-22 | 10/05/12 | Indiana Design Manual Rewrite | 10/05/12 | Ch. 205 | 01/01/13 | Advisory | |||
| 12-20 | 09/26/12 | AASHTO LRFD Bridge Design Specifications 2012, affects on Indiana Design Manual | 01/01/13 | see memo | 01/01/13 | Advisory | Part 4 Revisions | ||
| 12-19 | 08/24/12 | Final Tracings Checklist, FHWA PSE Checklist | 01/01/13 | 14-1.02 Fig 14-1E Fig 14-1E(1) Fig 14-1E(2) Fig 14-1E(3) |
01/01/13 | Advisory | Ch. 14-1.02 Fig 14-1E Fig 14-1E(1) Fig 14-1E(2) Fig 14-1E(3) |
||
| 12-18 | 07/18/12 | Indiana Design Manual Rewrite | 07/18/12 | Ch. 201, 202, 203 | 01/01/13 | Advisory | |||
| 12-17 | 07/06/12 | Plans-Sheets Size | 01/01/13 | 14-3.03 | 01/01/13 | Advisory | |||
| 12-16 | --- | Memo rescinded | 01/01/13 | ||||||
| 12-14 | 06/08/12 | Radio Communication Interconnection | 01/01/13 | 77-6.03 | 01/01/13 | Advisory | Fig 77-6A | ||
| 12-13 | 06/08/12 | Traffic-Signal Loop Tagging Table | 01/01/13 | 77-5.09(03) | 01/01/13 | Advisory | Fig 77-5DD | ||
| 12-12 | 06/06/12 | Reinforced-Concrete Bridge Approach | 01/01/13 | 17-5.09 | 01/01/13 | Advisory | RSP 609-B-199 RSP 706-R-600 Fig 17-5G Fig 17-5G(1) Fig 17-5G(2) |
||
| 12-11 | 06/06/12 | Fluorescent-Yellow Sign Sheeting | 01/01/13 | 75-4.07 | 01/01/13 | Advisory | 802-SNGS-05 | ||
| 12-06 | 04/26/12 | Plans-Sheet Size | 01/01/13 | 14-3.03 | 01/01/13 | Advisory | |||
| 12-05 | 03/14/12 | Bridge Condition Appraisal Report Submittal - Content and Order | 01/01/13 | 72-2.05 | 01/01/13 | Advisory | |||
| 12-04 | 03/01/12 | Design Exception Level One Request Routing and Approval | 01/01/13 | 40-8.04(01) | 01/01/13 | Advisory | Fig 40-8C | ||
| 12-03 | 02/21/12 | Stage 3 Plans-Review Submission | 01/01/13 | 14-2.01 | 01/01/13 | Advisory | |||
| 12-01 | 01/06/12 | Indiana Design Manual Rewrite | 01/06/12 | see memo | 01/01/13 | Advisory | |||
| Memo Number | Issue Date | Subject | Design Manual Revised |
Design Manual Ch.-Sec. | Deleted from website |
Super- seding Memo | Policy | Advisory | Attachments |
| 11-24 | 12/22/11 | Microsurfacing | 52-11.01 item 4 | 06/08/12 | 12-15 | Advisory | RSP 411-R-432 | ||
| 11-23 | 11/22/11 | Traffic-Signal Cantilever Structure | 01/01/13 | 77-4.03 77-4.04 |
01/01/13 | Advisory | RSP 805-T-169 RPD 805-T-177d RSP 922-T-168 |
||
| 11-22 | 10/25/11 | Structural Steel Cleaning and Painting | 01/01/13 | 17-5.11, 17-5.11(04), 17-5.11(95) | 01/01/13 | Advisory | 619-PRWS-01 | ||
| 11-21 | 10/19/11 | Signal Conduit | 01/01/13 | 77-5.05 | 03/27/13 | 13-06 | Advisory | ||
| 11-20 | 10/28/11 | Traffic-Signal Cantilever Structure | 77-4.03, 77-4.04 | 11/22/11 | 11-23 | Advisory | RSP 805-T-169 RSP 922-T-168 RPD 805-T-177d |
||
| 11-19 | 09/20/11 | Fish and Wildlife Review, and Environmental Consultation Form | 01/01/13 | 14-2.01 14-2.04 |
01/01/13 | Advisory | |||
| 11-18 | 09/15/11 | Pavement Markings | 01/01/13 | 76-3.02 Fig 76-3A |
01/01/13 | Advisory | Fig 76-3A | ||
| 11-17 | 09/07/11 | Non-Participating Pay Items | 01/01/13 | 20-2.02(04) | 01/01/13 | Advisory | |||
| 11-16 | 08/18/11 | Specialty Drainage Structures | 31-4.05 31-4.06 |
01/01/13 | Advisory | ||||
| 11-15 | 08/18/11 | Proprietary-Material Use | 01/01/13 | 17-1.05 | 01/01/13 | Advisory | |||
| 11-14 | 08/17/11 | Use of U.S. Survey Foot | 01/01/13 | 22-5.01 | 01/01/13 | Advisory | |||
| 11-13 | 08/17/11 | Structural Steel Cleaning & Painting | 17-5.11, 17-5.11(04), 17-5.11(05) | 10/25/11 | 11-22 | Advisory | E619-PRWS-01 | ||
| 11-12 | 07/08/11 | Metric-Units Plans | None | 01/01/13 | Advisory | ||||
| 11-11 | 07/08/11 | Right-Of-Way Certification | 01/01/13 | 14-2.01(12) | 01/01/13 | Advisory | |||
| 11-10 | 07/08/11 | Bridge-Approach Guardrail and End Treatments | 01/01/13 | 49-4.02(01) 49-4.02(04) 49-8.01(04) 49-9.02 |
01/01/13 | Advisory | |||
| 11-08 | 04/05/11 | InRoads Survey Format | 01/01/12 | Ch. 22, 23, & 26 | 01/01/13 | Advisory | |||
| 11-07 | 03/28/11 | High-Tension Cable-Barrier System (CBS) | 45-5.01(04) | 04/05/11 | 11-09 | Advisory | RSP 624-R-546 RPD 627-R-546d |
||
| 11-06 | 03/07/11 | Bridge-Scour-Analysis Q500 Discharge Determination | 32-6.07 | 01/01/13 | Advisory | ||||
| 11-05 | 03/04/11 | Revised Indiana Design Manual | 01/01/12 | See memo | 01/01/13 | Advisory | |||
| 11-04 | 01/24/11 | New Consultant Performance Evaluation Manual | None | 01/01/13 | Advisory | ||||
| 11-03 | 01/24/11 | New Consultant Performance Evaluation Manual | None | 01/01/13 | Advisory | ||||
| 11-02 | 01/07/11 | Non-Participating Pay Items | 01/01/13 | Withdrawn | |||||
| 11-01 | 01/07/11 | Use of AASHTO LRFD Bridge Design Specifications | 10/05/12 | 12-21 | Policy | ||||
| Memo Number | Issue Date | Subject | Design Manual Revised |
Design Manual Ch.-Sec. | Deleted from website |
Super- seding Memo | Policy | Advisory | Attachments |
| 10-30 | 12/06/10 | Inputting Data for Cost Estimate | 01/01/11 | 20-2.01 | 01/01/13 | Advisory |
|
||
| 10-29 | 11/22/10 | Pavement-Marking Materials | 01/01/11 | 76-3.0 | 01/01/13 | Advisory | |||
| 10-28 | 11/22/10 | Construction-Zone Reduced-Speed-Limit Sign | 01/01/11 | 83-2.03(01) item 7 | 02/25/11 | Advisory | 801-T-174d | ||
| 10-27 | 11/22/10 | Wireless Vehicle-Detection System & Decision-Making Criteria | 01/01/11 | 77-4.02(03) | 02/25/11 | Advisory | Fig 10-27A Fig 10-27B 805-T-173 805-T-173d |
||
| 10-26 | 11/16/10 | Structural-Member Fillet Treatments | 01/01/11 | Figs 61-4B, 61-4C | 02/25/11 | Advisory | Fig 61-4B Eng Fig61-4B Met Fig 61-4C Eng Fig 61-4C Met |
||
| 10-25 | 10/29/10 | Department-Personnel Project-Site Use of Cellular Telephones or Radios | 01/01/11 | 01/01/13 | Advisory | 628-C-164 | |||
| 10-24 | 10/14/10 | Final Tracings Checklist | 01/01/11 | 14-1.02(03) items 23 & 24, Figure 14-1E | 08/27/12 | 12-19 | Advisory | 14-1.02(03) Fig 14-1E |
|
| 10-23 | 10/05/10 | Pavement-Marking Materials | 01/01/11 | 76-3.0 | 11/22/10 | 10-29 | Advisory | ||
| 10-22 | 09/10/10 | Plans Title Sheet | 01/01/11 | 02/25/11 | Advisory | Fig 10-22A | |||
| 10-21 | 09/02/10 | Lane-Shift & Merging Tapers | 01/01/11 | Figs 46-4M, 76-2B, 45-4A | 02/25/11 | Advisory | Fig 46-4M Eng Fig 46-4M Met Fig 76-2B Eng Fig 76-2B Met |
||
| 10-20 | 08/24/10 | High-Mast Lighting Design | 01/01/11 | 78-7.0 | 02/25/11 | Advisory | 920-T-162 | ||
| 10-19 | 07/29/10 | Culvert Sumping | 01/01/11 | 31-3.04(07) | 01/01/13 | Advisory | RSP 723-R-568 RPD 723-R-569d |
||
| 10-18 | 07/09/10 | Bridge Construction-Loads Considerations | 01/01/11 | 60-3.10 | 02/25/11 | Policy | Fig 10-18Eng Fig 10-18Met |
||
| 10-17 | 05/26/10 | Adjacent Prestressed-Concrete Box Beams Transverse Connection | 01/01/11 | 63-8.01 | 02/25/11 | Advisory | 707-BPBB-01 707-B-183 |
||
| 10-16 | 04/28/10 | Joint Transportation Research Project (JTRP) SPR-2853 regarding IDEM Rule 5 Permitting, Water Quality, Notice of Intent, & Notice of Termination | 01/01/11 | See Memo | 02/25/11 | Advisory | Fig 14-1A | ||
| 10-15 | 04/22/10 | Subgrade-Treatment Types | 01/01/11 | 17-4.02(01) | 01/01/13 | Advisory | RSP 207-R-577 | ||
| 10-14 | 04/22/10 | Pavement or Overlay Performance Criteria Pavement Engineering Webpage |
01/01/11 | Fig 52-8B, 52-8C | 01/01/13 | Advisory | |||
| 10-13 | 04/13/10 | Select & Non-Select Historic Bridges | 01/01/11 | 72-7.01 | 02/25/11 | Advisory | |||
| 10-12 | 04/06/10 | ERMS File Title-Naming Conventions | 01/01/13 | 14-1.02(04) 14-1.02(06) |
01/01/13 | Advisory | |||
| 10-11 | 03/26/10 | Test Piles | 01/01/11 | 17-5.03 | 01/01/13 | Advisory | RSP 701-B-132 | ||
| 10-10 | 03/16/10 | Nonmotorized-Vehicle-Use Facility Pavement Sections | 01/01/11 | 51-7.06 | 01/01/13 | Advisory | RSP 207-R-575 RPD 402-R-571d RPD 402-R-572d RPD 502-R-573d |
||
| 10-09 | 03/04/10 | Project Commitment Report | 01/01/11 | 14-2.01 14-2.02 14-2.04 |
01/01/13 | Advisory | |||
| 10-08 | 02/25/10 | Temporary Seed Mixtures | 01/01/11 | 17-4.10(02) | 01/01/13 | Advisory | |||
| 10-07 | 01/29/10 | Mitigation-Sites Information on Right-of-Way Plans | 01/01/11 | see memo | 01/01/13 | Advisory | |||
| 10-06 | 01/14/10 | Joint Transportation Research Project (JTRP) SPR-2853 | 01/01/11 | see memo | 04/28/10 | 10-16 | Advisory | ||
| 10-05 | 01/11/10 | Plans-Sheets Sizes | 01/01/11 | 14-3.03 | 02/25/11 | Advisory | |||
| 10-04 | 01/05/10 | Mechanically-Stabilized-Earth Retaining-Wall Bridge Abutment | 01/01/11 | 59-2.02(01) item 3 | 02/25/11 | Advisory | |||
| 10-03 | 01/05/10 | Flanking-Inlet Locations | 01/01/11 | Fig 36-10E | 02/25/11 | Advisory | |||
| 10-02 | 01/05/10 | Bridge-Railing Types | 01/01/11 | Fig 61-6B | 02/25/11 | Advisory | |||
| 10-01 | 01/05/10 | Bridge-Railings Test Levels | 01/01/11 | English-Units Figs 49-6D(40) & 49-6D(45), 61-6.01 | 02/25/11 | Advisory | |||
| Memo Number | Issue Date | Subject | Design Manual Revised |
Design Manual Ch.-Sec. |
Deleted from website |
Super- seding Memo |
Policy | Advisory | Attachments |
| 09-32 | 12/23/09 | Environmental Consultation Form | 01/01/10 | Figs 7-3A & 7-3B | 02/25/11 | Advisory | |||
| 09-31 | 12/18/09 | Pay-Items List | 01/01/10 | Figure 20-2A | 02/25/11 | Advisory | |||
| 09-30 | 12/18/09 | Modern Roundabouts | 01/01/10 | 51-12.0 | 02/25/11 | Policy | |||
| 09-29 | 12/16/09 | Use of Flashing Beacons with Signs | 01/01/10 | 77-3.02, 77-3.04 | 02/25/11 | Advisory | RSP 805-T-169 RPD 805-T-169d |
||
| 09-28 | 12/14/09 | Project Commitment Database IMplementation, ERMS Project File Naming Conventions | 01/01/11 | 7-1.01(05) | 01/01/13 | Advisory | Fig 09-28A Fig 09-28B |
||
| 09-27 | 12/04/09 | Culvert Sumping | 01/01/10 | 31-3.04(07) | 07/28/10 | 10-19 | Advisory | ||
| 09-26 | 11/30/09 | Sign-Sheeting Material & Overhead-Sign Lighting | 01/01/10 | 75-2.02, 75-2.03 item 1 | 02/25/11 | Advisory | RSP 802-T-171 RPD 802-T-171d |
||
| 09-25 | 11/12/09 | Bridge Superstructure Surface-Seal Limits | 1/01/10 | 17-5.01, 61-4.01 | 02/25/11 | Advisory | Fig 09-25A | ||
| 09-24 | 11/10/09 | Positive Protection in Work Zone | 01/01/10 | 82-4.01 | 02/25/11 | Advisory | |||
| 09-23 | 11/10/09 | Shop-Drawings Submittal, & Stage 3 Right-of-Way Change | 01/01/10 | 14-1.02(07) Item 3, 14-2.01(12) Item 1 | 02/25/11 | Advisory | |||
| 09-22 | 11/04/09 | Bridge Load Rating | 01/01/10 | PDP 14-2.04(08) Item 13, 14-2.05(04); Non-PDP 14-2.03(07) Item 9, 14-2.04(04) | 02/25/11 | Advisory | |||
| 09-21 | 09/21/09 | Proprietary Materials | 01/01/10 | 17-1.05, Fig 17-1A | 02/25/11 | Advisory | |||
| 09-20 | 09/16/09 | Bridge-Railings Test Levels | 01/01/10 | English Figs 49-6D(40) & 49-6D(45), & 61-6.01 | 02/25/11 | Advisory | |||
| 09-19 | 09/15/09 | Final Tracings Checklist | 01/01/10 | PDP Figure 14-1E | 02/25/11 | Advisory | |||
| 09-18 | 09/02/09 | Sidewalk-Project Plans Development | 01/01/10 | 51-1.05 | 02/25/11 | Advisory | |||
| 09-17 | 08/21/09 | Project Commitment Database Procedure | 01/01/10 | 7-1.01(05) | 12/14/09 | 09-28 | Advisory | ||
| 09-16 | 07/24/09 | Geotechnical Foundation Review | 01/01/10 | 66-1.05(02) & Figure 66-1A | 02/25/11 | Advisory | |||
| 09-15 | 06/12/09 | Geotechnical Foundation Review | 01/01/10 | 66-1.05(02), Figure 66-1A | 02/25/11 | Advisory | |||
| 09-14 | 05/18/09 | Three or Four-Sided Drainage Structures | 31-4.05 | 08/18/11 | 11-16 | Advisory | |||
| 09-12 | 05/07/09 | Piling | 01/01/10 | 66-3.02(01), 67-1.03 | 02/25/11 | Advisory | Fig 09-12A Fig 09-12B RSP 701-B-182 |
||
| 09-11 | 04/29/09 | Moment Slab Near Top of Mechanically-Stabilized-Earth Retaining Wall | 01/01/10 | 17-4.01, 45-1.02 | 02/25/11 | Advisory | |||
| 09-10 | 04/21/09 | Nonmotorized–Vehicle–Use Facility | 01/01/10 | 51-7.0 | 02/25/11 | Policy | |||
| 09-09 | 03/27/09 | Proprietary Material or Product Use | 01/01/10 | 17-1.05, 19-3.01 | 02/25/11 | Advisory | |||
| 09-08 | 03/26/09 | Bridge-Painting Information | 01/01/10 | Figure 17-5K | 02/25/11 | Advisory | |||
| 09-07 | 03/17/09 | Chapter 19 | 01/01/10 | Chapter 19 | 02/25/11 | Advisory | |||
| 09-06 | 03/16/09 | Pavement Design in Accordance with the Mechanistic Empirical Design Pavement Design Guide (MEPDG) | 01/01/10 | Chapter 52 | 02/25/11 | Policy | |||
| 09-05 | 02/06/09 | Low Channel-Clearing Elevation | 01/01/10 | 59-1.04, item 5 | 02/25/11 | Advisory | |||
| 09-04 | 01/27/09 | Sign-Sheeting Material | 01/01/10 | 02/15/10 | 09-26 | Advisory | RSP 802-T-171 | ||
| 09-03 | 01/16/09 | Masonry Coating | 01/01/10 | 02/25/11 | Advisory | ||||
| 09-02 | 01/13/09 | Superelevation Runoff Length | 01/01/10 | 43-3.03(01), 49-3.03(02) | 02/25/11 | Advisory | |||
| 09-01 | 01/09/09 | Figure 29-8A | 01/01/10 | Figure 29-8A | 02/25/11 | Advisory | |||
| Memo Number | Issue Date | Subject | Design Manual Revised |
Design Manual Ch.-Sec. | Deleted from website |
Super- seding Memo | Policy | Advisory | Attachments |
| 08-22 | 12/29/08 | Figs 59-1E, 1F, 1G | 01/01/09 | Figs 59-1E, 1F, 1G | 02/15/10 | Advisory | |||
| 08-21 | 10/28/08 | Semi-Integral End Bents | 01/01/09 | 67-1.01 | 02/15/10 | Policy | RSP 702-B-178 Fig 67-1C1 Eng Fig 67-1C2 Eng Fig 67-1C3 Eng Fig 67-1C1 Met Fig 67-1C2 Met Fig 67-1C3 Met |
||
| 08-20 | 09/11/08 | Bridge Plans Title Sheet | 01/01/09 | 14-2.04, 14-2.05 | 02/15/10 | Advisory | Two-Sheet Format | ||
| 08-19 | 09/03/08 | Details for Structural-Member Fillets | 01/01/09 | Figs 61-4B, 61-4C | 02/15/10 | Advisory | |||
| 08-18 | 08/25/08 | Use of Recurring Special Provisions Menu | 01/01/09 | 19-3.0 | 02/15/10 | Advisory | |||
| 08-17 | 08/06/08 | Overhead Sign Trusses | 01/01/09 | 75-2.06 | 02/15/10 | Advisory | |||
| 08-16 | 08/06/08 | Project Commitment Database Procedure | 01/01/09 | 7-1.01(04) | 12/14/09 | 09-28 | Advisory | ||
| 08-15 | 07/25/08 | Minimum Pile Length & Integral End Bents | 01/01/09 | 66-3.03 & 67-1.0 | 02/15/10 | Advisory | Fig 67-1B Eng Fig 67-1B Met Fig 67-1C Eng Fig 67-1C Met |
||
| 08-14 | 06/26/08 | New or Revised Contract Document Submittal | 01/01/09 | PDP 14-2.01(14), non-PDP 14-2.01(03) | 02/15/10 | Advisory | Fig 08-14A | ||
| 08-13 | 06/16/08 | Painting Structural Steel | 01/01/09 | 17-5.11 | 02/15/10 | Advisory | RSP 619-B-177 | ||
| 08-12 | 05/29/08 | Stable Construction Entrances | 01/01/09 | 37-2.0 | 02/15/10 | Advisory | RSP 108-C-192 | ||
| 08-11 | 05/30/08 | Project Field Office | 01/01/09 | 14-1.02(03) | 02/15/10 | Advisory | RSP 628-R-552 | ||
| 08-10 | 05/19/08 | Construction, Maintenance, and Inspection Manual for Major or Complex Bridge | 01/01/11 | 70-1.0 | 01/01/13 | Advisory | |||
| 08-09 | 05/19/08 | AASHTO LRFD Table Correction | 01/01/10 | 02/25/11 | Advisory | ||||
| 08-08 | 05/16/08 | High-Tension Cable Barrier System | 01/01/09 | 17-3.14 & 49-4.06 | 02/15/10 | Advisory | RPD Eng. 627-R-546d RSP 627-R-546 |
||
| 08-07 | 05/16/08 | Property-Owner Contact for Condemned Parcels | 01/01/09 | 85-1.08 | 02/15/10 | Advisory | |||
| 08-06 | 04/18/08 | Temporary Pavement Markings | 01/01/09 | 83-4.0 | 02/15/10 | Advisory | 801-T-165 | ||
| 08-05 | 03/18/08 | Temporary Seeding | 01/01/09 | 17-3.10(04) | 02/15/10 | Advisory | |||
| 08-04 | 03/18/08 | Bridge Load Rating | 01/01/09 | PDP Chapter 14 Sections 14-2.04(08) Item 13, Section 14-2.05(04); Non-PDP Chapter 14 Sections 14-2.03(07) Item 9, Section 14-2.04(04) | 11/04/09 | 09-22 | Advisory | ||
| 08-03 | 03/18/08 | Federal Aviation Administration (FAA) Tall-Structure Permit | 01/01/09 | 9-3.02 | 02/15/10 | Advisory | |||
| 08-02 | 03/18/08 | Use of Indiana Design Manual, English-Units Version | 02/25/11 | ALL | 02/25/11 | Advisory | |||
| 08-01 | 03/18/08 | Use of AASHTO LRFD Bridge Design Specifications & Indiana Design Manual Part VI, Structural Design | 01/01/09 | Part VI | 02/15/10 | 11-01 | Policy | ||
| Memo Number | Issue Date | Subject | Design Manual Revised |
Design Manual Ch.-Sec. |
Deleted from website |
Super- seding Memo |
Policy | Advisory | Attachments |
| 07-14 | 12/21/07 | Plan Development Process | 01/01/08 | Chapter 14 | 02/15/10 | Advisory | |||
| 07-13 | 10/16/07 | Structure Backfill & Flowable Backfill | 01/01/08 | 17-2.09 | 02/15/10 | Advisory | 211-R-543 213-R-446 |
||
| 07-12 | 10/16/07 | Pipe-Material-Selection Computer Program | 01/01/11 | 01/01/13 | Advisory | ||||
| 07-11 | 8/28/07 | Contract-Preparation Documents to Contract Administration Division | 01/01/08 | 14-1.02(03) | 02/15/10 | Advisory | Utility Cert Utility Waiver Commitments |
||
| 07-09 | 4/24/07 | Rational-Method Formula for Determining Peak Rate of Runoff | 01/01/08 | 29-8.04 | 02/15/10 | Advisory | |||
| 07-08 | 4/12/07 | Impact Attenuator Type CR | 01/01/08 | 49-6.01 | 02/15/10 | Advisory | |||
| 07-07 | 4/12/07 | Bridge Bearing Pads | 01/01/08 | 67-4.03 | 02/15/10 | Advisory | |||
| 07-06 | 3/22/07 | Patching Concrete Structures | 01/01/08 | 72-3.04(03) | 02/15/10 | Advisory | RSP 710-B176 | ||
| 07-05 | 3/22/07 | Treatment of Historic Bridge on Low-Volume Local Road | 01/01/08 | 72-7.0 | 02/15/10 | Policy | |||
| 07-04 | 2/06/07 | Backfilling & Video Inspection for Drainage Structures | 01/01/08 | 17-2.9 | 02/15/10 | Advisory | RSP 211-R-534 714-R-535 715-R-536 717-R-537 904-R-538 RPD Eng. 715-R-536d RPD Met. 715-R-536d |
||
| 07-03 | 1/29/07 | ADA Responsibilities Associated with Sidewalk Improvements | 01/01/08 | 51-1.08 | 02/15/10 | Advisory | |||
| 07-02 | 1/23/07 | Roadside Location of Guardrail, Guardrail End Treatments, Impact Attenuators, Light Standards, & Breakaway Sign Supports | 01/01/08 | 49-3.06 | 02/15/10 | Advisory | |||
| 07-01 | 01/02/07 | Contract-Preparation Documents to Contract Administration Division | 01/01/08 | 14-1.02(03) | 02/15/10 | Advisory | |||
| Memo Number | Issue Date | Subject | Design Manual Revised |
Design Manual Ch.-Sec. |
Deleted from website |
Super- seding Memo | Policy | Advisory | Attachments |
| 06-18 | 12/27/06 | Part VI, Structural Design | Part VI | 03/18/08 | 08-01 | Policy | |||
| 06-17 | 12/08/06 | Traffic Signal Equipment to be Removed | See Memo | 02/15/10 | Advisory | ||||
| 06-16 | 12/08/06 | Structural-Members Unit Prices | Fig 59-5A | 02/15/10 | Advisory | ||||
| 06-15 | 12/08/06 | Prestressed-Concrete Box Beam Details | Figs 63-15A through 63-15R | 02/15/10 | Advisory | ||||
| 06-14 | 11/6/06 | Structural Expansion Joints | 61-4.06(03) | 02/15/10 | Advisory | RSP 724-B-046 | |||
| 06-13 | 9/27/06 | Design Memoranda in Website Listing | varies | 02/15/10 | Advisory | ||||
| 06-12 | 9/20/06 | Transformed Beam Section | 63-4.01 | 02/15/10 | Advisory | ||||
| 06-11 | 9/15/06 | Policy for Geotechnical Investigation or Geotechnical Waiver | 18-1.0 | 02/15/10 | Advisory | Geotechnical Policy | |||
| 06-10 | 9/14/06 | Blue-Retroreflectors Raised Pavement Markers | 76-3.02(05) | 02/15/10 | Policy | Advisory | |||
| 06-09 | 9/14/06 | Linear Grading | 17-2.06 | 02/15/10 | Advisory | RSP 203-R-260 | |||
| 06-08 | 9/01/06 | Contract-Preparation Documents to Contract Administration Division | 14-1.02(03) | 1/02/07 | 07-01 | Advisory | |||
| 06-07 | 8/29/06 | High-Performance Structural Steel | 64-2.01(01) | 02/15/10 | Advisory | RSP 711-B-165 | |||
| 06-06 | 8/18/06 | Interior Diaphragms with Prestressed-Concrete Members | 63-7.02 | 02/15/10 | Advisory | RSP 707-B-171-172-173 RPD Eng. 707-B-173d RPD Met. 707-B-173d |
|||
| 06-05 | 8/03/06 | Level One Design Exception Approval Procedure | 40-8.04 | 02/15/10 | Policy | ||||
| 06-04 | 8/03/06 | Temporary Revetment Riprap Check Dam | 37-3.03(01) | 02/15/10 | Advisory | 205-R-528 RSP & RPD | |||
| 06-03 | 6/01/06 | Development of Bridge Plans | 14-2.03 14-2.04 | 02/15/10 | Advisory | ||||
| 06-02 | 4/25/06 | Pay Unit for Water Pay Items | 17-3.10(07) | 02/15/10 | Advisory | ||||
| 06-01 | 4/25/06 | Final Quantities Values | 17-1.03 | 02/15/10 | Advisory | ||||
| Memo Number | Issue Date | Subject | Design Manual Revised |
Design Manual Ch.-Sec. | Deleted from website |
Super- seding Memo | Policy | Advisory | Attachments |
| 05-38 | 12/21/05 | Errata Corrections to the Indiana Design Manual | July 2006 | varies | 9/27/06 | Advisory | |||
| 05-37 | 11/28/05 | Shoulder Cross Slope & Pavement Section | varies | 02/15/10 | Advisory | Ch.52 Met.Figs Ch.53-54 Met.Figs Ch.55 Met. Figs |
|||
| 05-36 | 11/22/05 | English-Units Indiana Design Manual & Additions & Corrections to Manual | July 2006 | varies | 9/27/06 | Advisory | |||
| 05-35 | 11/14/05 | Snowplowable Raised Pavement Marker Castings | 76-3.02(05) | 02/15/10 | Advisory | RSP 808-T-151 | |||
| 05-34 | 11/9/05 | Concrete Railings & Moment Slabs at Mechanically Stabilized Earth (MSE) Wall Systems | 49-4.01(05) | 02/15/10 | Advisory | 706-R-504 RSP & RPD | |||
| 05-33 | 9/23/05 | New & Revised Editable Design Manual Documents | varies | 02/15/10 | Advisory | ||||
| 05-32 | 9/23/05 | New Estimator Software Pay Item List | 20-2.03 | 02/15/10 | Advisory | ||||
| 05-31 | 9/9/05 | Public Road Approaches & Drives | 46-11.0 | 02/15/10 | Advisory | RSP 610-R-502 | |||
| 05-30 | 9/1/05 | Bridge Deck Overhang Width | 61-5.02 | 02/15/10 | Advisory | ||||
| 05-29 | 9/1/05 | Curbed Section in Suburban or Intermediate Urban Area | July 2006 | Ch 53, 55 | 9/27/06 | Policy | Advisory | ||
| 05-28 | 8/26/05 | Geometric Design Criteria for Recreational Roads | July 2006 | Fig 51-6B | 9/27/06 | Advisory | Fig 51-6B | ||
| 05-27 | 7/28/05 | Inputting Data for Cost Estimate | 20-2.01 | 02/15/10 | 10-30 | Advisory | Input Form | ||
| 05-26 | 7/28/05 | Bridge Identification in Pay Item Names | 20-2.02(03) | 02/15/10 | Advisory | ||||
| 05-25 | 7/28/05 | Earthwork Quantities for Retaining Walls | July 2006 | 17-4.05(02) | 9/27/06 | Advisory | 17-4.05(02) | ||
| 05-24 | 7/08/05 | Design Memoranda in Website Listings | July 2006 | varies | 9/27/06 | Advisory | |||
| 05-23 | 7/08/05 | 2006 INDOT Standard Specifications Book | July 2006 | n/a | 9/27/06 | Advisory | |||
| 05-22 | 7/08/05 | Seed Mixture CV | 17-3.10 | 02/15/10 | Advisory | ||||
| 05-21 | 6/27/05 | New or Revised Access to the Interstate System | 48-1.03 | 02/15/10 | Advisory | ||||
| 05-20 | 6/27/05 | Shoulder Width of Multi-Lane Urban Arterial | Table 53-6 | 02/15/10 | Advisory | ||||
| 05-19 | 6/27/05 | HMA Ramp Cross Section | July 2006 | Fig 52-13S, Fig 52-13T | 9/27/06 | Advisory | Fig 52-12S & 52-12T |
||
| 05-18 | 6/27/05 | Mitigation Commitments | 7-1.01(04) | 08/06/08 | 08-16 | Advisory | |||
| 05-17 | 6/13/05 | Impact Attenuator Spare Parts Package | 49-6.01 | 02/15/10 | Advisory | RSP 601-R-497 | |||
| 05-16 | 6/02/05 | Guardrail End Treatment Spare Parts Package | 49-5.04(01) | 02/15/10 | Advisory | RSP 601-R-237 | |||
| 05-15 | 5/26/05 | Temporary Traffic Barrier (TTB) | July 2006 | 82-4.02(03) | 9/27/06 | Advisory | |||
| 05-14 | 5/26/05 | Use of Indiana Design Manual Part VI, Structural Design | varies | 02/15/10 | 06-18 | Policy | |||
| 05-13 | 5/26/05 | Development of Bridge Plans | July 2006 | 14-2.03, 14-2.04 | 9/27/06 | 06-03 | Advisory | ||
| 05-12 | 5/26/05 | Relationship Between Guardrail End Treatment & Guardrail Length of Need | July 2006 | 49-5.04(04) | 9/27/06 | Advisory | |||
| 05-11 | 5/26/05 | New Geotechnical Instrumentation | July 2006 | 18-1.02 | 9/27/06 | Advisory | |||
| 05-10 | 5/26/05 | Level One Checklist for S-Lines | July 2006 | 14-2.0 | 9/27/06 | Advisory | |||
| 05-09 | 5/26/05 | Use of Integrated Traffic System (ITS) Controllers | July 2006 | 77-4.01(06) | 9/27/06 | Advisory | |||
| 05-08 | 4/14/05 | ESALs or HMA mixtures, Fig 52-9B | May 2005 | 52-9B | 7/08/05 | Advisory | |||
| 05-07 | 3/28/05 | Maximum allowable stress in H-piles | 66-3.02(02) | 02/15/10 | Advisory | ||||
| 05-06 | 3/15/05 | Prime coat, 52-9.02(11) | May 2005 | 52-9.02(11) | 7/08/05 | Policy | |||
| 05-05 | 2/28/05 | NCHRP Bridge Railings & Transitions | May 2005 | 61-6.01 | 7/08/05 | Advisory | |||
| 05-04 | 2/8/05 | Vertical Alignment for 3R Project | May 2005 | 55-4.04 | 7/08/05 | Advisory | |||
| 05-03 | 2/1/05 | Status of Design Memorandum | 7/08/05 | 05-24 | Advisory | ||||
| 05-02 | 1/19/05 | Truck-Height Barrier | May 2005 | 49-5.02(01) | 7/08/05 | Advisory | |||
| 05-01 | 1/10/05 | Rating Consultant Plan Submittals | May 2005 | 6-3.03(02) | 7/08/05 | Advisory | |||
| Memo Number | Issue Date | Subject | Design Manual Revised |
Design Manual Ch.-Sec. | Deleted from website |
Super- seding Memo | Policy | Advisory | Attachments |
| 04-20 | 12/21/04 | Barrier Flare Rates | May 2005 | 49-9.0 | 7/08/05 | Advisory | |||
| 04-19 | 12/20/04 | Sidewalk Curb Ramps & Sidewalk Transitions | May 2005 | 51-1.08 | 7/08/05 | Advisory | |||
| 04-18 | 11/22/04 | FHWA Project Oversight | May 2005 | 40-7.0 | 7/08/05 | Advisory | |||
| 04-17 | 11/15/04 | Retrofit Thrie-beam Bridge Railing | 61-6.01(02) | 02/15/10 | 05-05 | Advisory | |||
| 04-16 | 11/15/04 | Thrie-beam Guardrail & Transitions | May 2005 | 49-4.03 | 7/08/05 | Advisory | |||
| 04-15 | 11/15/04 | Crest Vertical Curves to Remain in Place |
11/15/04 | 55-4.04(03) | 7/08/05 | 05-04 | Advisory | ||
| 04-14 | 10/12/04 | Notification Procedure for Temporary Land Acquisition Suspension | May 2005 | 85-3.03(01) | 7/08/05 | Advisory | |||
| 04-13 | 10/12/04 | Intersecting Welds in Structural Steel Members | May 2005 | 64-8.02 | 7/08/05 | Advisory | |||
| 04-12 | 10/12/04 | Fracture-critical Structural Steel Members | May 2005 | 64-1.07 | 7/08/05 | Advisory | |||
| 04-11 | 10/12/04 | Empirical design of concrete bridge decks | May 2005 | 61-3.0 | 7/08/05 | Advisory | |||
| 04-10 | 10/12/04 | Wingwalls & headwalls for precast concrete box culvert | May 2005 | 31-3.06 | 7/08/05 | Advisory | |||
| 04-09 | 10/12/04 | Bridge loading rating policy | May 2005 | 14-2.03(07) | 7/08/05 | Advisory | |||
| 04-08 | 10/12/04 | Underground storage tank removal | May 2005 | 14-2.01(07) | 7/08/05 | Advisory | |||
| 04-07 | 10/12/04 | Paving work at structure installation | May 2005 | 17-3.03 | 7/08/05 | Policy | Advisory | ||
| 04-06 | 8/4/04 | Subgrade treatment | May 2005 | 17-3.02 | 7/08/05 | Advisory | |||
| 04-05 | 5/26/04 | HS 25 loading for new & replacement bridges | 60-3.02 | 02/15/10 | Policy | ||||
| 04-04 | 5/13/04 | Partial 3R design policy | Sept 2004 | Ch 56 | 2/1/05 | Advisory | |||
| 04-03 | 5/13/04 | Pavement design policy | Sept 2004 | Ch 52 | 2/1/05 | Policy | Advisory | ||
| 04-02 | 5/12/04 | Temporary R/W for drive construction | Sept 2004 | 85-5.01(01) | 2/1/05 | Policy | |||
| 04-01 | 2/20/04 | Intersection sight distance at divided roadway | Sept 2004 | 49-6.01 | 2/1/05 | Advisory | |||
| Memo Number | Issue Date | Subject | Design Manual Revised |
Design Manual Ch.-Sec. | Deleted from website |
Super- seding Memo | Policy | Advisory | Attachments |
| 03-19 | 12/8/03 | Drainage in curbed section | Sept 2004 | 45-1.05(04) | 2/1/05 | Advisory | |||
| 03-18 | 12/8/03 | Guardrail at culverts | Sept 2004 | 49-3.03(01) | 2/1/05 | Advisory | |||
| 03-17 | 10/15/03 | Reinforced concrete bridge approach |
Sept 2004 | 17-4.09 | 2/1/05 | Advisory | |||
| 03-16 | 10/2/03 | Pavement milling | 5/13/04 | 04-03 | Policy | Advisory | |||
| 03-15 | 10/2/03 | Sidewalk curb ramps for partial 3R work | Sept 2004 | 56-4.0 | 2/1/05 | Advisory | |||
| 03-14 | 9/30/03 | IDEM Rule 5 submission for erosion control plan | Sept 2004 | 9-2.05(06) | 2/1/05 | Advisory | |||
| 03-13 | 9/10/03 | Guardrail end treatment type II pay limits | Sept 2004 | 49-5.04(01) | 2/1/05 | Advisory | |||
| 03-12 | 8/20/03 | Specifications conflicts | Sept 2004 | 19-2.02 | 2/1/05 | Advisory | |||
| 03-11 | 8/12/03 | Rest-area water treatment | Sept 2004 | 51-2.01(02) | 2/1/05 | Policy | Advisory | ||
| 03-10 | 8/7/03 | Environmental permits | Sept 2004 | 9-2.02(09) | 2/1/05 | Advisory | |||
| 03-09 | 7/10/03 | HMA pavement ESAL ranges | Sept 2004 | 52-9.02(03) | 2/1/05 | Advisory | |||
| 03-08 | 7/2/03 | Interstate-highway lane closures | Sept 2004 | 82-6.01 | 2/1/05 | Policy | |||
| 03-07 | 7/2/03 | Context-sensitive design policy | Unknown | STILL ON | Policy | ||||
| 03-06 | 6/6/03 | HMA pavement ESAL ranges | 5/13/04 | 03-09 | Advisory | ||||
| 03-05 | 5/8/03 | Partial 3R design policy | 5/13/04 | 04-04 | Policy | Advisory | |||
| 03-04 | 5/7/03 | Revised pay items | June 2003 | 20-2.02(02) | 1/29/03 | Advisory | |||
| 03-03 | 4/15/03 | Compatibility of drainage structures & castings | June 2003 | 36-2.14 | 1/29/03 | Advisory | |||
| 03-02 | 3/5/03 | Three-sided drainage structures | NYA | 02/15/10 | Advisory | RSPs 723-R-282 & 723-R-282f | |||
| 03-01 | 2/17/03 | Sidewalk curb ramps | 12/20/04 | 04-19 | Advisory | ||||
| Memo Number | Issue Date | Subject | Design Manual Revised |
Design Manual Ch.-Sec. |
Deleted from website |
Super- seding Memo |
Policy | Advisory | Attachments |
| 02-11 | 12/5/02 | Sag vertical curve equations for undercrossing | June 2003 | 44-3.02(04) | 1/29/03 | Advisory | |||
| 02-10 | 9/9/02 | Traffic maintenance plan for roadway under overpass work | June 2003 | 82-6.01 | 1/29/03 | Advisory | |||
| 02-09 | 8/14/02 | Status of design memoranda | 2/1/05 | 05-03 | Advisory | ||||
| 02-08 | 7/31/02 | Subgrade Treatment | 8/4/04 | 04-06 | Advisory | ||||
| 02-07 | 7/19/02 | 2001 AASHTO “Green Book” affects on Design Manual | June 2003 | varies | 1/29/03 | Policy | |||
| 02-06 | 7/9/02 | PCCP joints | June 2003 | 52-9.03 | 1/29/03 | Advisory | |||
| 02-05 | 6/13/02 | Pavement design policy | 5/13/04 | 04-03 | Advisory | ||||
| 02-04 | 6/7/02 | Subgrade treatment | 8/4/04 | 02-08 | Policy | Advisory | |||
| 02-03 | 6/7/02 | Shoulder corrugations | June 2003 | 45-1.02(06) | 1/29/03 | Policy | Advisory | ||
| 02-02 | 6/7/02 | HMA pavement design | 6/13/02 | 02-05 | Policy | Advisory | |||
| 02-01 | 1/7/02 | LED traffic signal indicator | June 2003 | 77-4.04 | 8/14/02 | Advisory | |||
| Memo Number | Issue Date | Subject | Design Manual Revised |
Design Manual Ch.-Sec. |
Deleted from website |
Super- seding Memo |
Policy | Advisory | Attachments |
| 01-14 | 12/10/01 | Water main & sanitary sewer contract work | Unknown | Unknown | STILL ON | Advisory | |||
| 01-13 | 11/15/01 | Use of english measurement units | varies | 02/25/11 | Advisory | ||||
| 01-12 | 10/15/01 | Contract-specific standard-drawings index | July 2002 | 19-1.04 | 8/14/02 | Advisory | |||
| 01-11 | 8/1/01 | Three-sided drainage structures | 3/5/03 | 03-02 | Advisory | ||||
| 01-10 | 8/1/01 | Subgrade treatment & soil chemical modification | 6/7/02 | 02-04 | Policy | Advisory | |||
| 01-09 | 6/13/01 | Construction-zone energy-absorbing terminal | July 2002 | 82-4.02(03) | 8/14/02 | Advisory | |||
| 01-08 | 6/13/01 | Construction-zone GREAT unit | 6/13/01 | 01-09 | Advisory | ||||
| 01-07 | 6/5/01 | Status of design memoranda | 8/14/02 | 02-09 | Advisory | ||||
| 01-06 | 5/23/01 | Use of english measurement units | varies | 11/15/01 | 01-13 | Advisory | |||
| 01-05 | 5/21/01 | Curing concrete bridge deck or RCBA | 62-1.01 | 9/1/02 | Advisory | ||||
| 01-04 | 5/21/01 | Bridge future wearing surface dead load | May 2005 | 60-2.05 | 7/08/05 | Advisory | |||
| 01-03 | 5/21/01 | Use of english measurement units | 5/23/01 | 01-06 | Advisory | ||||
| 01-02 | 5/14/01 | Impact attenuators | June 2001 | 49-6.0 | 7/5/01 | Policy | Advisory | ||
| 01-01 | 2/7/01 | Concrete barrier railing | 1/18/05 | 05-02 | Advisory | ||||
| Memo Number | Issue Date | Subject | Design Manual Revised |
Design Manual Ch.-Sec. | Deleted from website |
Super- seding Memo | Policy | Advisory | Attachments |
| 00-19 | 12/11/00 | Temporary erosion & sediment control | Dec. 2000 | Ch. 37 | 7/5/01 | Policy | Advisory | ||
| 00-18 | 10/16/00 | Status of design memoranda | 7/5/01 | 01-07 | Advisory | ||||
| 00-17 | 10/6/00 | Three-sided drainage structures | 8/1/01 | 01-11 | Advisory | ||||
| 00-16 | 10/6/00 | Riprap ditch | June 2001 | 30-3.03(02) | 7/5/01 | Advisory | |||
| 00-15 | 10/6/00 | Design data on plans title sheet | June 2001 | 14-3.04(06) | 7/5/01 | Advisory | |||
| 00-14 | 10/6/00 | ESALs determination | 6/13/02 | 02-05 | Policy | ||||
| 00-13 | 9/22/00 | Nested guardrail & cable terminal anchor | June 2001 | 49-5.03 | 7/5/01 | Advisory | |||
| 00-12 | 9/22/00 | Guardrail over large culvert | June 2001 | 49-5.03 | 7/5/01 | Policy | Advisory | ||
| 00-11 | 9/22/00 | Three-sided drainage structures | 10/6/00 | 00-17 | Advisory | ||||
| 00-10 | 9/13/00 | NCHRP 350 bridge railings & transitions | 2/28/05 | 05-05 | Advisory | ||||
| 00-09 | 6/7/00 | PCCP typical sections | 6/13/02 | 02-05 | Policy | Advisory | |||
| 00-08 | 5/30/00 | Termination of new HMA pavement | July 2002 | 56-4.01 | 8/14/02 | Advisory | |||
| 00-07 | 5/30/00 | Permanent easement for maintenance of legal ditch | July 2000 | 85-5.03 | 10/16/00 | Advisory | |||
| 00-06 | 5/30/00 | Application of environmental documents | July 2000 | 7-1.01 | 10/16/00 | Advisory | |||
| 00-05 | 5/30/00 | Environmental permit requirements | Sep. 2004 | 9-2.0 | 8/14/02 | Advisory | |||
| 00-04 | 5/31/00 | Status of design memoranda | 10/16/00 | 00-18 | Advisory | ||||
| 00-03 | 3/1/00 | Impact attenuators | 5/14/01 | 01-02 | Policy | Advisory | |||
| 00-02 | 3/1/00 | Guardrail end treatments | July 2000 | 49-5.04(01) | 10/16/00 | Policy | Advisory | ||
| 00-01 | 3/1/00 | Positive guidance for crossed-over two-lane two-way traffic on multi-lane highway construction-zone | July 2000 | 82-4.02 | 10/16/00 | Policy | Advisory | ||
| Memo Number | Issue Date | Subject | Design Manual Revised |
Design Manual Ch.-Sec. | Deleted from website |
Super- seding Memo | Policy | Advisory | Attachments |
| 99-19 | 12/21/99 | Contract-specific standard-drawings index | 10/15/01 | 01-12 | Advisory | ||||
| 99-18 | 12/15/99 | Underdrain table | 6/13/02 | 02-05 | Advisory | ||||
| 99-17 | 11/16/99 | Contract documents submittal | July 2000 | 19-3.03 | 10/16/00 | Advisory | |||
| 99-16 | 11/15/99 | NCHRP 350 bridge railings & transitions | 9/13/00 | 00-10 | Policy | Advisory | |||
| 99-15 | 9/22/99 | Backfill behind bridge end bent | July 2000 | 17-2.08 | 10/16/00 | Policy | |||
| 99-14 | 9/21/99 | NHS routes maps | July 2000 | 40-1.03(01) | 10/16/00 | Advisory | |||
| 99-13 | 8/30/99 | Underdrains | 6/13/02 | 02-05 | Policy | Advisory | |||
| 99-12 | 8/18/99 | HMA resurfacing | 5/08/03 | 03-05 | Advisory | ||||
| 99-11 | 5/26/99 | Subsurface investigation summary | July 2000 | 18-1.05 | 10/16/00 | Advisory | |||
| 99-10 | 5/26/99 | Concrete deck slab permanent forms | May 2005 | 61-4.03 | 7/08/05 | Advisory | |||
| 99-09 | 4/26/99 | Impact attenuators | 3/01/00 | 00-03 | Policy | Advisory | |||
| 99-08 | 4/15/99 | FHWA project oversight | 11/22/04 | 04-18 | Advisory | ||||
| 99-07 | 3/23/99 | Portland cement concrete pavement | 6/13/02 | 02-05 | Advisory | ||||
| 99-06 | 3/18/99 | GREAT unit | 3/01/00 | 00-03 | Advisory | ||||
| 99-05 | 3/17/99 | Reinforced concrete bridge approach | 10/15/03 | 03-17 | Advisory | ||||
| 99-04 | 3/17/99 | B/P profilograph | July 2000 | 17.3.01 | 5/31/00 | Advisory | |||
| 99-03 | 3/17/99 | Traffic control for construction operations | July 2000 | 83-4.0 | 5/31/00 | Advisory | |||
| 99-02 | 3/17/99 | NCHRP 350 guardrail, GRETs, bridge railing transitions | July 2000 | 49-4.03 | 10/16/00 | Advisory | |||
| 99-01 | 1/19/99 | Use of 1999 Standard Specifications | 5/31/00 | 05-23 | Advisory | ||||
| Memo Number | Issue Date | Subject | Design Manual Revised |
Design Manual Ch.-Sec. | Deleted from website |
Super- seding Memo | Policy | Advisory | Attachments |
| 98-12 | 11/30/98 | B/P structural steel members; stud shear connectors | July 2000 | 17-4.01 | 5/31/00 | Advisory | |||
| 98-11 | 11/30/98 | B/P concrete structural members | July 2000 | 17-4.01(02) | 10/16/00 | Advisory | |||
| 98-10 | 11/23/98 | NCHRP 350 guardrail post requirements | 3/17/99 | 99-02 | Advisory | ||||
| 98-09 | 11/23/98 | IDEM Section 401 Water Quality Certification | 5/30/00 | 00-03 | Policy | Advisory | |||
| 98-08 | 11/16/98 | Profile-wall PVC pipe | July 2000 | 28-6.05 | 10/16/00 | Advisory | |||
| 98-07 | 9/25/98 | Backfill behind bridge end bent | 9/22/99 | 99-15 | Advisory | ||||
| 98-06 | 8/1/98 | Three-sided drainage structure scour protection | 10/6/00 | 00-17 | Policy | Advisory | |||
| 98-05 | 7/15/98 | Utilities coordination process | July 2000 | Ch. 10 | 5/31/00 | Policy | Advisory | ||
| 98-04 | 6/22/98 | Pile loads table | May 2005 | 66-3.04 | 7/08/05 | Policy | |||
| 98-03 | 6/15/98 | GREAT unit | 3/1/00 | 00-03 | Advisory | ||||
| 98-02 | 6/15/98 | NCHRP 350 guardrail, GRETs, bridge railing transitions | 3/1/00 | 00-02 | Advisory | ||||
| 98-01 | 6/10/98 | New-pipes concept | July 2000 | 28-6.0 | 5/31/00 | Policy | Advisory | ||
| 6/3/98 | Proposing changes to Standard Documents or Proposing New Standard Documents | n/a | varies | 02/15/10 | |||||