Language Translation
  Close Menu
INDOT: English Section 800 - Effective March 1, 2005

INDOT >  Doing Business with INDOT >  Standards & Specifications >  Standard Drawings >  March 2005 >  English Section 800 English Section 800

Standard
Drawings
English
Metric
Sections
100 - 300
Sections
400, 500
Section
600
Section
700
Section
800

Effective for Lettings on or after March 1, 2005
 
Section 800 - Traffic Control Devices & Lighting

Last Updated: 6/3/11

Spec
Ref.
Code
Page
Title Description
Effective
Date
E801
TCCB
01
Traffic Control Median Barrier Barrier Dimensions
3/1/04
E801
TCCB
02
Traffic Control Median Barrier Barrier Reinforcement & Connection Details
3/1/05
E801
TCCB
03
Traffic Control Median Barrier Barrier Double Taper End Section
9/3/02
E801
TCCB
04
Traffic Control Median Barrier Barrier Anchorage
9/3/02
E801
TCCO
01
Traffic Control Crossovers Temporary Crossover Advance Signing
3/1/05
E801
TCCO
02
Traffic Control Crossovers Temporary Crossover Entrance Detail
3/1/05
E801
TCCO
03
Traffic Control Crossovers Temporary Crossover Exit Detail
3/1/05
E801
TCCO
04
(Now Unassigned)  
 
E801
TCCO
05
Traffic Control Crossovers Closure of Temporary Cross. Type B & Paving Layout
9/2/03
E801
TCCO
06
Traffic Control Crossovers Closure of Temporary Crossover
9/2/03
E801
TCCO
07
Traffic Control Crossovers Temporary Crossover Typical Sections
3/1/04
E801
TCDT
01
Traffic Control Detour Rural Detour
9/1/97
E801
TCDT
02
Traffic Control Detour Urban Detour
9/1/97
E801
TCDT
03
Traffic Control Detour Detour Route Marker Assemblies
3/3/03
E801
TCDV
01
Traffic Control Devices Channelizing Devices
3/1/05
E801
TCDV
02
Traffic Control Devices Channelizing Devices
9/3/02
E801
TCDV
02A
(Now Unassigned)  
 
E801
TCDV
03
Traffic Control Devices Merging or Shifting Taper
9/3/02
E801
TCDV
04
Traffic Control Devices Type III Barricade
9/3/02
E801
TCDV
05
Traffic Control Devices Typical Sign Standard
9/3/02
E801
TCDV
06
Traffic Control Devices Type III Barricade Typical Applications
3/1/05
E801
TCDV
07
Traffic Control Devices Type III Barricade Typical Applications
9/3/02
E801
TCDV
08
Traffic Control Devices U Channel Steel Post Splice Detail
9/3/02
E801
TCDV
09
Traffic Control Devices Buzz Strip Installation
3/3/03
E801
TCDV
10
Traffic Control Devices Worksite Speed Limit Sign Assembly
9/3/02
E801
TCDV
11
Traffic Control Devices Worksite Speed Limit Sign Assembly
9/1/99
E801
TCFO
01
Traffic Control Flagger Operations Flagger Operations
9/1/97
E801
TCFO
02
Traffic Control Flagger Operations Maintenance of Traffic for Moving Operation
5/1/00
E801
TCFO
03
Traffic Control Flagger Operations Maintenance of Traffic for Reflector Replacement
5/1/00
E801
TCFO
04
Traffic Control Flagger Operations Traffic Control for Overhead Sign Installation
9/1/97
E801
TCFO
05
Traffic Control Flagger Operations Traffic Control for Overhead Installation
9/1/97
E801
TCFO
06
Traffic Control Flagger Operations Traffic Control for Intersection Work
9/1/97
E801
TCLC
01
Traffic Control Lane Closure Lane Closures Interstate Applications
9/3/02
E801
TCLC
02
Traffic Control Lane Closure Continuous Lane Closures Right Lane Closed
5/1/97
E801
TCLC
03
Traffic Control Lane Closure Continuous Lane Closures Center Lane Closed
5/1/97
E801
TCLC
04
Traffic Control Lane Closure Continuous Lane Closures Left Lane Closed
1/3/00
E801
TCLC
05
Traffic Control Lane Closure Daylight Lane Closures Right Lane Closed
5/1/97
E801
TCLC
06
Traffic Control Lane Closure Daylight Lane Closures Left or Center Lane Closed
5/1/97
E801
TCLC
07
Traffic Control Lane Closure Traffic Control for Shoulder Work
9/3/02
E801
TCLC
08
Traffic Control Lane Closure Traffic Control for Lane Closure
7/3/95
E801
TCLC
09
Traffic Control Lane Closure Traffic Control for Lane Closure
9/3/02
E801
TCLC
10
Traffic Control Lane Closure Traffic Control for Shoulder Work
9/2/03
E801
TCLC
11
Traffic Control Lane Closure Traffic Control for Lane Closure
9/3/02
E801
TCLC
12
Traffic Control Lane Closure Traffic Control for Shoulder Work
9/3/02
E801
TCLC
13
Traffic Control Lane Closure Traffic Control for Overhead Sign Installation
7/3/95
E801
TCLC
14
Traffic Control Lane Closure Traffic Control for Overhead Sign Installation
7/3/95
E801
TCLC
15
Traffic Control Lane Closure Traffic Control for Overhead Sign Installation
5/1/98
E801
TCLC
16
Traffic Control Lane Closure Traffic Control for Lane Closure
9/3/02
E801
TCLC
17
Traffic Control Lane Closure Temporary U-Turn for Contractor's Vehicles
9/3/02
E801
TCLG
01
Traffic Control Legend Traffic Control Legend & General Notes
3/1/05
E801
TCSN
01
Traffic Control Signs Traffic Control Signs
7/3/95
E801
TCSN
02
Traffic Control Signs Traffic Control Signs
9/1/97
E801
TCSN
03
Traffic Control Signs Traffic Control Signs
7/3/95
E801
TCSN
04
Traffic Control Signs Traffic Control Signs
9/1/97
E801
TCSN
05
Traffic Control Signs Traffic Control Signs
9/1/97
E801
TCSN
06
Traffic Control Signs Traffic Control Signs
7/3/95
E801
TCSN
07
Traffic Control Signs Traffic Control Signs
7/3/95
E801
TCSN
08
Traffic Control Signs Traffic Control Signs
7/3/95
E801
TCSN
09
Traffic Control Signs Traffic Control Signs
1/2/96
E801
TCSN
10
Traffic Control Signs Traffic Control Signs
7/3/95
E801
TCSN
11
Traffic Control Signs Construction Signs General Notes
9/3/02
E801
TCSN
12
Traffic Control Signs Sign Design Details
9/1/99
E801
TCSN
13
Traffic Control Signs Sign Design Details
9/1/99
E801
TCSN
14
Traffic Control Signs Temporary Panel Sign Break-Away Post Installation
3/1/02
E801
TCSN
15
Traffic Control Signs Wood Post Design for Temporary Panel Signs
3/1/02
E801
TCTC
01
Traffic Control Temporary Closure Temporary Closures
9/3/02
E801
TCTC
02
Traffic Control Temporary Closure Temporary Closures
9/3/02
E801
TCTC
03
Traffic Control Temporary Closure Temporary Closures
9/3/02
E801
TCTC
04
Traffic Control Temporary Closure Temporary Closures
9/3/02
E801
TCTC
05
Traffic Control Temporary Closure Traffic Control for Daytime Lane Closure
9/3/02
E801
TCTC
06
Traffic Control Temporary Closure RPM Casting Installation Traffic Maintenance
9/3/02
E801
TCTC
07
Traffic Control Temporary Closure RPM Casting Replacement Traffic Maintenance
9/3/02
E801
TCTC
08
Traffic Control Temporary Closure RPM Casting Replacement Traffic Maintenance
9/3/02
E801
TCTC
09
Traffic Control Temporary Closure Maintenance of Traffic for RPM Reflector Replacement
5/1/00
E801
TCTC
10
Traffic Control Temporary Closure Maintenance of Traffic for  RPM Reflector Replacement
5/1/00
E801
TCTC
11
Traffic Control Temporary Closure Tubular Marker Delineation
9/3/02
E801
TCTC
12
Traffic Control Temporary Closure Tubular Marker Delineation at Intersection
9/3/02
E801
TCTS
01
Traffic Control Temporary Shoulder Temporary Shoulder for Traffic Maintenance
9/3/02
E802
SNBB
01
Sign Bridge Bracket Bridge Bracket Assembly for Crossroad Signing
9/4/01
E802
SNBB
02
Sign Bridge Bracket Bridge Bracket Assembly for Crossroad Signing
9/4/01
E802
SNBB
03
Sign Bridge Bracket Bridge Bracket Assembly for Crossroad Signing
9/4/01
E802
SNBB
04
Sign Bridge Bracket Bridge Bracket Assembly for Crossroad Signing
9/4/01
E802
SNBB
05
Sign Bridge Bracket Bridge Bracket Assembly for Crossroad Signing
9/4/01
E802
SNBF
01
Sign Box Foundation Shoulder Installation Type VC
3/3/03
E802
SNBF
02
Sign Box Foundation Median Installation Type VD
3/3/03
E802
SNBF
03
Sign Box Foundation Common Height Barrier Wall Type VA
3/3/03
E802
SNBF
04
Sign Box Foundation Truck Height Barrier Wall Type VB
3/3/03
E802
SNBF
05
Sign Box Foundation Common Height Barrier Wall Type V1B
3/3/03
E802
SNBF
06
Sign Box Foundation Truck Height Barrier Wall Type V1B
3/3/03
E802
SNBF
07
Sign Box Foundation Shoulder Installation Type V1C
3/3/03
E802
SNCF
01
Cantilever Sign Support Foundation Type I, II, III
3/3/03
E802
SNCS
01
Sign Cable Span Cable Span Sign Structure Details
9/4/01
E802
SNCS
02
Sign Cable Span Cable Span Sign Structure Details
3/3/03
E802
SNCS
03
Sign Cable Span Cable Span Sign Structure Details
9/4/01
E802
SNFT
01
Overhead Cantilever Sign Foundation Common Height Barrier Rail Type XIIIA
3/3/03
E802
SNFT
02
(Now Unassigned)  
 
E802
SNFT
03
Overhead Cantilever Sign Foundation Truck Height Barrier Rail Type XIIIB
3/3/03
E802
SNGP
01
Sign Placement Sign Placement
3/1/04
E802
SNGP
02
Sign Placement Wide Flange Sign Support Base
3/1/04
E802
SNGP
03
Sign Placement Sign Panel Details
3/1/02
E802
SNGP
04
Sign Placement Sign Details
9/1/04
E802
SNGP
05
Sign Placement Sign Data Tables
3/1/05
E802
SNGP
06
Sign Placement Sign Data Tables
3/1/04
E802
SNGP
07
Sign Placement Wide Flange Sign Post Foundation Data
3/1/04
E802
SNGP
08
(Now Unassigned)  
 
E802
SNGP
09
(Now Unassigned)  
 
E802
SNGP
10
(Now Unassigned)  
 
E802
SNGP
10A
Sign Placement Panel Sign Post Clip
9/1/04
E802
SNGP
11
Sign Placement Sign Placement
3/3/03
E802
SNGP
12
Sign Placement Sign Placement
3/3/03
E802
SNGP
13
Sign Placement Sign Placement
8/1/96
E802
SNGP
14
Sign Placement Sign Placement
8/1/96
E802
SNGS
01
Sign Details Route Marker Details
3/1/95
E802
SNGS
02
Sign Details Route Marker Details
3/1/95
E802
SNGS
03
Sign Details Route Marker Details
3/1/95
E802
SNGS
04
Sign Details Route Marker Details
1/3/00
E802
SNGS
05
Sign Details Sign Reflectorization Schedule
9/1/98
E802
SNGS
06
Sign Details Sign Reflectorization Schedule
9/1/98
E802
SNGS
07
Sign Details Miscellaneous Sign Details
3/1/95
E802
SNGS
08
Sign Details Miscellaneous Sign Details General Notes
5/3/99
E802
SNGS
09
Sign Details Steel Sign Posts
9/1/04
E802
SNGS
10
Sign Details Steel Sign Posts
9/1/04
E802
SNGS
11
Sign Details Sign Identification Marking
3/1/02
E802
SNGS
12
Sign Details Wide Flange Sign Post Selection Table
3/1/04
E802
SNIL
01
Sign Illumination Sign Illumination Details
9/4/01
E802
SNIL
02
Sign Illumination Sign Illumination Details
9/4/01
E802
SNIL
03
Sign Illumination Sign Illumination Details
9/4/01
E802
SNIL
04
Sign Illumination Cantilever Sign Structure
9/4/01
E802
SNIL
05
Sign Illumination Center Support Sign Structure
9/4/01
E802
SNIL
06
Sign Illumination Sign Bracket with Extension Lighting Support
9/4/01
E802
SNIL
07
Sign Illumination Conduit/Lighting
9/4/01
E802
SNOB
01
Overhead Sign Bridge Spans Overhead Sign Bridge Span Details
3/1/04
E802
SNOC
01
Overhead Cantilever Signs Overhead Cantilever Sign Types
3/1/04
E802
SNOC
02
Overhead Cantilever Signs Overhead Cantilever Sign Details
3/1/04
E802
SNOC
03
Overhead Cantilever Signs Single Arm Cantilever Table
3/1/04
E802
SNOC
04
Overhead Cantilever Signs Double Arm Cantilever Table
9/1/04
E802
SNOC
05
Overhead Cantilever Signs Overhead Sign Details
3/1/04
E802
SNOH
01
Sign Overhead Sign Structure Truss Alum. Details
9/1/04
E802
SNOH
02
Sign Overhead Sign Structure Truss Details
9/4/01
E802
SNOH
03
Sign Overhead Sign Structure Truss Details
3/1/02
E802
SNOH
04
Sign Overhead Sign Structure Truss Schedules
3/1/04
E802
SNOH
05
Sign Overhead Aluminum Structure Details
9/4/01
E802
SNOH
06
Sign Overhead Aluminum Structure Bolt Details
3/1/04
E802
SNOH
07
(Now Unassigned)  
 
E802
SNOH
08
Sign Overhead Aluminum Structure Pole Top Casting
3/3/03
E802
SNOH
09
Sign Overhead Aluminum Structure Condulet Details
9/4/01
E802
SNOH
10
Sign Overhead Aluminum Structure Flange Detail
9/4/01
E802
SNOH
11
Sign Overhead Aluminum Structure Splice Detail
9/4/01
E802
SNOH
12
Sign Overhead End Cap
9/4/01
E802
SNOH
13
(Now Unassigned)  
 
E802
SNOH
14
(Now Unassigned)  
 
E802
SNOH
15
Sign Overhead Sign Structure Truss - Aluminum Details
3/1/05
E802
SNOH
16
Sign Overhead Sign Structure Truss - Aluminum Schedule
9/1/04
E802
SNPL
01
Sign Location Sign Details Typical Location
1/3/00
E802
SNPL
02
Sign Location Horizontal & Vertical Sheet Sign Clearance
9/2/03
E802
SNWR
01
Sign Wiring Sign Wiring Details
9/4/01
E802
SNWR
02
Sign Wiring Sign Wiring Details
9/4/01
E802
SNWR
03
Sign Wiring Sign Wiring Details
9/4/01
E802
SNWR
04
Sign Wiring Sign Wiring Details
9/4/01
E802
SNWW
01
Sign Walkway Sign Truss Details
9/4/01
E802
SNWW
02
Sign Walkway Sign Truss Details
9/4/01
E802
SNWW
03
Sign Walkway Sign Truss Details
9/4/01
E802
SNWW
04
Sign Walkway Sign Walkway/Handrail Detail
9/4/01
E802
SNWW
05
Sign Walkway Sign Walkway Handrail Details
9/4/01
E802
SNWW
06
Sign Walkway Sign Details Lighting Fixture Mounts
9/4/01
E802
SNWW
07
Sign Walkway Sign Walkway Details
9/4/01
E802
SNWW
08
Sign Walkway Sign Walkway Details
9/4/01
E802
SNWW
09
Sign Walkway Sign Walkway Details
9/4/01
E802
SNWW
10
Sign Walkway Sign Walkway Details
9/4/01
E802
SNWW
11
Sign Walkway Sign Walkway Details
9/4/01
E803
SNBB
01
(Now Unassigned)  
 
E803
SNBB
02
(Now Unassigned)  
 
E803
SNBB
03
(Now Unassigned)  
 
E803
SNBB
04
(Now Unassigned)  
 
E803
SNBB
05
(Now Unassigned)  
 
E803
SNBF
01
(Now Unassigned)  
 
E803
SNBF
02
(Now Unassigned)  
 
E803
SNBF
03
(Now Unassigned)  
 
E803
SNCS
01
(Now Unassigned)  
 
E803
SNCS
02
(Now Unassigned)  
 
E803
SNCS
03
(Now Unassigned)  
 
E803
SNFT
01
(Now Unassigned)  
 
E803
SNFT
02
(Now Unassigned)  
 
E803
SNFT
03
(Now Unassigned)  
 
E803
SNIL
01
(Now Unassigned)  
 
E803
SNIL
02
(Now Unassigned)  
 
E803
SNIL
03
(Now Unassigned)  
 
E803
SNIL
04
(Now Unassigned)  
 
E803
SNIL
05
(Now Unassigned)  
 
E803
SNIL
06
(Now Unassigned)  
 
E803
SNIL
07
(Now Unassigned)  
 
E803
SNOH
01
(Now Unassigned)  
 
E803
SNOH
02
(Now Unassigned)  
 
E803
SNOH
03
(Now Unassigned)  
 
E803
SNOH
04
(Now Unassigned)  
 
E803
SNOH
05
(Now Unassigned)  
 
E803
SNOH
06
(Now Unassigned)  
 
E803
SNOH
07
(Now Unassigned)  
 
E803
SNOH
08
(Now Unassigned)  
 
E803
SNOH
09
(Now Unassigned)  
 
E803
SNOH
10
(Now Unassigned)  
 
E803
SNOH
11
(Now Unassigned)  
 
E803
SNOH
12
(Now Unassigned)  
 
E803
SNOH
13
(Now Unassigned)  
 
E803
SNOH
14
(Now Unassigned)  
 
E803
SNOH
15
(Now Unassigned)  
 
E803
SNOH
16
(Now Unassigned)  
 
E803
SNOH
17
(Now Unassigned)  
 
E803
SNOH
18
(Now Unassigned)  
 
E803
SNWR
01
(Now Unassigned)  
 
E803
SNWR
02
(Now Unassigned)  
 
E803
SNWR
03
(Now Unassigned)  
 
E803
SNWR
04
(Now Unassigned)  
 
E803
SNWW
01
(Now Unassigned)  
 
E803
SNWW
02
(Now Unassigned)  
 
E803
SNWW
03
(Now Unassigned)  
 
E803
SNWW
04
(Now Unassigned)  
 
E803
SNWW
05
(Now Unassigned)  
 
E803
SNWW
06
(Now Unassigned)  
 
E803
SNWW
07
(Now Unassigned)  
 
E803
SNWW
08
(Now Unassigned)  
 
E803
SNWW
09
(Now Unassigned)  
 
E803
SNWW
10
(Now Unassigned)  
 
E803
SNWW
11
(Now Unassigned)  
 
E805
SGCF
01
Signal Controller Foundation Controller Cabinet Foundation Type P-1
9/1/98
E805
SGCF
02
Signal Controller Foundation Controller Cabinet Foundation Type M
9/1/98
E805
SGCF
03
Signal Controller Foundation Signal Pedestal Foundation Type A
9/1/98
E805
SGCF
04
Signal Controller Foundation Signal Handhole
6/3/96
E805
SGCF
05
Signal Controller Foundation Existing M Foundation Modified to P-1 Foundation
9/1/98
E805
SGCO
01
Signal Controller Signal Service & Controller Mounted on Wood Pole
9/1/98
E805
SGCO
02
Signal Controller Signal Service & Controller Mounted on Steel Pole
9/1/98
E805
SGCO
03
Signal Controller Signal Service on Wood Pole
9/1/98
E805
SGCO
04
Signal Controller Signal Indication Mounted on Steel or Wood Poles
9/1/98
E805
SGCO
05
Signal Controller Pedestal Mounted Signal Indications
9/1/98
E805
SGCO
06
Signal Controller Controller Cabinet Type G on Pedestal
9/1/98
E805
SGDH
01
Signal Detector Housing Installation Detail Detector Housing
9/1/98
E805
SGDH
02
Signal Detector Housing Detail of Detector Housing
5/1/98
E805
SGDH
03
Signal Detector Housing Details of Detector Housing Adapter
3/1/95
E805
SGFB
01
Signal Flashing Beacon Flashing Beacon with Warning Sign
9/1/00
E805
SGFB
01A
Signal Flashing Beacon Flashing Beacon with Warning Sign Details
9/1/98
E805
SGFB
02
Signal Flashing Beacon Flashing Beacon with Warning Sign Details
5/1/98
E805
SGGR
01
Signal Ground Rod Ground Rod
9/1/98
E805
SGGR
02
Signal Ground Rod Threaded Grounding Bushing
9/1/98
E805
SGGR
03
Signal Ground Rod Grounding Details
3/1/95
E805
SGLI
01
Signal Loop Installation Traffic Signal Loop Installation
5/1/98
E805
SGLI
02
Signal Loop Installation Traffic Signal Loop Installation
3/1/95
E805
SGLI
03
Signal Loop Installation Traffic Signal Loop Detector Housing Installation
3/1/95
E805
SGLI
04
Signal Loop Installation Traffic Signal Loop Splice
3/1/95
E805
SGLI
05
Signal Loop Installation Traffic Signal Loop Installation
3/1/95
E805
SGLT
01
Signal Loop Tagging Loop Tagging System
3/1/95
E805
SGMA
01
Signal Mast Arm Signal Cantilever Single Arm
9/1/98
E805
SGMA
02
Signal Mast Arm Signal Cantilever Arm Truss Type Arm
5/1/98
E805
SGMA
03
Signal Mast Arm Signal Cantilever Foundation Detail
3/1/05
E805
SGMA
04
Signal Mast Arm Signal Cantilever Details
5/1/98
E805
SGMA
05
Signal Mast Arm Signal Cantilever Anchor Bolts, Plates, & Covers
9/1/98
E805
SGMA
06
(Now Unassigned)  
 
E805
SGMA
07
Signal Mast Arm Foundation Data & General Notes
3/1/05
E805
SGPB
01
Signal Pedestal Base Anchor Bolts & Pedestal Base
9/1/98
E805
SGSC
01
Signal Span & Catenary Pole Alignment
6/3/96
E805
SGSC
02
Signal Span & Catenary Steel Signal Strain Pole Foundation Details
9/1/04
E805
SGSC
03
Signal Span & Catenary Cable Span Attachment
9/1/98
E805
SGSC
04
Signal Span & Catenary Span, Catenary & Tether Detail
9/1/00
E805
SGSC
05
(Now Unassigned)  
 
E805
SGSP
01
Signal Strain Pole 30' & 36' Signal Steel Strain Poles
3/1/95
E805
SGSP
02
Signal Strain Pole Top Cover & Metal Skirt of Signal Steel Strain Pole
3/1/95
E805
SGSP
03
Signal Strain Pole Pole Band for Signal Steel Strain Pole
9/1/98
E805
SGSP
04
Signal Strain Pole Base Plate for Signal Steel Strain Pole
9/1/04
E805
SGSP
05
Signal Strain Pole Anchor Bolt Details
3/1/04
E807
BLIT
01
Bridge Lighting Bridge Lighting Details
9/1/97
E807
BLIT
02
Bridge Lighting Bridge Lighting Details
9/30/94
E807
BLIT
03
Bridge Lighting Bridge Lighting Details
9/1/97
E807
BLIT
04
Bridge Lighting Bridge Lighting Details
9/1/97
E807
LTFD
01
(Now Unassigned)  
 
E807
LTFD
02
Lighting Foundation Light Standard Foundation Grading–Fill Section
9/3/02
E807
LTFD
03
Lighting Foundation Light Standard Foundation Grading–Cut Section
9/3/02
E807
LTFD
03A
Lighting Foundation Light Standard Foundation Grading–Fill Section
9/3/02
E807
LTFD
04
Lighting Foundation Light Standard Foundation Grading–Cut Section
9/3/02
E807
LTFD
04A
Lighting Foundation Light Standard Foundation Grading
9/3/02
E807
LTFD
05
Lighting Foundation Light Foundation
9/3/02
E807
LTFD
06
Lighting Foundation Light Foundation
9/1/00
E807
LTFD
07
Lighting Foundation High Mast Tower Foundation
9/1/00
E807
LTFD
08
(Now Unassigned)  
 
E807
LTFD
09
Lighting Foundation Conventional Light Foundation–Median Wall
9/3/02
E807
LTFD
10
Lighting Foundation Conventional Light Foundation–Median Wall
9/3/02
E807
LTHH
01
Lighting Handhole Light Handhole Details
3/1/95
E807
LTHH
02
Lighting Handhole Light Handhole Connections
3/1/95
E807
LTHH
03
Lighting Handhole Light Handhole Drain & Cable Marker
3/1/95
E807
LTHI
01
Lighting Highway Illumination Highway Illumination Tower Bottom Latch
3/1/95
E807
LTHI
02
Lighting Highway Illumination Highway Illumination Tower Bottom Latch
3/1/95
E807
LTHI
03
Lighting Highway Illumination Highway Illumination Tower Details – Bottom Latch
1/4/99
E807
LTHI
03A
Lighting Highway Illumination Highway Illumination Tower Details – Bottom Latch
1/4/99
E807
LTHI
03B
Lighting Highway Illumination Highway Illumination Tower Details – Bottom Latch
1/4/99
E807
LTHI
04
Lighting Highway Illumination Highway Illumination Tower Bottom Latch
3/1/95
E807
LTHI
05
Lighting Highway Illumination Highway Illumination Tower Details Bottom Latch
3/1/95
E807
LTHI
06
Lighting Highway Illumination Temporary Highway Illumination Details
1/3/00
E807
LTHI
07
Lighting Highway Illumination Temporary Highway Illumination Details
1/3/00
E807
LTHM
01
Lighting High Mast High Mast Pole ID Plates
3/1/95
E807
LTHM
02
Lighting High Mast High Mast Perforated Aluminum Skirt
1/3/00
E807
LTHM
03
Lighting High Mast High Mast Tower Concrete Pad
3/1/95
E807
LTHM
04
Lighting High Mast High Mast Tower Concrete Pad
1/3/00
E807
LTLR
01
Lighting Lightning Rod Lightning Rod Typical Details
3/1/95
E807
LTLR
02
Lighting Lightning Rod Lightning Rod Typical Details
3/1/95
E807
LTLR
03
Lighting Lightning Rod Lightning Rod Typical Details
3/1/95
E807
LTLR
04
Lighting Lightning Rod Lightning Rod Typical Details
3/1/95
E807
LTPD
01
Lighting Pole Data Pole Data Schedule
3/3/03
E807
LTSP
01
Lighting Service Point Light Service Point Details
9/1/98
E807
LTSP
02
Lighting Service Point Light Service Point Details
1/3/00
E807
LTSP
03
Lighting Service Point Light Service Point Details
1/3/00
E807
LTSP
04
Lighting Service Point Light Service Point Details
1/3/00
E807
LTST
01
Light Standard Foundation Light Pole Dimensions
9/3/02
E807
LTST
02
Light Standard Foundation Aluminum Light Pole Details
9/3/02
E807
LTUP
01
Lighting Underpass Underpass Lighting Details
3/1/95
E807
LTUP
02
Lighting Underpass Underpass Lighting Details Pendant Mounting
1/3/00
E807
LTUP
03
Lighting Underpass Underpass Lighting Details Wall Mounting
3/1/95
E807
LTUP
04
Lighting Underpass Underpass Lighting Details Pendant Hanger Detail
1/3/00
E807
LTUP
05
Lighting Underpass Underpass Lighting Details Luminaire Wiring Detail
1/3/00
E807
LTUP
06
Lighting Underpass Underpass Lighting Details Circuit Breaker Wiring Detail
3/1/95
E807
LTUP
07
Lighting Underpass Underpass Lighting Details
3/1/95
E807
LTWR
01
Lighting Wiring Lighting Wiring Details
1/2/96
E807
LTWR
02
Lighting Wiring Lighting Wiring Details
1/2/96
E807
LTWR
03
Lighting Wiring Lighting Wiring Details
1/2/96
E807
LTWR
04
Lighting Wiring Lighting Wiring Details
1/2/96
E808
MKNB
01
Markings Narrow Bridge Narrow Bridge, Two Lane Road
1/3/00
E808
MKNB
02
Markings Narrow Bridge One Lane Bridge, Two Lane Road
1/3/00
E808
MKNB
03
Markings Narrow Bridge Placement of Traffic Control Devices
3/1/05
E808
MKNB
04
Markings Narrow Bridge Placement of Traffic Control Devices
1/3/00
E808
MKNB
05
Markings Narrow Bridge Traffic Control Devices Narrow Bridge Divided Highway
5/1/98
E808
MKPM
01
Markings Pavement Transverse Transverse Markings
3/1/95
E808
MKPM
02
Markings Pavement Transverse Transverse Markings
3/1/95
E808
MKPM
03
Markings Pavement Transverse Transverse Markings
1/3/00
E808
MKPM
04
Markings Pavement Transverse Transverse Markings
3/1/95
E808
MKPM
05
Markings Pavement Transverse Transverse Markings
1/3/00
E808
MKPM
06
Markings Pavement Transverse Pavement Marking Details
1/3/00
E808
MKPM
07
Markings Pavement Transverse Pavement Marking for Railroad Crossings
1/3/00
E808
MKRM
01
Markings Raised Markers Raised Pavement Markers Typical Locations
3/1/95
E808
MKRM
02
Markings Raised Markers Raised Pavement Markers Typical Locations
3/1/95
E808
MKRM
03
Markings Raised Markers Raised Pavement Markers Typical Locations
1/3/00
E808
MKRM
04
Markings Raised Markers Raised Pavement Markers Typical Locations
1/3/00
E808
MKRM
05
Markings Raised Markers Raised Pavement Markers Typical Locations
1/3/00
E808
MKRM
06
Markings Raised Markers Raised Pavement Markers Typical Locations
1/3/00
E808
MKRM
07
Markings Raised Markers Raised Pavement Markers Typical Locations
3/1/95
E808
MKRM
08
Markings Raised Markers Raised Pavement Markers Typical Locations
3/1/95
E808
MKRM
09
Markings Raised Markers Snowplowable Raised Pavement Markers
3/1/95
E808
MKRM
10
Markings Raised Markers Raised Pavement Marker Cast Metal Base Type I
9/1/98
E808
MKRM
11
Markings Raised Markers Raised Pavement Marker Cast Metal Base Type II
1/3/00

INDOT Events

More News & Events

Top FAQs