2022 Standard Drawings

Effective for Lettings on or after September 1, 2022
Last Updated: 07/26/2022
Download all Standard Drawings effective September 2022 (pdf 226 MB)Standard Drawing Index (MS-Excel, English) - Please use the Standard Drawing Index to search for key words, specific subject matter, or specific sheets.
Division numbers shown below match the division numbers of INDOT's Standard Specificatons.

E 105-RBCL

E 105-RBCL-01

Road and Bridge Contract Limits

Method for Determining Quantities within Structure Limits (edit. 09/01/19, format update only)

09/01/00
Revision Notes

Drawing Series & Numbers
Drawing Title
Eff. Date
E 205-TECD

E 205-TECD-01
E 205-TECD-02
E 205-TECD-03
E 205-TECD-04
E 205-TECD-05
E 205-TECD-06
E 205-TECD-07
E 205-TECD-08
E 205-TECD-09
E 205-TECD-10
E 205-TECD-11
E 205-TECD-12

Temporary Erosion Control

Temporary Erosion Control Index Sheet (rev. 09/01/19)
Temporary Inlet Protection, Filter Sock (rev. 09/01/19)
Temporary Inlet Protection, Gravel Ring (rev. 09/01/19)
Temporary Inlet Protection, Filter Bag Insert (new 09/01/19)
Temporary Curb Inlet Protection (new 09/01/19)
Temporary Check Dam, Revetment Riprap (new 09/01/19)
Temporary Check Dam, Traversable, Low Profile (new 09/01/19)
Temporary Check Dam, Traversable (new 09/01/19)
Temporary Sediment Trap (new 09/01/19)
Perimeter Protection, Filter Sock (new 09/01/19)
Perimeter Protection, Silt Fence (new 09/01/19)
Temporary Erosion Control Perimeter Construction Entrance (new 09/01/19)

09/01/19
Revision Notes
E 205-TECITemporary Erosion Control Inlet (del. 09/01/19)09/01/19
Revision Notes
E 205-TECPTemporary Erosion Control Perimeter (del. 09/01/19)09/01/19
Revision Notes
E 205-TECS

E 205-TECS-01
E 205-TECS-02
E 205-TECS-03
E 205-TECS-04

Temporary Erosion Control Slope

Temporary Interceptor Ditch (edit. 09/01/19, format update only)
Temporary Slope Drain (eff. 09/01/10)
Temporary Slope Drain (edit. 09/01/19, format update only)
Temporary Erosion Control Slope Diversion Interceptors (new 09/04/12)

09/04/12
Revision Notes
E 211-BFIL

E 211-BFIL-01
E 211-BFIL-02
E 211-BFIL-03
E 211-BFIL-04
E 211-BFIL-05

Backfill

Part Plan for Flared Wings (edit. 09/01/19, format update only)
Flared Wings Typical Cross Section (edit. 09/01/19, format update only)
Backfill Placement Interior Bent or Pier (rev. 09/04/12, format update only)
Backfill Placement Behind End Bent Beam or Girder Structure (rev. 09/04/12, format update only)
Backfill Placement Behind End Bent Reinforced-Concrete Slab Bridge (rev. 09/04/12, format update only)

09/04/12
Revision Notes

Drawing Series & Numbers
Drawing Title
Eff. Date
E 303-STRW

E 303-STRW-01

Shoulder Treatment Resurfacing Work

Shoulder Treatment for Resurfacing Work (edit. 09/01/19, format update only)

09/04/07
Revision Notes
E 306-TMPT

E 306-TMPT-01

Transition Milling Pavement

HMA-Pavement Wedging & Transition Milling (rev. 09/01/20)

09/01/20
Revision Notes

E 400-PRTN

E 400-PTRN-01

Pavement Type Transition

Existing PCCP to New HMA Pavement (eff. 09/01/99)

09/01/99
E 401-REBSRamp Entrance/Exit, HMA Shoulder (del. 09/01/19)09/01/19
Revision Notes