Indiana Department of Transportation
INDOT > Doing Business with INDOT > Standards and Specifications >Recurring Special Provisions & Plan Details > September 2013 Edition Recurring Special Provisions & Plan Details
Effective for Lettings on or after September 1, 2013
| RSP Home | Section 100 | Section
200 | Section 300 | Section 400 |
| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |
| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |
*Revision Date = Date the Recurring Special Provision was Added or Revised
**Letting Date = Effective for use on lettings on or after this date - Be sure to select the RSP or RPD for
the correct letting date you need
Section 200 - Earthwork
RSP or RPD |
Description |
Rev. Date* |
Letting Date** |
Recycled Foundry Sand | 05/23/13 |
09/01/13 |
|
Initial Payment for Clearing Right-of-Way (edit.) | 05/23/13 |
09/01/13 |
|
Debris Removal at Bridge Structures | 05/23/13 |
09/01/13 |
|
Open Burning of Natural Growth Permitted | 05/23/13 |
09/01/13 |
|
Air-Curtained Open-Pit Incineration of Natural Growth Required | 05/23/13 |
09/01/13 |
|
Inspection and Testing for Asbestos Material | 05/23/13 |
09/01/13 |
|
Election to Produce Recycled Concrete Aggregate | 05/23/13 |
09/01/13 |
|
Mandatory to Production of Recycled Concrete Aggregate | 05/23/13 |
09/01/13 |
|
Removal of Existing Traffic Signal Equipment (edit.) | 11/30/06 |
09/01/13 |
|
Marion County Borrow Areas | 09/01/05 |
09/01/13 |
|
Borrow Area Wetland Enhancement | 05/23/13 |
09/01/13 |
|
Embankments Constructed of Coal Combustion By-Products | 05/23/13 |
09/01/13 |
|
Approval of Borrow and Disposal Sites | 05/23/13 |
09/01/13 |
|
Dynamic Cone Penetrometer Testing for Embankment | 05/23/13 |
09/01/13 |
|
Temporary Turbidity Curtain | 02/21/13 |
09/01/13 |
|
Temporary Erosion Control Turbidity Curtain | 02/21/13 |
09/01/13 |
|
Quality Control Temporary Erosion and Sediment Control ! May only be used on contracts selected by M. Miller and J. Wright ! |
11/21/14 |
02/01/15 |
|
Steel Sheet Piling at Railroad Grade Separation | 05/23/13 |
09/01/13 |
|
Subgrade Treatment | 02/20/14 |
09/01/14 |
|
Gore Area Treatment | 05/23/13 |
09/01/13 |
|
Chemical Modification of Soils | 02/20/14 |
05/01/14 |
|
Soils Drying with Chemical Modifiers | 07/17/14 |
11/01/14 |