Effective for Lettings on or after September 1, 2013
| RSP Home | Section 100 | Section 200 | Section 300 | Section 400 |
| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |
| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |
*Revision Date = Date the Recurring Special Provision was Added or Revised
**Letting Date = Effective for use on lettings on or after this date - Be sure
to select the RSP or RPD for the correct Letting date you need
Section 100 - General Provisions
RSP or RPD |
Description |
Rev. Date* |
Letting Date** |
Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN150001 | 01/26/15 |
02/18/15 |
|
Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN150006 | 01/26/15 |
02/18/15 |
|
Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN______ (edit.) | 10/26/06 |
09/01/13 |
|
FHWA - 1273 | 05/01/12 |
09/01/13 |
|
Disadvantaged Business Enterprise Procedure and Good Faith Efforts | 04/15/14 |
06/01/14 |
|
DBE and Non-DBE Goal Contracts Record Keeping and Timely Pay | 04/15/14 |
06/01/14 |
|
Executive Order 11246 - Discontinue Use after July 31, 2015 | 04/15/14 |
06/01/14 |
|
Executive Order 11246 | 05/21/15 |
08/01/15 |
|
Title VI Assurances - Discontinue Use after July 31, 2015 | 10/05/10 |
09/01/13 |
|
Title VI Assurances | 05/21/15 |
08/01/15 |
|
As-Built Traffic Signal Plans | 08/15/07 |
09/01/13 |
|
Standard Specifications | 05/23/13 |
09/01/13 |
|
IDOA M/WBE Participation Policy for Construction Projects - Discontinue Use after July 31, 2015 | 12/06/12 |
09/01/13 |
|
IDOA M/WBE Participation Policy for Construction Projects | 05/21/15 |
08/01/15 |
|
Subcontract Report and Payment Requirement | 08/12/14 |
11/01/14 |
|
E-Mail Submittal of Electronic Documents for Bid Express | 04/23/08 |
09/01/13 |
|
As-Built Lighting Plans | 04/17/12 |
09/01/13 |
|
Alternate Pavement Sections, Present Value Cost And Pavement Section For Construction Of The Mainline, Shoulders And Ramps | 03/27/13 |
09/01/13 |
|
Structure Numbers for Pay Items (edit.) | 09/01/05 |
09/01/13 |
|
Substantial Completion | 09/18/14 |
12/01/14 |
|
Schedule of Pay Items for Option Bids (edit.) | 06/10/13 |
09/01/13 |
|
Prequalification | 05/23/13 |
09/01/13 |
|
Owners' and Contractors's Protective Liability Insurance Coverage for Operations of the Designated Contractor (edit.) | 05/23/13 |
09/01/13 |
|
DBE Joint Check Request Form | 12/11/14 |
02/01/15 |
|
Traffic Control Changes and On-Call Maintenance of Traffic Control Devices (edit.) | 09/01/05 |
09/01/13 |
|
Schedule of Operations and Traffic Control for Undersealing, Concrete Patching, Placing Underdrains and Resurfacing (edit.) | 05/23/13 |
09/01/13 |
|
Submittal of Shop Drawings and Falsework Plans for LPA Projects | 06/11/09 |
09/01/13 |
|
Construction Engineering and Inspection for Utility Relocation | 03/01/10 |
09/01/13 |
|
GPS Rover for Use by Project Personnel | 09/19/13 |
12/01/13 |
|
Environmental Restrictions | 05/23/13 |
09/01/13 |
|
Statements About Existing Conditions of Utilities, Additional Right-of-Way, and Encroachments (edit.) | 05/23/13 |
09/01/13 |
|
Incentive For Opening Project To Traffic Ahead of Schedule (edit.) | 05/23/13 |
09/01/13 |
|
Percentage of Work Required of Prime Contractor | 05/23/13 |
09/01/13 |
|
Latest Date to Begin Work (edit.) | 05/23/13 |
09/01/13 |
|
Failure to Complete on Time For Restriction - One Structure (edit.) | 05/23/13 |
09/01/13 |
|
Failure to Complete on Time for Restrictions - 2 or More Structures (edit.) | 05/23/13 |
09/01/13 |
|
Failure to Complete on Time for Road Closure (edit.) | 05/23/13 |
09/01/13 |
|
Failure to Complete on Time for Intermediate Completion Date (edit.) | 05/23/13 |
09/01/13 |
|
Failure to Complete on Time for Calendar Completion Date (edit.) | 05/23/13 |
09/01/13 |
|
Earliest Date To Begin Work (edit.) | 05/23/13 |
09/01/13 |
|
Storm Water, Erosion, and Sediment Control Inspection Report | 04/19/12 |
09/01/13 |
|
Critical Path Method Schedule | 05/23/13 |
09/01/13 |
|
Contract Completion due to IDEM Notice of Termination, NOT | 02/20/14 |
03/05/14 |
|
Working Restrictions During Certain Holiday Periods | 05/23/13 |
09/01/13 |
|
Specialty Pay Items | 09/01/05 |
09/01/13 |
|
Construction Equipment in Park Areas | 05/23/13 |
09/01/13 |
|
Project Estimate Adjustment | 07/27/07 |
09/01/13 |
|
PG Asphalt Binder Material Cost Adjustments | 05/23/13 |
09/01/13 |
|
Dowel Bar Assembly Stockpiled Materials Requirements | 05/23/13 |
09/01/13 |
|
State Funded Contract Requirements | 09/01/05 |
09/01/13 |