Language Translation
  Close Menu
Section 700 RSP

Indiana Department of Transportation

INDOT > Doing Business with INDOT > Standards and Specifications >Recurring Special Provisions & Plan Details > Current Edition
Recurring Special Provisions & Plan Details

                                    Effective for Lettings on or after September 1, 2009


*Revision Date = Date the Recurring Special Provision was Added or Revised
**Letting Date = Effective for use on lettings on or after this date - Be sure to select the RSP or RPD for the correct letting date you need

Section 700 - Structures

RSP or RPD
Description
Rev. Date*
Letting Date**
Bitumen Coating for Piles
09/01/05
09/01/09
Pile Driving (edit. doc)
03/18/10
05/01/10
Oversized Predrilled Pile Holes and Bentonite Grout for Reduction of Pile Downdrag
01/15/09
09/01/09
Driven Piling
05/18/09
09/01/09
Reinforcing Bars for Metric Designed Contracts
04/08/09
09/01/09
Bridge Railing Type TS-1 &
Guardrail Transition Type TGS-1
04/15/10
09/01/10
Bridge Railing Transition WBC Attachment of Guardrail
10/21/10
03/01/11
Bridge Railing Transition WBC or TBC Details at End Bent
10/21/10
03/01/11
Bridge Railing Transition TBT Details at End Bent
10/21/10
03/01/11
Bridge Railing Transition TBC or TBT
Attachment of Guardrail
10/21/10
03/01/11
Alternate Prestressed Precast Concrete I-Beam to Standard AASHTO Type IV Prestressed Precast Concrete I-Beam
09/01/05
09/01/09
Interior Diaphragms
05/24/06
09/01/09
Adjacent Prestressed-Concrete Box Beams
06/18/09
09/01/10
Surface Seal for Steel Bridge to be Painted
09/01/05
09/01/09
Temporary Pipe
09/01/05
09/01/09
Concrete Box Scour Protection
04/15/10
09/01/10
Mandrel Testing of Thermoplastic Pipes
03/18/10
09/01/10
Pipe Culvert Scour Protection
04/15/10
09/01/10
Alternates to Structural Plate Structures
11/01/06
09/01/09
Extension of Cast Iron Floor Drains
09/01/05
09/01/09
Capped Inlet
09/01/05
09/01/09
Drainage Structures
09/01/05
09/01/09
Price Adjustment for Bridge Deck Overlay, Additional
06/17/10
09/01/10
Three-Sided Scour Protection
04/15/10
09/01/10
Approved Expansion Joint SS Devices
03/21/06
09/01/09
Expansion Joint Sealing System
07/14/06
09/01/09
Alternate SS Joint Part
01/22/01
09/01/09
Slip Lining of Existing Pipe
01/04/08
09/01/09
Concrete Repair by Epoxy Injection
09/01/05
09/01/09
Concrete for Patching Bridge Structures
04/08/09
09/01/09
QC/QA Superstructure Concrete
04/08/09
09/01/09
Mechanically Stabilized Earth Retaining Walls
04/25/11
10/01/10
Modular Concrete Block Retaining Walls
06/17/10
10/01/10
Metal Bin-Type Retaining Wall
02/16/06
09/01/09
Silica Fume Modified Structural Concrete Bridge Deck Overlay
04/06/06
09/01/09
Permanent Earth Retention System For Cut-Wall Application
08/20/09
03/01/10
Limiting Movement Criteria For Permanent Earth Retention System For Cut-Wall Application (edit. doc)
08/20/09
03/01/10
[an error occurred while processing this directive]

INDOT Events

More News & Events

Top FAQs