Section 200 RSP

Indiana Department of Transportation

INDOT > Doing Business with INDOT > Standards and Specifications >Recurring Special Provisions & Plan Details > Current Edition
Recurring Special Provisions & Plan Details

                                    Effective for Lettings on or after September 1, 2009


*Revision Date = Date the Recurring Special Provision was Added or Revised
**Letting Date = Effective for use on lettings on or after this date - Be sure to select the RSP or RPD for the correct letting date you need

Section 200 - Earthwork


RSP or RPD
Description
Rev. Date*
Letting Date**
Recycled Foundry Sand
01/12/07
09/01/09
Clearing Right-of-Way (edit. doc)
09/01/05
09/01/09
Debris Removal at Bridge Structures
09/01/05
09/01/09
Open Burning of Natural Growth Permitted
09/01/05
09/01/09
Air-Curtained Open-Pit Incineration of Natural Growth Required
09/01/05
09/01/09
Inspection and Testing for Asbestos Material
09/01/05
09/01/09
Election to Produce Recycled Concrete Aggregate
11/01/07
09/01/09
Mandatory to Production of Recycled Concrete Aggregate
11/01/07
09/01/09
Removal of Existing Traffic Signal Equipment (edit. doc)
11/30/06
09/01/09
Marion County Borrow Areas
09/01/05
09/01/09
Borrow Area Wetland Enhancement
09/01/05
09/01/09
Embankments Constructed of Coal Combustion By-Products
09/01/05
09/01/09
Approval of Borrow and Disposal Sites
03/20/08
09/01/09
Dynamic Cone Penetrometer Testing for Embankment
10/21/10
01/01/11
Steel Sheet Piling at Railroad Grade Separation
09/01/05
09/01/09
General Bridge Requirements
04/08/09
09/01/09
Subgrade Treatment for Trails on Abandoned-Railroad Corridor
01/21/10
07/01/10
Subgrade and Chemically Modified Soils
12/16/10
04/01/11
Gore Area Treatment
09/01/05
09/01/09
Crushed Glass as Bedding Material
09/01/05
09/01/09
Structure Backfill for Retaining Wall
06/17/10
10/01/10