Language Translation
  Close Menu
INDOT: Division 700 RSPs (2024 SS)

Recurring Special Provisions and Plan Details

Effective for Lettings with the 2024 INDOT Standard Specifications

| RSP Home | Division 100 | Division 200 | Division 300 | Division 400 |

| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |

*Revision Date = Date the Recurring Special Provision was Added or Revised (mm/dd/yy)
**Letting Date = Effective for use on lettings on or after this date (mm/dd/yy) - Be sure to select the RSP or RPD for the correct letting date you need

Division 700 - Structures

RSP or RPD
Description
Revision Date*
Letting Date**
Bridge Load Rating Calculations and Summary (edit.)
04/25/21
09/01/21
Pile Driving (edit.)
04/19/11
09/01/13
Headwalls, Wingwalls, and Footings Construction on an Existing Structure
09/16/21
03/01/22
Structural Concrete
11/17/23
06/01/24
Lightweight Concrete for Floor Slabs
11/17/23
06/01/24
Bridge Railing Type TS-1; Guardrail Transition Type TGS-1
04/15/10
09/01/11
Bridge Railings
10/19/23
03/01/24
Bridge Railings and Moments Slabs
01/18/24
06/01/24
Pneumatically Placed Mortar
08/17/23
03/01/24
Steel Structures
05/20/23
09/01/23
Welding Specifications
05/20/23
09/01/23
Waterproofing Membrane for Reinforced-Concrete Box Structures and Three-Sided Structures
05/20/23
09/01/23
Waterproofing Membrane for Reinforced-Concrete Box Structures and Three-Sided Structures
01/18/24
09/01/24
Pipe Culverts, and Storm and Sanitary Sewers
07/20/23
12/01/23
Pipe Culverts, and Storm and Sanitary Sewers
11/17/23
06/01/24
Curb Inlet Casting
05/20/23
09/01/23
Concrete Bridge Deck Overlays
10/19/23
03/01/24
Approved Expansion Joint Type SS Devices
05/20/23
09/01/23
Bridge Expansion Joints
07/20/23
12/01/23
Alternate SS Joint Part 👉 [Discontinue use after May 31, 2024]
01/22/01
01/22/01
Cured-In-Place Pipe Liner, CIPP
09/16/21
03/01/22
Bearing Assemblies
08/17/23
06/01/24
Drilled Shaft Foundations
10/19/23
03/01/24
Limiting Movement Criteria For Permanent Earth Retention System For Cut-Wall Application (edit.)
08/20/09
09/01/13
Temporary MSE Retaining Wall
07/20/23
12/01/23
Warranted Polymer Overlay System for Bridge Deck Surfaces and Polymer Overlay
System for Non-Bridge Decks
05/20/23
09/01/23
Warranted Polymer Overlay System for Bridge Deck Surfaces and Polymer Overlay
System for Non-Bridge Decks
01/18/24
06/01/24

INDOT Events

More News & Events

Top FAQs