Indiana Department of Transportation
INDOT > Doing Business with INDOT > Standards and Specifications >Recurring Special Provisions & Plan Details > September 2011 Edition Recurring Special Provisions & Plan Details
Effective for Lettings on or after September 1, 2011
| RSP Home |
Section 100 |
Section 200 |
Section 300 |
Section 400 |
| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |
| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |
*Revision Date = Date the Recurring Special Provision was Added or Revised
**Letting Date = Effective for use on lettings on or after this date - Be sure
to select the RSP or RPD for the correct Letting date you need
Section 100 - General Provisions
RSP or RPD |
Description |
Rev. Date* |
Letting Date** |
| Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN130001 | 01/07/13 |
01/07/13 |
|
| Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN130006 | 01/07/13 |
01/07/13 |
|
| Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN______ (edit.) | 10/26/06 |
09/01/11 |
|
| FHWA - 1273 | 05/01/12 |
06/25/12 |
|
| Disadvantaged Business Enterprise Procedure and Good Faith Efforts | 02/21/13 |
04/01/13 |
|
| Disadvantaged Business Enterprise Procedure and Good Faith Efforts | 04/19/13 |
07/01/13 |
|
| DBE Record Keeping and Timely Pay | 08/24/12 |
11/01/12 |
|
| Executive Order 11246 | 03/09/06 |
09/01/11 |
|
| Title VI Assurances | 10/05/10 |
09/01/11 |
|
| As-Built Traffic Signal Plans | 08/15/07 |
09/01/11 |
|
| Standard Specifications | 05/23/11 |
09/01/11 |
|
| IDOA M/WBE Participation Policy for Construction Projects | 12/06/12 |
12/06/12 |
|
| E-Mail Submittal of Electronic Documents for Bid Express | 04/23/08 |
09/01/11 |
|
| As-Built Lighting Plans | 04/17/12 |
09/01/12 |
|
| Alternate Pavement Sections, Present Value Cost And Pavement Section For Construction Of The Mainline, Shoulders And Ramps | 03/27/13 |
06/01/13 |
|
| Structure Numbers for Pay Items (edit.) | 09/01/05 |
09/01/11 |
|
| Schedule of Pay Items for Alternate Bids (edit.) | 09/01/05 |
09/01/11 |
|
| Prequalification | 09/01/05 |
09/01/11 |
|
| Owners' and Contractors's Protective Liability Insurance Coverage for Operations of the Designated Contractor (edit.) | 05/23/11 |
09/01/11 |
|
| DBE Certification for Non-DBE Goal Contracts | 06/17/10 |
09/01/11 |
|
| Traffic Control Changes and On-Call Maintenance of Traffic Control Devices (edit.) | 09/01/05 |
09/01/11 |
|
| Schedule of Operations and Traffic Control for Undersealing, Concrete Patching, Placing Underdrains and Resurfacing (edit.) | 05/19/11 |
09/01/11 |
|
| Submittal of Shop Drawings and Falsework Plans for LPA Projects | 12/06/12 |
12/06/12 |
|
| Construction Engineering and Inspection for Utility Relocation | 03/01/10 |
09/01/11 |
|
| Structure Flowline Vertification | 02/21/13 |
04/01/13 |
|
| Buy America Requirement and Certification | 02/21/13 |
04/01/13 |
|
| Environmental Restrictions | 04/01/08 |
09/01/11 |
|
| Use of Cones in Lieu of Drums | 03/30/07 |
09/01/11 |
|
| Statements About Existing Conditions of Utilities, Additional Right-of-Way, and Encroachments (edit.) |
02/18/08 |
09/01/11 |
|
| Incentive For Opening Project To Traffic Ahead of Schedule (edit.) | 09/01/05 |
09/01/11 |
|
| Percentage of Work Required of Prime Contractor | 09/01/05 |
09/01/11 |
|
| Latest Date to Begin Work (edit.) | 09/01/05 |
09/01/11 |
|
| Failure to Complete on Time For Restriction - One Structure (edit.) | 08/21/06 |
09/01/11 |
|
| Failure to Complete on Time for Restrictions - 2 or More Structures (edit.) | 08/21/06 |
09/01/11 |
|
| Failure to Complete on Time for Road Closure (edit.) | 08/21/06 |
09/01/11 |
|
| Failure to Complete on Time for Intermediate Completion Date (edit.) | 09/01/05 |
09/01/11 |
|
| Failure to Complete on Time for Calendar Completion Date (edit.) | 09/01/05 |
09/01/11 |
|
| Earliest Date To Begin Work (edit.) | 09/01/05 |
09/01/11 |
|
| Temporary Erosion Control Measures | 02/21/13 |
04/01/13 |
|
| Storm Water, Erosion, and Sediment Control Inspection Report | 04/19/12 |
09/01/12 |
|
| Reporting Subcontract Payments | 07/11/07 |
09/01/11 |
|
| Critical Path Method Schedule | 03/24/10 |
09/01/11 |
|
| Working Restrictions During Certain Holiday Periods | 05/19/11 |
09/01/11 |
|
| Specialty Pay Items | 09/01/05 |
09/01/11 |
|
| Construction Equipment in Park Areas | 09/01/05 |
09/01/11 |
|
| Project Estimate Adjustment | 07/27/07 |
09/01/11 |
|
| Contract Liens | 07/27/07 |
09/01/11 |
|
| PG Asphalt Binder Material Cost Adjustments | 02/15/13 |
09/01/11 |
|
| Stockpiled Materials | 04/08/09 |
09/01/11 |
|
| Dowel Bar Assembly Stockpiled Materials Requirements | 12/05/11 |
03/01/12 |
|
| State Funded Contract Requirements | 09/01/05 |
09/01/11 |
