Note: This message is displayed if (1) your browser is not standards-compliant or (2) you have you disabled CSS. Read our Policies for more information.
*Revision Date = Date the Recurring Special Provision was Added or Revised
**Letting Date = Effective for use on lettings on or after this date - Be sure to select the RSP or RPD for
the correct letting date you need
RSP or RPD |
Description |
Rev. Date* |
Letting Date** |
| Recycled Foundry Sand | 01/12/07 |
09/01/09 |
|
| Clearing Right-of-Way (edit. doc) | 09/01/05 |
09/01/09 |
|
| Debris Removal at Bridge Structures | 09/01/05 |
09/01/09 |
|
| Open Burning of Natural Growth Permitted | 09/01/05 |
09/01/09 |
|
| Air-Curtained Open-Pit Incineration of Natural Growth Required | 09/01/05 |
09/01/09 |
|
| Inspection and Testing for Asbestos Material | 09/01/05 |
09/01/09 |
|
| Election to Produce Recycled Concrete Aggregate | 11/01/07 |
09/01/09 |
|
| Mandatory to Production of Recycled Concrete Aggregate | 11/01/07 |
09/01/09 |
|
| Removal of Existing Traffic Signal Equipment (edit. doc) | 11/30/06 |
09/01/09 |
|
| Marion County Borrow Areas | 09/01/05 |
09/01/09 |
|
| Borrow Area Wetland Enhancement | 09/01/05 |
09/01/09 |
|
| Embankments Constructed of Coal Combustion By-Products | 09/01/05 |
09/01/09 |
|
| Approval of Borrow and Disposal Sites | 03/20/08 |
09/01/09 |
|
| Dynamic Cone Penetrometer Testing for Embankment | 10/21/10 |
01/01/11 |
|
| Steel Sheet Piling at Railroad Grade Separation | 09/01/05 |
09/01/09 |
|
| General Bridge Requirements | 04/08/09 |
09/01/09 |
|
| Subgrade Treatment for Trails on Abandoned-Railroad Corridor | 01/21/10 |
07/01/10 |
|
| Subgrade and Chemically Modified Soils | 12/16/10 |
04/01/11 |
|
| Gore Area Treatment | 09/01/05 |
09/01/09 |
|
| Crushed Glass as Bedding Material | 09/01/05 |
09/01/09 |
|
| Structure Backfill for Retaining Wall | 06/17/10 |
10/01/10 |