Early Coordination provides information on impending construction projects being planned throughout Indiana. All projects available for Early Coordination have been listed below, along with a copy of the project’s Early Coordination letter. If you wish to be considered as a candidate for the project please respond electronically or by mail no later than the due date.

Route Desc. Des. # Letter Respond Respond By
 SR 75  Bridge Rehab  0101309 Packetdanmiller@indot.in.gov  10/13/10
 SR 135  Small Structure  0600487 Packetbwilliamson@indot.in.gov  02/14/11
 US 52  Small Structure Replacement  0710638 Packetbwilliamson@indot.in.gov  03/20/11
 US 52  Small Structure Replacement  0710648 Packetbwilliamson@indot.in.gov  05/20/11
 SR 60  Pipe Repair  0800197 Packetbwilliamson@indot.in.gov  07/07/11
 Route-1X  Bridge Removal  1172481 Packetbwilliamson@indot.in.gov  08/01/11
 Route-US 52/SR1  Demolition  0902208 Packetbwilliamson@indot.in.gov  09/05/11
 Route-US 421  Demolition  1006633 Packetbwilliamson@indot.in.gov  09/11/11
 Route-SR 62  Slide Correction  1173261 Packetbwilliamson@indot.in.gov  10/07/11
 Route-SR 62  Slide Correction 1173262 Packetbwilliamson@indot.in.gov  10/07/11