For information on projects submitted before January 1, 2005, please contact the Environmental Public Health Division.
Table of Contents
Campground Projects
Commercial On-Site Sewage Disposal Projects
- Abby Servies Day Care - 7906043
- Ackerman Hills Golf Course - 7915020
- Action Electric - 7912195
- Agricultural Exhibit Hall Wedding/Event Barn - 7918106
- Americus Pizza King - 7915248
- Animal Care Center Wolf Park - 7914062
- Avila Banquet Barn - 7918204
- Awakening Youth House - 7913177
- Best Way Disposal - 7906428
- Black Wine Tasting Room and residence - 7907008
- Buck Creek Pizza - 7910224
- Church Alive - 7916210
- Crockett Farm Meeting Barn - 7916094
- DogWood Kennel - 7912116
- Dollar General Romney - 7911050
- Dollar General West Point - 7919003
- Exploration Acres Event Barn/Corn Maze - 7914077
- Family Express Gas & C-Store - 7915236
- Gardiner Property - 7909020
- Hi-Tech Trucking - 7907094
- Indiana American Water - 7908022
- IOOF - 7910128
- Ivy Tech Community College - 7909101
- John S. Wright Conference Center - 7918176
- Kelley Lake Subdivision - 7916180
- Lee and Emily's Kennel - 7917135
- Legado Development Holding Tank - 7914134
- Long-House farm, LLC - 7905123
- M.R.S. Motors - 7910205
- Mid American Trailer Repair - 7905090
- Midwest Rentals - 7910006
- New Journey Farms Event Barn - 7918233
- Point East Mobile Home Park - 7906325
- Pro Axis, Inc. - 7906111
- Prophetstown S.P. Aquatic Ctr - 7912111
- Prophetstown State Park Sewer Ext. - 7907124
- Purdue Baker Farm - 7909275
- Ratcliff Barn - 7917269
- Road Works - 7905369
- Road Works Mnf, Inc. - 7906078
- Rommey Fish Farm - 7907080
- Romney C-Store & Restaurant & Marathon - 7914117
- Soil Maker Pole Barn - 7918267
- SP Storage and Office - 7917255
- St. Alexis Orthodox Church - 7906195
- The Stables Event Center - 7918136
- Thermo King - 7918243
- Tipmont REMC - 7908174
- Tippecanoe Cellars - 7915010
- Tippecanoe County Soccer Facility - 7911230
- Tippecanoe Township Fire Department - 7916258
- Tippecanoe Township Fire Dept. Annex - 7919001
- TKO Graphix - 7913098
- Viverde Landscaping - 7912170
- Wea Township Fire Dept. Annex - 7917196
- West Lafayette Apostolic Christian Ch. - 7909051
- West Lafayette Storage - 7919014
- Wolf Park Lecture Hall - 7911063
Community Sewage Disposal Projects
Mobile Home Park Projects
Youth Camp Projects
Other Projects
Campground Projects
Big Fish North Campground
E side 900 E, 3/4-mi S of 500 S
Project Number: 7910017
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 1/26/2010 12:00:00 AM |
| Date of Review: | 3/9/2010 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | No |
| System Type: | Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Commercial On-Site Sewage Disposal Projects
Abby Servies Day Care
231 and 1050 South
Project Number: 7906043
Reviewer: Dennis Ehlers (Retired)
Soils:
| Soils Survey Received: | 2/14/2006 12:00:00 AM |
| Date of Review: | 2/15/2006 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | No |
| System Type: | Gravity |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Ackerman Hills Golf Course
E side McCormick Rd, N of Fairway Lane
Project Number: 7915020
Reviewer: Robert Synko
Soils:
| Soils Survey Received: | 2/2/2015 12:00:00 AM |
| Date of Review: | 5/27/2015 12:00:00 AM |
| Action Taken: | Additional Information Required |
| Referred to LHD: | No |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Action Electric
1255 SR 25 W
Project Number: 7912195
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 10/3/2012 12:00:00 AM |
| Date of Review: | 11/7/2012 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Gravity |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Agricultural Exhibit Hall Wedding/Event Barn
5074 E. 550 S.
Project Number: 7918106
Reviewer: Marc Hancock
| Soils Survey Received: | 5/17/2018 12:00:00 AM | |
| Date of Review: | 6/8/2018 12:00:00 AM | |
| Action Taken: | Additional Information Required | |
| Referred to LHD: | No | |
| System Type: | ||
| Soils 1: | ||
| Soils Survey Received: | 6/18/2018 12:00:00 AM | |
| Date of Review: | 6/18/2018 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | SLS | |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 7/26/2018 | 8/29/2018 | Email sent |
| 8/31/2018 | 9/12/2018 | Approved Plans 09/12/18 Approval Number: 1879081 |
Americus Pizza King
7506 SR 25 N
Project Number: 7915248
Reviewer: Marc Hancock
| Soils Survey Received: | 9/25/2015 12:00:00 AM | |
| Date of Review: | 10/7/2015 12:00:00 AM | |
| Action Taken: | Additional Information Required | |
| Referred to LHD: | No | |
| System Type: | ||
| Soils 1: | ||
| Soils Survey Received: | 10/15/2015 12:00:00 AM | |
| Date of Review: | 10/15/2015 12:00:00 AM | |
| Action Taken: | Email sent | |
| Referred to LHD: | No | |
| System Type: | ||
| Soils 2: | ||
| Soils Survey Received: | 12/15/2015 12:00:00 AM | |
| Date of Review: | 12/17/2015 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Mound | |
| Soils 3: | ||
| Soils Survey Received: | 9/11/2017 12:00:00 AM | |
| Date of Review: | 9/14/2017 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Mound | |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 2/11/2016 | 2/15/2016 | Email sent |
| 11/7/2017 | 12/20/2017 | Comment Letter |
| 1/31/2018 | 2/14/2018 | Comment Letter |
| 5/29/2018 | 6/12/2018 | Comment Letter |
| 7/27/2018 | 8/9/2018 | Email sent |
| 10/4/2018 | 10/4/2018 | Approved Plans 10/04/18 Approval Number: 1879068 |
Animal Care Center Wolf Park
on Wolf Park grounds, NW of Gift Shop
Project Number: 7914062
Reviewer: Robert Synko
| Soils Survey Received: | 4/23/2014 12:00:00 AM | |
| Date of Review: | 6/19/2014 12:00:00 AM | |
| Action Taken: | Additional Information Required | |
| Referred to LHD: | No | |
| System Type: | ||
| Soils 1: | ||
| Soils Survey Received: | 6/17/2014 12:00:00 AM | |
| Date of Review: | 11/14/2014 12:00:00 AM | |
| Action Taken: | Email sent | |
| Referred to LHD: | No | |
| System Type: | ||
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Avila Banquet Barn
4815 Old SR 25 N.
Project Number: 7918204
Reviewer:
Soils:
| Soils Survey Received: | 8/29/2018 12:00:00 AM |
| Date of Review: | |
| Action Taken: | |
| Referred to LHD: | No |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Awakening Youth House
8750 Kirkridge Rd
Project Number: 7913177
Reviewer: Zach Snively
Soils:
| Soils Survey Received: | 8/5/2013 12:00:00 AM |
| Date of Review: | 9/16/2013 12:00:00 AM |
| Action Taken: | Site Rejected |
| Referred to LHD: | No |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Best Way Disposal
Old CR 350 S
Project Number: 7906428
Reviewer:
Soils:
| Soils Survey Received: | 11/29/2006 12:00:00 AM |
| Date of Review: | 12/4/2006 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Black Wine Tasting Room and residence
3233 E 200 N
Project Number: 7907008
Reviewer: Dennis Ehlers (Retired)
Soils:
| Soils Survey Received: | 1/11/2007 12:00:00 AM |
| Date of Review: | 1/12/2007 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Gravity |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Buck Creek Pizza
SW corner Main & North St
Project Number: 7910224
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 9/29/2010 12:00:00 AM |
| Date of Review: | 10/27/2010 12:00:00 AM |
| Action Taken: | Site Rejected |
| Referred to LHD: | No |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Church Alive
2323 Shoshone Ct.
Project Number: 7916210
Reviewer: Robert Synko
| Soils Survey Received: | 8/3/2016 12:00:00 AM | |
| Date of Review: | 8/19/2016 12:00:00 AM | |
| Action Taken: | Additional Information Required | |
| Referred to LHD: | No | |
| System Type: | Flood-Dosed | |
| Soils 1: | ||
| Soils Survey Received: | 8/25/2016 12:00:00 AM | |
| Date of Review: | 8/25/2016 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Flood-Dosed | |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 11/28/2016 | 12/28/2016 | Email sent |
| 1/19/2017 | 2/15/2017 | Comment Letter |
| 4/19/2017 | 5/3/2017 | Comment Letter |
| 6/12/2017 | 6/23/2017 | Called Engineer |
| 6/23/2017 | 6/23/2017 | Approved Plans 06/26/17 Approval Number: 1779048 |
Crockett Farm Meeting Barn
500 W. and 200 S.
Project Number: 7916094
Reviewer: Robert Synko
Soils:
| Soils Survey Received: | 4/11/2016 12:00:00 AM |
| Date of Review: | 1/4/2017 12:00:00 AM |
| Action Taken: | Additional Information Required |
| Referred to LHD: | No |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
DogWood Kennel
4050 E 300 N
Project Number: 7912116
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 6/18/2012 12:00:00 AM |
| Date of Review: | 7/13/2012 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | No |
| System Type: | Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 1/8/2013 | 1/16/2013 | Called Engineer |
| 1/22/2013 | 1/25/2013 | Approved Plans 01/25/13 Approval Number: 1379005 |
Dollar General Romney
SW corner US 231 & SR 28
Project Number: 7911050
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 3/15/2011 12:00:00 AM |
| Date of Review: | 4/6/2011 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Dollar General West Point
West side of SR 25, south of Turner Rd.
Project Number: 7919003
Reviewer:
Soils:
| Soils Survey Received: | 1/7/2019 12:00:00 AM |
| Date of Review: | 2/13/2019 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Grav./FD/SLS/ESM |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Exploration Acres Event Barn/Corn Maze
6042 New Castle Rd
Project Number: 7914077
Reviewer: Alice Quinn
| Soils Survey Received: | 5/7/2014 12:00:00 AM | |
| Date of Review: | 7/1/2014 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Flood-Dosed | |
| Soils 1: | ||
| Soils Survey Received: | 6/5/2015 12:00:00 AM | |
| Date of Review: | 8/21/2015 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Flood-Dosed | |
| Soils 2: | ||
| Soils Survey Received: | 8/25/2015 12:00:00 AM | |
| Date of Review: | 8/26/2015 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Time dosed Mound | |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 1/4/2016 | 4/15/2016 | Email sent |
| 9/27/2016 | 10/28/2016 | Email sent |
| 11/21/2016 | 11/29/2016 | Email sent |
| 12/1/2016 | 12/2/2016 | Approved Plans 12/05/16 Approval Number: 1679093 |
Family Express Gas & C-Store
NE corner 300 N & SR 25
Project Number: 7915236
Reviewer: Robert Synko
| Soils Survey Received: | 9/21/2015 12:00:00 AM | |
| Date of Review: | 8/17/2016 12:00:00 AM | |
| Action Taken: | Additional Information Required | |
| Referred to LHD: | No | |
| System Type: | ||
| Soils 1: | ||
| Soils Survey Received: | 8/19/2016 12:00:00 AM | |
| Date of Review: | 8/22/2016 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Flood-Dosed | |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Gardiner Property
NE corner SR 43 & CR 600N
Project Number: 7909020
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 2/17/2009 12:00:00 AM |
| Date of Review: | 2/17/2009 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | No |
| System Type: | Mound |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Hi-Tech Trucking
3691 S. 500 E
Project Number: 7907094
Reviewer: Dennis Ehlers (Retired)
Soils:
| Soils Survey Received: | 3/22/2007 12:00:00 AM |
| Date of Review: | 3/27/2007 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Indiana American Water
Ninth St and Davis Ferry Rd.
Project Number: 7908022
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 1/31/2008 12:00:00 AM |
| Date of Review: | 2/15/2008 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
IOOF
E side SR 43, 0.3 mi S of SR 225
Project Number: 7910128
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 5/24/2010 12:00:00 AM |
| Date of Review: | 6/2/2010 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Gravity |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Ivy Tech Community College
~ 4505 SR 38E
Project Number: 7909101
Reviewer: Dennis Ehlers (Retired)
Soils:
| Soils Survey Received: | 5/28/2009 12:00:00 AM |
| Date of Review: | 6/16/2009 12:00:00 AM |
| Action Taken: | Email sent |
| Referred to LHD: | No |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
John S. Wright Conference Center
1007 N. 725 W.
Project Number: 7918176
Reviewer: Marc Hancock
Soils:
| Soils Survey Received: | 8/6/2018 12:00:00 AM |
| Date of Review: | 8/28/2018 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | No |
| System Type: | SLS |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 11/13/2018 | 12/18/2018 | Email sent |
| 2/8/2019 | 2/20/2019 | Email sent |
| 2/21/2019 | 2/25/2019 | Approved Plans 02/25/19 Approval Number: 1979020 |
Kelley Lake Subdivision
N on 100 W Past Cairo to I-65
Project Number: 7916180
Reviewer:
Soils:
| Soils Survey Received: | |
| Date of Review: | |
| Action Taken: | |
| Referred to LHD: | |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Lee and Emily's Kennel
6622 S SR 25
Project Number: 7917135
Reviewer:
Soils:
| Soils Survey Received: | 6/6/2017 12:00:00 AM |
| Date of Review: | 7/24/2017 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Gravity/Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Legado Development Holding Tank
2600 Schuyler Ave
Project Number: 7914134
Reviewer: Robert Synko
Soils:
| Soils Survey Received: | |
| Date of Review: | |
| Action Taken: | |
| Referred to LHD: | |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 7/10/2014 | 10/6/2014 | No Further Action |
Long-House farm, LLC
1810 Vinton St
Project Number: 7905123
Reviewer: Dennis Ehlers (Retired)
Soils:
| Soils Survey Received: | 3/29/2005 12:00:00 AM |
| Date of Review: | 3/29/2005 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
M.R.S. Motors
W side Conservation Club Rd .25-mi N SR25
Project Number: 7910205
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 8/31/2010 12:00:00 AM |
| Date of Review: | 10/20/2010 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Gravity |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Mid American Trailer Repair
US 52 & CR 400 S
Project Number: 7905090
Reviewer: Robert Synko
| Soils Survey Received: | 3/9/2005 12:00:00 AM | |
| Date of Review: | 4/11/2005 12:00:00 AM | |
| Action Taken: | Additional Information Required | |
| Referred to LHD: | No | |
| System Type: | ||
| Soils 1: | ||
| Soils Survey Received: | 4/19/2005 12:00:00 AM | |
| Date of Review: | 4/27/2005 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | Yes | |
| System Type: | Flood-Dosed | |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Midwest Rentals
3312 Klondike Rd
Project Number: 7910006
Reviewer: Robert Synko
Soils:
| Soils Survey Received: | 1/4/2010 12:00:00 AM |
| Date of Review: | 1/22/2010 12:00:00 AM |
| Action Taken: | Email sent |
| Referred to LHD: | No |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 1/4/2010 | 1/20/2010 | Email sent |
New Journey Farms Event Barn
N. of 2233 S' 800 E.
Project Number: 7918233
Reviewer:
| Soils Survey Received: | 10/4/2018 12:00:00 AM | |
| Date of Review: | 12/19/2018 12:00:00 AM | |
| Action Taken: | Additional Information Required | |
| Referred to LHD: | No | |
| System Type: | ||
| Soils 1: | ||
| Soils Survey Received: | 1/3/2019 12:00:00 AM | |
| Date of Review: | 1/29/2019 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | SLS | |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 2/25/2019 | 3/27/2019 | Email sent |
| 3/29/2019 | 3/29/2019 | Approved Plans 03/29/19 Approval Number: 1979027 |
Point East Mobile Home Park
Creasy lane and ST 38
Project Number: 7906325
Reviewer: Robert Synko
Soils:
| Soils Survey Received: | |
| Date of Review: | |
| Action Taken: | |
| Referred to LHD: | |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 9/12/2006 | 12/19/2006 | Comment Letter |
| 1/18/2007 | 2/12/2007 | Approved Plans 02/12/07 Approval Number: 0779014 |
Pro Axis, Inc.
Across rd from 4866 N. 9th St.
Project Number: 7906111
Reviewer: Dennis Ehlers (Retired)
Soils:
| Soils Survey Received: | 3/30/2006 12:00:00 AM |
| Date of Review: | 3/30/2006 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Gravity |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Prophetstown S.P. Aquatic Ctr
??
Project Number: 7912111
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 7/2/2012 12:00:00 AM |
| Date of Review: | 7/12/2012 12:00:00 AM |
| Action Taken: | Additional Information Required |
| Referred to LHD: | No |
| System Type: | Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 6/8/2012 | 6/8/2012 | Office Meeting |
| 9/14/2012 | 9/28/2012 | Called Engineer |
| 10/11/2012 | 10/18/2012 | Called Engineer |
| 10/17/2012 | 10/18/2012 | Called Engineer |
| 11/7/2012 | 11/8/2012 | Called Engineer |
| 11/8/2012 | 11/9/2012 | Called Engineer |
| 11/30/2012 | 11/30/2012 | Approved Plans 11/30/12 Approval Number: 1279092 |
Prophetstown State Park Sewer Ext.
Project Number: 7907124
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | |
| Date of Review: | |
| Action Taken: | |
| Referred to LHD: | No |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 1/19/2007 | 4/6/2007 | Called Engineer |
| 4/30/2007 | 6/1/2007 | Approved Plans 06/05/07 Approval Number: 0779092 |
Purdue Baker Farm
1 mi E of US 231 between 500N & 600N
Project Number: 7909275
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 12/14/2009 12:00:00 AM |
| Date of Review: | 1/8/2010 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | No |
| System Type: | Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 6/16/2010 | 7/8/2010 | Called Engineer |
| 7/23/2010 | 8/25/2010 | Approved Plans 08/31/10 Approval Number: 1079055 |
Ratcliff Barn
9950 US 231 S.
Project Number: 7917269
Reviewer:
| Soils Survey Received: | 11/27/2017 12:00:00 AM | |
| Date of Review: | 2/12/2018 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | FD/ESM/SLS | |
| Soils 1: | ||
| Soils Survey Received: | 10/23/2018 12:00:00 AM | |
| Date of Review: | 10/23/2018 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Flood-Dosed | |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 12/4/2018 | 1/8/2019 | Email sent |
| 1/23/2019 | 2/6/2019 | Email sent |
| 2/14/2019 | 2/21/2019 | Email sent |
| 2/28/2019 | 3/1/2019 | Approved Plans 03/01/19 Approval Number: 1979018 |
Road Works
CR 300 N at waggoneR31 E 300 N
Project Number: 7905369
Reviewer: Ed Miller
| Soils Survey Received: | 7/27/2005 12:00:00 AM | |
| Date of Review: | 8/17/2005 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Flood-Dosed | |
| Soils 1: | ||
| Soils Survey Received: | 11/9/2005 12:00:00 AM | |
| Date of Review: | 11/18/2005 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Flood-Dosed | |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 11/21/2005 | 12/16/2005 | Called Engineer |
| 12/29/2005 | 12/30/2005 | Called Engineer |
| 1/6/2006 | 1/23/2006 | Approved Plans |
| 2/23/2006 | 3/20/2006 | Approved Plans 01/23/06 Approval Number: 0679010 |
Road Works Mnf, Inc.
3565 E CR 300 N
Project Number: 7906078
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | |
| Date of Review: | |
| Action Taken: | |
| Referred to LHD: | |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 3/6/2006 | 3/22/2005 | Approved Plans 03/22/06 Approval Number: 0679010R |
Rommey Fish Farm
Project Number: 7907080
Reviewer: Dennis Ehlers (Retired)
Soils:
| Soils Survey Received: | 3/8/2007 12:00:00 AM |
| Date of Review: | 3/22/2007 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Romney C-Store & Restaurant & Marathon
NW corner SR 28 & US 231
Project Number: 7914117
Reviewer: Robert Synko
Soils:
| Soils Survey Received: | 6/23/2014 12:00:00 AM |
| Date of Review: | 7/1/2014 12:00:00 AM |
| Action Taken: | Email sent |
| Referred to LHD: | No |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Soil Maker Pole Barn
North side of S. River Rd., .5 mile W of 350 W.
Project Number: 7918267
Reviewer:
Soils:
| Soils Survey Received: | 12/3/2018 12:00:00 AM |
| Date of Review: | |
| Action Taken: | |
| Referred to LHD: | No |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
SP Storage and Office
943 SR 25 W
Project Number: 7917255
Reviewer:
Soils:
| Soils Survey Received: | 11/14/2017 12:00:00 AM |
| Date of Review: | 12/22/2017 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | No |
| System Type: | Gravity/Flood-Dosed/ESM |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
St. Alexis Orthodox Church
SR 43 and SR 225
Project Number: 7906195
Reviewer: Ed Miller
| Soils Survey Received: | 6/26/2006 12:00:00 AM | |
| Date of Review: | 6/29/2006 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Mound | |
| Soils 1: | ||
| Soils Survey Received: | 2/10/2012 12:00:00 AM | |
| Date of Review: | 4/17/2012 12:00:00 AM | |
| Action Taken: | Additional Information Required | |
| Referred to LHD: | No | |
| System Type: | ||
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
The Stables Event Center
S. of 350 S. on CR 100 E. to 7025, on SE corner
Project Number: 7918136
Reviewer: David Muntz
| Soils Survey Received: | 6/18/2018 12:00:00 AM | |
| Date of Review: | 11/16/2018 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Mound | |
| Soils 1: | ||
| Soils Survey Received: | 3/19/2019 12:00:00 AM | |
| Date of Review: | ||
| Action Taken: | ||
| Referred to LHD: | No | |
| System Type: | ||
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 1/18/2019 | 3/4/2019 | Email sent |
| 5/8/2019 |
Thermo King
E. of 3700 Veterans Memorial Parkway
Project Number: 7918243
Reviewer:
Soils:
| Soils Survey Received: | 10/23/2018 12:00:00 AM |
| Date of Review: | 12/3/2018 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Grav./FD/SLS/ESM |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Tipmont REMC
N side CR 600N, W of SR 43
Project Number: 7908174
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 6/20/2008 12:00:00 AM |
| Date of Review: | 6/24/2008 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Tippecanoe Cellars
SE of 5520 New castle Rd
Project Number: 7915010
Reviewer: David Muntz
Soils:
| Soils Survey Received: | 1/27/2015 12:00:00 AM |
| Date of Review: | 2/13/2015 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Mound/Flood Dose |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Tippecanoe County Soccer Facility
S side of Conservation Club Rd at dead end
Project Number: 7911230
Reviewer: Zach Snively
| Soils Survey Received: | 12/27/2011 12:00:00 AM | |
| Date of Review: | 1/24/2012 12:00:00 AM | |
| Action Taken: | Site Rejected | |
| Referred to LHD: | No | |
| System Type: | Flood-Dosed | |
| Soils 1: | ||
| Soils Survey Received: | 4/16/2012 12:00:00 AM | |
| Date of Review: | 4/23/2012 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Flood-Dosed | |
| Soils 2: | ||
| Soils Survey Received: | 7/16/2012 12:00:00 AM | |
| Date of Review: | 7/30/2012 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Flood-Dosed | |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 5/16/2012 | 5/29/2012 | Called Engineer |
| 6/4/2012 | 6/7/2012 | Approved Plans |
| 8/22/2012 | 9/6/2012 | Approved Plans |
| 9/10/2013 | 10/17/2013 | Approved Plans 10/18/13 Approval Number: 1379103 |
Tippecanoe Township Fire Department
NE corner of 600 N. and 50 W.
Project Number: 7916258
Reviewer: David Muntz
Soils:
| Soils Survey Received: | 9/27/2016 12:00:00 AM |
| Date of Review: | 10/18/2016 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | No |
| System Type: | Mound |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Tippecanoe Township Fire Dept. Annex
Project Number: 7919001
Reviewer:
Soils:
| Soils Survey Received: | 8/18/2019 12:00:00 AM |
| Date of Review: | |
| Action Taken: | |
| Referred to LHD: | No |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
TKO Graphix
N side 450 S, 1/2-mi E of US 52
Project Number: 7913098
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 5/2/2013 12:00:00 AM |
| Date of Review: | 6/25/2013 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Viverde Landscaping
2515 S 900 E
Project Number: 7912170
Reviewer: Zach Snively
Soils:
| Soils Survey Received: | 9/4/2012 12:00:00 AM |
| Date of Review: | 9/21/2012 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Wea Township Fire Dept. Annex
1700 Wea School Rd
Project Number: 7917196
Reviewer: David Muntz
Soils:
| Soils Survey Received: | 8/18/2017 12:00:00 AM |
| Date of Review: | 9/29/2017 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Gravity/Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
West Lafayette Apostolic Christian Ch.
E of 75E, N of 600N
Project Number: 7909051
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 3/19/2009 12:00:00 AM |
| Date of Review: | 4/7/2009 12:00:00 AM |
| Action Taken: | Additional Information Required |
| Referred to LHD: | No |
| System Type: | Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 5/26/2009 | 6/18/2009 | Called Engineer |
| 6/22/2009 | 6/23/2009 | Approved Plans 06/29/09 Approval Number: 0979049 |
West Lafayette Storage
East of Klondike Rd. on Linberg Rd. NE US 231
Project Number: 7919014
Reviewer:
Soils:
| Soils Survey Received: | 1/16/2019 12:00:00 AM |
| Date of Review: | 4/8/2019 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | Yes |
| System Type: | Grav./FD/SLS/ESM |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
Wolf Park Lecture Hall
On Wolf Park grounds, SE of gift shop
Project Number: 7911063
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 4/1/2011 12:00:00 AM |
| Date of Review: | 4/21/2011 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | No |
| System Type: | Flood-Dosed |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 5/27/2011 | 6/29/2011 | Called Engineer |
| 7/12/2011 | 7/12/2011 | Called Engineer |
| 7/26/2011 | 7/26/2011 | Called Engineer |
| 7/28/2011 | 7/28/2011 | Approved Plans 07/29/11 Approval Number: 1179064 |
Community Sewage Disposal System
Bridge Mill Subd. Cluster
North side of CR 200 N
Project Number: 7905222
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 5/11/2005 12:00:00 AM |
| Date of Review: | 4/21/2006 12:00:00 AM |
| Action Taken: | Technical Data Sheet issued |
| Referred to LHD: | No |
| System Type: | Mound |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 8/17/2006 | 9/29/2006 | Called Engineer |
| 11/22/2006 | 12/19/2006 | Approved Plans |
| 12/6/2006 | 12/19/2006 | Approved Plans 12/20/06 Approval Number: 0679159 |
Mobile Home Park Projects
Candlelight MHP (city water connection)
10 Candlelight Plaza
Project Number: 7914135
Reviewer: Robert Synko
Soils:
| Soils Survey Received: | |
| Date of Review: | |
| Action Taken: | |
| Referred to LHD: | |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 7/10/2014 | 10/22/2014 | Called Engineer |
| 3/24/2015 | 3/24/2015 | Email sent |
| 9/10/2015 | 9/10/2015 | Approved Plans 09/11/15 Approval Number: 1579044 |
Youth Camp Projects
Camp Sycamore Valley GSA
S side of SR 26 opposite 850 E
Project Number: 7911095
Reviewer: Robert Synko
| Soils Survey Received: | 5/12/2011 12:00:00 AM | |
| Date of Review: | 9/7/2011 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Flood-Dosed | |
| Soils 1: | ||
| Soils Survey Received: | 2/19/2013 12:00:00 AM | |
| Date of Review: | 9/19/2013 12:00:00 AM | |
| Action Taken: | Technical Data Sheet issued | |
| Referred to LHD: | No | |
| System Type: | Flood-Dosed | |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 9/30/2013 | 11/8/2013 | Called Engineer |
| 11/12/2013 | 11/19/2013 | Email sent |
| 11/26/2013 | 12/6/2013 | Approved Plans |
| 12/1/2013 | 12/6/2013 | Approved Plans 12/06/13 Approval Number: 1379123 |
Cary Boy Scout Camp
SR 26 and 500 E
Project Number: 7907170
Reviewer: Robert Synko
Soils:
| Soils Survey Received: | 5/11/2007 12:00:00 AM |
| Date of Review: | 6/5/2007 12:00:00 AM |
| Action Taken: | Responded to General Correspondence |
| Referred to LHD: | No |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 5/11/2007 | 6/5/2007 | No Further Action |
Cary Camp Shower House
6286 SR 26 E.
Project Number: 7916101
Reviewer: Robert Synko
Soils:
| Soils Survey Received: | 4/18/2016 12:00:00 AM |
| Date of Review: | 4/26/2016 12:00:00 AM |
| Action Taken: | Email sent |
| Referred to LHD: | No |
| System Type: |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 4/19/2016 | 5/3/2016 | Approved Plans 05/04/16 Approval Number: 1679029 |
Other Projects
First Reformed Church of Lafayette
Project Number: 7907340
Reviewer: Ed Miller
Soils:
| Soils Survey Received: | 10/15/2007 12:00:00 AM |
| Date of Review: | 12/12/2007 12:00:00 AM |
| Action Taken: | Additional Information Required |
| Referred to LHD: | No |
| System Type: | Mound |
| Date of Receipt | Date of review | Action Taken |
|---|---|---|
| 1/17/2008 | 1/25/2008 | Called Engineer |
| 2/18/2008 | 2/27/2008 | Approved Plans 02/28/08 Approval Number: 0879030 |