American Structurepoint has been selected as the project design consultant. The corridor has been divided into ten contracts:
- Contract One involves three overpass bridge projects for CR200S/Southway, CR50N/Carter, and CR200N
- Contract Two is from just north of Kokomo Creek to just north of the CR100S/Boulevard interchange.
- Contract Three and Contract Nine have been combined which is from just south of SR26 to just north of Kokomo Creek.
- Contract Four is from CR550N in Tipton Co. to just south of SR26.
- Contract Five and Contract Eight have been combined which is from just south of the interchange at US35/SR22 to just south of the Touby Pike interchange.
- Contract Six and Contract Ten have been combined which is from just south of the Touby Pike interchange to just north of the CR400N/US35 N Jct. interchange.
- Contract Seven is from just north of the CR400N/US35 N Jct. interchange to just north of the north terminus interchange
- Contract Eleven involves three environmental mitigation sites: Stream mitigation at a Log jam site in Jerome; Stream mitigation in The Reserve along East Fork of Little Wildcat Creek; Wetland mitigation for Tudor Drain.