INDOT > About INDOT > Central Office > Welcome to the Greenfield District > I-69 Major Moves 2020 & Campus Parkway Interchange > I-69 Major Moves 2020 & Campus Parkway Interchange I-69 Major Moves 2020 & Campus Parkway Interchange

Campus Parkway Interchange (Exit 210)

The project includes widening the Campus Parkway bridge over I-69 and reconfiguring the Campus Parkway interchange (Exit 210) into a double-crossover diamond design to improve traffic flow. Similar interchanges have recently been constructed at I-69 and SR 1 (Dupont Road) in Allen County and at I-65 and Worthsville Road in Johnson County.

How to Navigate a Double-Crossover Diamond Interchange

 

Traffic During Construction

  • All traffic motions at the Campus Parkway / Southeastern Parkway (Exit 210) interchange will remain open throughout construction. 
  • Widening of the bridge will be performed over several phases of construction.  The number of through lanes will be at least what is present at the start of construction.
  • During construction of the interchange there may be traffic congestion, especially during peak traffic periods and events at Klipsch Music Center.  Motorists are encouraged to plan alternate highway routes, such as State Road 38, State Road 37, State Road 13 and seek the best local route for their destination.  Message signs will be used to communicate delays and alternate routes to traffic.
  • Klipsch Music Center Events Calendar

Campus Parkway Construction Phasing

  • Phase 1 - Complete in Spring 2017
    • Construct new ramps where not in conflict with existing interchange configuration.
    • Interchange will operate in its current configuration.
    • Click on image to enlarge
  • Phase 2 - Shift to Double Crossover Diamond Begins Spring 2017
    • Continue Ramp construction
    • Begin Campus Parkway/Southeastern Parkway reconstruction
    • Interchange will operate in the Double Crossover Diamond Interchange configuration using temporary signals and crossover location
    • Click on image to enlarge
  • Phase 3-6 - Complete in Summer 2017
    • Complete ramp construction.
    • Complete Campus Parkway/Southeastern Parkway reconstruction
    • Interchange will operate in the proposed Double Crossover Diamond Interchange configuration.
    • Phase 3
    • Click on image to enlarge                                  
    • Phase 4 - Complete in Summer 2017
    • Click on image to enlarge                                           
    • Phase 5 - Complete in Summer 2017
    • Click on image to enlarge                         
    • Phase 6 - Complete in Summer 2017
    • Click on image to enlarge                       

Stay Informed

Follow @INDOTEast on Twitter and like us on Facebook at INDOTEastCentral. Join the conversation using the hashtag #I69MM2020

Email Updates from GovDelivery
To sign up for INDOT updates or to access your subscriber preferences, please enter your contact information below.