RM #24-06 Readoptions

LSA #24-381

Rulemaking Docket

The Rulemaking Docket is not available at this time.


Subject Matter of Rule

This rulemaking readopts:

170 IAC 1-2 Construction and Filing of Schedules of Rates, Tolls and Charges by Public Utilities
170 IAC 1-3 Advertising Expenditures by Public Utilities
170 IAC 1-5 Minimum Standard Filing Requirements for an Expedited Rate Case
170 IAC 4-1 Electric Utilities; Standards of Service
170 IAC 4-1.5 Service to New Buildings
170 IAC 4-2 Classification of Accounts
170 IAC 4-3 Electric Supply and Signal Lines; Principles of Safety; Co-ordination with Other Utilities
170 IAC 4-4.1 Cogeneration and Alternate Energy Production Facilities
170 IAC 4-4.2 Net Metering
170 IAC 4-4.3 Customer Generator Interconnection Standards
170 IAC 4-5 Electric Submeters of Master Meter Accounts
170 IAC 4-6 Ratemaking Treatment of Qualified Pollution Control Property Under Construction
170 IAC 4-7 Guidelines for Integrated Resource Planning by an Electric Utility
170 IAC 4-8 Guidelines for Demand-Side Cost Recovery by Electric Utilities
170 IAC 4-9 Vegetation Management Standards
170 IAC 5-1 Gas Utilities; Standards of Service
170 IAC 5-2 Classification of Accounts
170 IAC 6-1 Water; Standards of Service
170 IAC 6-1.1 Distribution System Improvement Charges (DSIC)
170 IAC 6-1.5 Extension of Water Mains
170 IAC 6-2 Classification of Accounts for Class A, B, and C Water Utilities
170 IAC 6-5 Water Tracker Procedure
170 IAC 8-2 Private Rural Sewage Utilities
170 IAC 8.5-1 Sewage Disposal Services
170 IAC 8.5-2 Customer Rights and Responsibilities
170 IAC 8.5-3 Operation of Sewage Lines
170 IAC 8.5-4 Extension of Sewer Mains
170 IAC 8.6-1 Sewer Tracker
170 IAC 10-1 Preservation of Records-Telephone Companies
170 IAC 10-2 Preservation of Records-Electric, Gas & Water
170 IAC 11-1 Combination Gas and Electric Private Utilities

Rulemaking Status

  1. Initial Notice of Readoption to Legislature
  2. Notice of Readoption
  3. Comment Period
  4. Final Rule for Readoption
  5. Final Rule

Notices/Documents

To view notices and documents related to this rulemaking, please click here.


Comment Time Period

The IURC is soliciting public comments on the proposed rule from December 4, 2024, to January 3, 2025. All comments must be postmarked or time stamped no later than January 3, 2025.


How to Submit Comments

If you have any questions or would like to submit comments related to this rulemaking, please contact Assistant General Counsel Taylor Costes:

Indiana Utility Regulatory Commission
101 West Washington Street, Suite 1500E
Indianapolis, Indiana 46204
(317) 232-2746 | Email


Public Comments Received

Public comments can be found here.