Directive No.
Title
Date Revised
100
General Materials Management Administration
101
Sample Submittal to Office of Materials Management
12/1/06
102
Expediting Testing of Samples
12/1/06
103
Office of Materials Management Safety Policy
1/1/13
104
District Laboratory Inspections
1/1/13
105
District Sample Proficiency Program
1/11/13
106
Qualified Laboratory Program
1/1/18
107
Independent Assurance and Qualified Acceptance Personnel Program
1/1/18
108
ITM Rules of Preparation
1/1/08
109
Material Certification For Contracts Utilizing SiteManager
6/1/09
110
New Products
3/23/16
111
Indiana Test Methods or Procedures
8/1/14
112
Failed Materials
8/1/14
200
Aggregate Materials
201
Certified Aggregate Producer Program Procedures
5/1/13
202
Production Quality Samples
4/24/12
203
Dolomite Aggregates
2/12/18
204
Composite Natural Sand Stockpiles
12/1/06
300
Asphalt Materials
301
Certified Hot Mix Asphalt Producer Program Procedures
4/19/17
302
Asphalt Materials
3/10/17
303
SUPERPAVE Gyratory Compactor (SGC) Specimen Fabrication
Mix designed for 2 hr conditioning
(Effective for Lettings prior to October 1, 2016)
4/5/16
303
Plate Sample Preparation and SUPERPAVE Gyratory Compactor (SGC) Specimen Fabrication
Mix designed for 4 hr conditioning
(Effective for Lettings on or after October 1, 2016)
4/11/18
304
QC/QA Hot Mix Asphalt Procedures
1/17/18
305
Hot Mix Asphalt Mix Design Laboratory Requirements
3/26/18
400
Concrete Materials
401
Portland Cements and Pozzolans
1/1/13
500
Soils
502
Dynamic Cone Penetrometer Criteria
6/1/18
600
Miscellaneous Materials
601
General Procedures for Controlling Materials
Approved Prior to Delivery to the Project
4/1/09
602
Structural Member Fabrication
9/14/11