Header

  Close Menu

Main Content

Permitted and registered solid and hazardous waste facilities, along with hazardous waste generators, owe annual operation fees. Invoices are mailed out by January 15 every year based on the permit/registration status on January 1, or the generator status during the previous year. They are due within 30 days of mailing, with a 10% late fee if they are still unpaid more than 30 days after the due date. Installment plans are available upon written request.

Solid Waste
  • Landfill or Incinerator >500 tons per day (TPD) = $35,000
  • Landfill or Incinerator 250-499 TPD = $15,000
  • Landfill or Incinerator 100-249 TPD = $7,000
  • Landfill or Incinerator <100 TPD = $2,000
  • Construction/Demolition Site = $1,500
  • Restricted Waste Site 1 = $35,000
  • Restricted Waste Site 2 = $25,000
  • Restricted Waste Site 3 = $10,000
  • Groundwater Compliance Sampling (for land disposal facilities) = $250 per well
  • Transfer Station = $2,000
  • Processing Facility = $2,000
  • Infectious Waste Incinerator >7 TPD = $5,000
  • Waste Tire Storage Facility = $500
  • Waste Tire Transporter = $25
Hazardous Waste (HW)
  • HW Landfill = $37,500
  • Groundwater Compliance Sampling (for active HW landfills) = $1,000 per well
  • HW Incinerator = $10,000 per unit
  • HW Storage = $2,500
  • HW Treatment = $10,000
  • HW Generator = $1,565
  • HW Post Closure Activity = $1,500

Disposal Fees

Solid waste disposal facilities, like landfills and incinerators, owe fees based on the amount of waste they dispose. It is generally $0.60 per ton, and is due by the 15th of the month following each calendar quarter. Hazardous waste disposal facilities, like landfills and underground injection sites, owe a higher fee of $11.50 per ton, which is due by March 1 each year. However, the maximum amount owed for disposal by underground injection is $25,000. All disposal fees also incur a 10% late charge if not paid on time.

Application and Renewal Fees

Application
  • Construction/Demolition Site = $20,000
  • Restricted Waste Site 1 = $31,300
  • Restricted Waste Site 2 = $31,300
  • Restricted Waste Site 3 = $20,000
  • Processing Facility (other) = $12,150
  • Transfer Station = $12,150
  • Incinerator = $28,650
  • Waste Tire Transporter = $25
  • Waste Tire Processing Operation = $200
  • Waste Tire Storage Site = $500
Renewal
  • Construction/Demolition Site = $7,150
  • Restricted Waste Site 1 = $15,350
  • Restricted Waste Site 2 = $15,350
  • Restricted Waste Site 3 = $7,150
  • Processing Facility (other) = $2,200
  • Transfer Station = $2,200
  • Incinerator $5,900
  • Waste Tire Transporter = $0
  • Waste Tire Processing Operation = $200
  • Waste Tire Storage Site $0

More information is available from the Indiana Code 13-20-21-3.

News and FAQs

Top FAQs