STATE OF
|
)
|
|
BEFORE THE INDIANA DEPARTMENT
|
||||
|
|
) |
SS: |
OF
ENVIRONMENTAL MANAGEMENT |
||||
|
|
) |
|
|
||||
|
|
) |
|
|||||
|
COMMISSIONER OF THE DEPARTMENT |
) |
|
|||||
|
OF
ENVIRONMENTAL MANAGEMENT, |
) |
|
|||||
|
|
) |
|
|||||
|
|
Complainant, |
) |
|
||||
|
|
) |
|
|||||
|
|
v. |
) |
Case
No. 2002-12004-S |
||||
|
|
) |
|
|||||
|
MARIE
E. HEINOLD, |
) |
|
|||||
|
|
) |
|
|||||
|
|
Respondent. |
) |
|
||||
NOTICE AND ORDER OF THE
COMMISSIONER OF THE
DEPARTMENT OF ENVIRONMENTAL
MANAGEMENT
|
VIA
CERTIFIED MAIL: |
VIA
CERTIFIED MAIL: |
|
|
|
|
Marie E. Heinold |
Harris, Welsh &
Luckmann |
|
|
Attn: Robert A. Welsh |
|
|
|
|
|
|
This Notice and Order of the Commissioner of the Department of
Environmental Management (“Order”) is issued against Marie E. Heinold
(“Respondent”) pursuant to IC 13-30-3-4, IC 13-30-3-10, and IC 13-30-3-11, and
is based on violation of an environmental rule found during an investigation
conducted by the Indiana Department of Environmental Management (“IDEM”). Specifically, the investigation, which included
a records review conducted on February 22, 2002, revealed that the Respondent
violated 327 IAC 2-6.1-7, 329 IAC 9-4-1(1), and 329 IAC 9-4-3(2)(A), as
specified below:
FINDINGS OF VIOLATION
1.
Complainant is the Commissioner (“Complainant”) of the Indiana
Department of Environmental Management, a department of the State of
2.
Respondent owned and/or owned and operated the underground
storage tank systems, Facility ID# 17743, located at
3.
IDEM has jurisdiction over the parties and the subject
matter of this action.
4.
All references to 329 IAC 9 and its various parts and
subparts in the “Findings of Violation” portion of this Order are to the
version in effect prior to the rule change effective September 29, 2004. All references to 329 IAC 9 and its various
parts and subparts in the “Order” portion of this Order are to the version
currently in effect.
5.
Pursuant to 329 IAC 9-4-3(2)(A), unless corrective action is
initiated in accordance with 329 IAC 9-5, the owner and operator shall
immediately investigate and confirm all suspected releases of regulated
substances requiring reporting under 329 IAC 9-4-1 within seven (7) days. The owner and operator shall measure for the
presence of a release where contamination is most likely to be present at the
underground storage tank site. If the test
results for the excavation zone or the underground storage tank site indicate
that a release has occurred, the owner and operator shall begin corrective
action in accordance with 329 IAC 9-5.
6.
An Initial Site Characterization of the Site dated September
24, 2001 was prepared for Respondent by SES Environmental and submitted to IDEM. This Initial Site Characterization indicated
that a release of petroleum fuel occurred at the Site and that the petroleum
release impacted soil and groundwater.
The Respondent failed to begin corrective action after a release was
confirmed by the September 24, 2001 Initial Site Characterization, in violation
of 329 IAC 9-4-3(2)(A).
7.
On March 31, 2003, a Notice of Violation was issued,
pursuant to IC 13-30-3-3 to the Respondent for the violations cited above. Respondent received this Notice of Violation on
or about April 3, 2003.
8.
The Notice of Violation contained an offer to enter into an
Agreed Order, in compliance with IC 13-30-3-3.
IDEM subsequently provided the Respondent with a proposed Agreed Order.
9.
More than sixty (60) days have elapsed since Respondent was
offered the opportunity to enter into an Agreed Order.
10.
The Respondent has not entered into an Agreed Order resolving
the violations cited above.
ORDER
1.
The Respondent shall, within thirty (30) days of the
Effective Date of this Order, submit a Further Site Investigation Plan (“FSIP”)
to IDEM setting forth in detail the actions Respondent shall take to complete a
Further Site Investigation that meets the requirements of 329 IAC 9-5-6. The
FSIP shall be subject to review, modification and approval by IDEM. The FSIP
must be approved by IDEM prior to implementation. In the event IDEM determines
that the FSIP submitted by Respondent is deficient or otherwise unacceptable,
Respondent shall revise and resubmit the FSIP to IDEM in accordance with IDEM's
notice. Upon notification of deficiencies in the FSIP, Respondent shall have
fifteen (15) days to revise and resubmit a FSIP to IDEM which addresses the
deficiencies. After three (3) submissions of the FSIP by Respondent, IDEM
may modify and approve any such FSIP and Respondent must implement the FSIP as
modified by IDEM. The approved FSIP shall be incorporated into this Order
and shall be deemed an enforceable part thereof.
2.
Upon IDEM approval of the FSIP, Respondent shall implement
the approved FSIP in accordance with the schedule contained therein and submit
the results of the Further Site Investigation to IDEM. Respondent shall submit
and implement additional Further Site Investigation Plans at IDEM’s request if
IDEM determines that further site investigation is needed to adequately
delineate the extent of contamination.
3.
The Respondent shall, within sixty (60) days of receiving
written notice from IDEM, submit a Corrective Action Plan (“CAP”) pursuant to
329 IAC 9-5-7 and a schedule for implementation thereof. The Respondent shall
utilize IDEM's UST Branch Guidance Manual October 1994 update to develop the
CAP. The CAP shall be subject to review, modification and approval by
IDEM. In the
event IDEM determines that the CAP submitted by Respondent is deficient or
otherwise unacceptable, Respondent shall revise and resubmit the CAP to IDEM in
accordance with IDEM’s notice. Upon
notification of deficiencies in the CAP, Respondent shall have fifteen (15) days
to revise and resubmit a CAP to IDEM which addresses the deficiencies. After three (3) submissions of the CAP by
Respondent, IDEM may modify and approve any such CAP and Respondent must
implement the CAP as modified by IDEM.
The approved CAP shall be incorporated into this Order and shall be
deemed an enforceable part thereof.
4.
Upon IDEM approval of the CAP, the Respondent shall
implement the approved CAP in accordance with the schedule contained
therein.
5.
Respondent shall permit an agent of IDEM to view and inspect
the activities performed pursuant to the approved FSIP and/or CAP. In order to
facilitate such an inspection, Respondent shall notify IDEM at least seven (7)
days prior to any scheduled activities.
6.
To the extent that the Site or other areas where work is to
be performed hereunder are owned or controlled by parties other than those
bound by this Order, Respondent is responsible for obtaining access to such
properties. Such access shall include
access for IDEM and authorized representatives of IDEM. In the event that access to the Site is not
obtained, Respondent shall so notify IDEM, which may at its discretion assist
Respondent in gaining access.
7.
All submittals required by this Order, unless notified
otherwise in writing, shall be sent to the following parties:
|
Steven
Carmer, Enforcement Case Manager |
|
Office
of Enforcement Mail Code 60-02 |
|
Indiana
Department of Environmental Management |
|
|
|
|
|
|
|
Craig
Schroer, Leaking Underground Section |
|
Office
of Land Quality Mail Code 67-18 |
|
Indiana
Department of Environmental Management |
|
|
|
|
8.
Respondent is assessed a civil penalty of Eight Thousand
Seven Hundred and Fifty Dollars ($8,750.00). Said penalty amount shall be remitted
to the Department of Environmental Management within thirty (30) days of the
effective date of this Order. Checks shall be made payable to Underground
Petroleum Storage Tank Trust Fund with the Case Number indicated on the check
and mailed to:
|
Indiana
Department of Environmental Management |
|
Cashiers
Office – Mail Code 50-10C |
|
|
|
|
9.
This Order shall apply to and be binding upon the
Respondent, her successors and assigns. No change in ownership, corporate, or
partnership status of the Respondent shall in any way alter its status or
responsibilities under this Order.
EFFECTIVE
DATE OF ORDER
Pursuant to IC 13-30-3-5,
this Order takes effect twenty (20) days following receipt unless you request
review of this Order, before the twentieth day after receipt, by filing a
written request for review with the Office of Environmental Adjudication, and
serving a copy of the request for review upon the Commissioner of the Indiana
Department of Environmental Management. You may request that the Office of
Environmental Adjudication conduct a hearing to review this Order, under IC
4-21.5, in its entirety, or you may limit your request for review to specific
findings and/or orders contained in this Order.
Requests for review must be submitted to the Office of Environmental
Adjudication and the Commissioner of the Indiana Department of Environmental
Management at the following addresses:
|
Director |
Commissioner |
|
|
Office of Environmental Adjudication |
IDEM |
|
|
|
|
|
|
|
100 North Senate |
|
|
|
|
|
Failure to properly submit
a request for review, before the twentieth day following receipt of this Order
of the Commissioner, waives your right to administrative review of this Order
and your right to judicial review of the Order.
The petition for administrative review must contain the following
information:
a.
Name, address, and telephone number of each person filing
the petition.
b.
Identification of the interest of each petitioner in the
subject of the petition.
c.
Statement of facts demonstrating that the petitioner is:
(A)
a person to whom the order is directed;
(B)
aggrieved or adversely affected by the order; or
(C)
entitled to review under any law.
d.
Statement with particularity of the legal issues proposed
for consideration in the proceedings.
The petition for
administrative review should also contain the following information:
a.
Identification of any persons represented by the person
making the request.
b.
Statement identifying the person against whom administrative
review is sought.
c.
A copy of the notice of the commissioner’s action issued by
the department of environmental management which is the basis of the petition
for administrative review.
d.
Statement indicating the identification of petitioner’s
attorney or other representative.
If you have procedural or
scheduling questions regarding your request for review you may contact the Office
of Environmental Adjudication at (317) 232-8591.
|
Dated at |
______ |
day of |
20____ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
**signed 4/5/2006** |
||
|
|
|
Thomas W. Easterly |
||
|
|
|
Commissioner |
||
|
|
|
|
|
|
|
cc: |
Lake County Health Department |
|||
|
|
Lake County Public file |
|||
|
|
http://www.in.gov/idem/ |
|||
|
|
Matt Klein, AC, IDEM-OCE,
IGCN, 13th Floor |
|||
|
|
Craig Schroer, Section Chief, IDEM-OLQ-LUST
Section, IGCN, 11th Floor |
|||
|
|
Thomas F. Newcomb, Case Manager, IDEM-OE-SW/UST
Section, IGCN, 13th Floor |
|||
|
|
Joe Hillier, Project Manager, IDEM-OLQ-LUST Section,
NW Regional office |
|||
|
|
Sandra Siler, Inspector, |
|||