AGREED ORDER

 

Complainant and Respondents desire to settle and compromise this action without hearing or adjudication of any issue of fact or law, and consent to the entry of the following Findings of Fact and Order. Pursuant to Indiana Code (“IC”) 13-30-3-3, entry into the terms of this Agreed Order does not constitute an admission of any violation contained herein. Respondents’ entry into this Agreed Order shall not constitute a waiver of any defense, legal or equitable, which Respondents may have in any future administrative or judicial proceeding, except a proceeding to enforce this order.

 

I.  FINDINGS OF FACT

 

1.            Complainant is the Commissioner (“Complainant”) of the Indiana Department of Environmental Management (“IDEM”), a department of the State of Indiana created by Indiana Code (“IC”) 13-13-1-1.

 

2.            Respondent KDA Properties IN LLC owns Underground Storage Tank (“UST”) systems, with UST Facility ID 11188, located at 221 E. Main Street parcel # 28-05-04-331-008.000-023, in Jasonville, Greene County, Indiana (the “Site”).

 

3.            Respondent Samir Patel operates the UST systems located at 221 E. Main Street parcel # 28-05-04-331-008.000-023, in Jasonville, Greene County, Indiana (the “Site”).

 

4.            Respondents own and operate three 12,000-gallon steel USTs installed in 1987.

 

5.            IDEM has jurisdiction over the parties and the subject matter of this action.

 

6.            Pursuant to IC 13-30-3-3, IDEM issued a Notice of Violation (“NOV”) on November 2, 2021via Certified Mail to:

 

c/o Kirit Patel, Member of

KDA Properties IN LLC

UST and Property Owner

8133 Brinegar Circle

Tampa, Florida 33647

ashpetroleum@gmail.com

friendlyporch@gmail.com

 

C T Corporation System, Registered Agent for

KDA Properties IN LLC

334 North Senate Avenue

Indianapolis, Indiana 46204

 

Samir Patel, UST Operator

7227 Blue Mesa Place

Indianapolis, Indiana 46259

Samirhp14@gmail.com

friendlyporch@gmail.com

 

7.         During an investigation including an inspection on November 24, 2020 conducted by a representative of IDEM, the following violations were found:

 

a.         Pursuant to 329 Indiana Administrative Code (“IAC”) 9-2-2(c), an owner required to submit a notification under this section shall provide:

(1)       a notification for each UST owned;

(2)       complete information required on the form for each UST owned; and

(3)       if applicable, a separate notification form for each separate place of operation at which the USTs are located.

 

As noted during the inspection, the last notification form submitted contained inaccurate information regarding the UST system installation date, UST system corrosion protection, UST system containment sumps and types of UST overfill prevention equipment in use.

 

A notification form indicating owner and operator change information was submitted November 30, 2021. Tank information is still needed.

 

b.         Pursuant to 329 IAC 9-8-11(b), an owner or operator of:

(1)       twelve (12) or fewer USTs shall demonstrate the ability to pay the applicable deductible amount under IC 13-23-9-1.3; or

(2)       more than twelve (12) USTs shall demonstrate the ability to pay two (2) times the applicable deductible amount under IC 13-23-9-1.3.

 

As noted during the inspection, Respondents failed to demonstrate a current financial responsibility mechanism.

 

c.            Pursuant to 329 IAC 9-8-21(c), an owner or operator that uses an assurance mechanism specified in sections 6 through 17 of this rule shall maintain an updated copy of a certification of financial responsibility.

 

As noted during the inspection, an updated certificate of financial responsibility was not provided.

 

d.         Pursuant to 40 Code of Federal Regulations (“CFR”) 280.20(c)(1)(i), to prevent spilling and overfilling associated with product transfer to the UST system, owners and operators must use the following spill and overfill prevention equipment:

(i)         Spill prevention equipment that will prevent release of product to the environment when the transfer hose is detached from the fill pipe (for example, a spill catchment basin).

 

As noted during the inspection, all catchment basins contained liquid and/or debris to such an extent that a spill may not be prevented if any product were to enter any of the catchment basins.

 

Documentation dated December 18, 2021 that liquid and/or debris removed from all catchment basins submitted.

 

e.         Pursuant to 40 CFR 280.20(c)(1)(ii), to prevent spilling and overfilling associated with product transfer to the UST system, owners and operators must use the following spill and overfill prevention equipment:

(ii)        Overfill prevention equipment that will:

(A)       Automatically shut off flow into the tank when the tank is no more than 95 percent full; or

(B)       Alert the transfer operator when the tank is no more than 90 percent full by restricting the flow into the tank or triggering a high-level alarm; or

(C)       Restrict flow 30 minutes prior to overfilling, alert the transfer operator with a high-level alarm one minute before overfilling, or automatically shut off flow into the tank so that none of the fittings located on top of the tank are exposed to product due to overfilling.

 

As noted during the inspection, previously submitted documentation indicated that each UST was equipped with a ball float valve, but auto shutoff devices were observed on the two regular gasoline UST fill pipes.

 

Documentation dated January 4, 2022 that video inspection concluded that no ball float valves present, and automatic shutoff devices present in all coaxial drop tubes.

 

f.          Pursuant to 40 CFR 280.31(a), all corrosion protection systems must be operated and maintained to continuously provide corrosion protection to the metal components of that portion of the tank and piping that routinely contain regulated substances and are in contact with the ground.

 

As noted during the inspection, metal UST pump and/or piping components inside the UST STP sump pits and under the fuel dispensers were not protected from corrosion due to presence of water in all STP sump pits. The corrosion protection system for the fuel dispensers were also not being properly connected to the metal piping under the fuel dispensers.

 

g.         Pursuant to 40 CFR 280.31(b), all UST systems equipped with cathodic protection systems must be inspected for proper operation by a qualified cathodic protection tester in accordance with the following requirements:

(1)       Frequency. All cathodic protection systems must be tested within 6 months of installation and at least every 3 years thereafter or according to another reasonable time frame established by the implementing agency; and

(2)       Inspection criteria. The criteria that are used to determine that cathodic protection is adequate as required by this section must be in accordance with a code of practice developed by a nationally recognized association.

 

As noted during the inspection, current test results for the impressed current cathodic protection system were not provided.

 

h.         Pursuant to 40 CFR 280.31(c), UST systems with impressed current cathodic protection systems must also be inspected every 60 days to ensure the equipment is running properly.

 

            As noted during the inspection, Respondents failed to inspect the impressed current cathodic protection system as required.

 

i.          Pursuant to 40 CFR 280.43(d), equipment for automatic tank gauging that tests for the loss of product and conducts inventory control must meet the following requirements:

(1)       The automatic product level monitor test can detect a 0.2 gallon per hour leak rate from any portion of the tank that routinely contains product;

(2)       The automatic tank gauging equipment must meet the inventory control (or other test of equivalent performance) requirements of § 280.43(a); and

(3)       The test must be performed with the system operating in one of the following modes:

(i)         In-tank static testing conducted at least once every 30 days; or

(ii)        Continuous in-tank leak detection operating on an uninterrupted basis or operating within a process that allows the system to gather incremental measurements to determine the leak status of the tank at least once every 30 days.

 

As noted during the inspection, the ATG was indicating an alarm for a protective cover as well as other previous alarms including invalid fuel levels in both regular unleaded USTs. The ATG also was not providing any current inventory or release detection monitoring data for the diesel fuel UST.

 

The diesel UST contained less than one inch of product and therefore is not required to have release detection. Documentation dated December 18, 2021 that the ATG was reprogrammed submitted.

 

8.         Orders of the Commissioner are subject to administrative review by the Office of Environmental Adjudication under IC 4-21.5; however, in recognition of the settlement reached, Respondents acknowledge notice of this right and waive any right to administrative and judicial review of this Agreed Order.

 

II.  ORDER

 

1.            This Agreed Order shall be effective (“Effective Date”) when it is approved by Complainant or Complainant’s delegate and has been received by Respondents. This Agreed Order shall have no force or effect until the Effective Date.

 

2.            Respondents shall comply with the rules listed in the findings of fact above.

 

3.            Within thirty (30) days of the Effective Date, Respondents shall comply with 329 IAC 9-2-2(c). Specifically, Respondent shall download and submit the “Notification Form for Underground Storage Tanks,” State Form 45223 from IDEM webpage: https://www.in.gov/idem/5157.htm, under “Underground Storage Tank (UST) Program.” Once downloaded the form may be completed on-line or by hand and emailed to USTRegistration@idem.in.gov. The completed form will not be accepted by mail.

 

4.            Within thirty (30) days of the Effective Date, Respondents shall comply with 329 IAC 9-8-11(b) and 329 IAC 9-8-21(c). Specifically, Respondents shall submit documentation of certification of financial responsibility to IDEM.

 

5.            Within thirty (30) days of the Effective Date, Respondents shall comply with 40 CFR 280.31(a). Specifically, Respondents shall contract with a certified contractor to inspect all metal pump and piping components inside the STP sump pits and fuel dispensers for corrosion damage and replace as necessary and submit documentation including photographs to IDEM.

 

6.            Within thirty (30) days of the Effective Date, Respondents shall comply with 40 CFR 280.31(b). Specifically, Respondents shall contract with a qualified cathodic protection tester and have the UST systems fully inspected and submit the results to IDEM.

 

7.            Effective immediately, Respondents shall comply with 40 CFR 280.31(c). Specifically, Respondents shall maintain 60-day rectifier logs.

 

8.            All submittals required by this Agreed Order, unless Respondent is notified otherwise in writing by IDEM, shall be sent to:

 

Jodi Pisula, Enforcement Case Manager

Office of Land Quality

Indiana Department of Environmental Management

100 North Senate Avenue

Indianapolis, IN 46204-2251

 

9.            Pursuant to IC 13-30-4-1, Respondents are assessed and agree to pay a civil penalty of Twenty-Four Thousand Four Hundred Eighty Dollars ($24,480.00) for which Respondents are jointly and severally liable. Said penalty amount shall be due and payable in twelve (12) monthly installments of Two Thousand Forty Dollars ($2,040.00). Respondents shall pay the first installment by the due date printed on the Invoice, as attached. Respondents shall pay by the due date printed on any subsequent invoices in accordance with the agreed upon payment plan.

 

Civil and stipulated penalties are payable to the “Environmental Management Special Fund” by:

 

Mail:

Civil penalties are payable by check to the “Environmental Management Special Fund” [or “Underground Petroleum Storage Tank Trust Fund”. Checks shall include the Case Number of this action and shall be mailed to:

 

Indiana Department of Environmental Management

Accounts Receivable

IGCN, Room 1340

100 North Senate Avenue

Indianapolis, IN 46204

 

Online:

Accounts Receivable is accepting payments online by e-Check, Master Card, Visa or Discover. Please visit www.IN.gov/IDEM. Under Online Services, click Online Payment options and follow the prompts. A processing fee of $1 plus 1.99% will be charged for credit card payments. A processing fee of $1.00 will be charged for eCheck payments.

 

The Case Number is required to complete the process.

 

Phone:

You may also call us at 317-234-3099 and follow the instructions for Master Card, Visa or Discover payments. A processing fee of $1 plus 1.99% will be charged for credit card payments. A processing fee of $1.00 will be charged for eCheck payments.

 

The Case Number is required to complete the process.

 

10.         In the event the terms and conditions of the following paragraphs are violated, Complainant may assess, and Respondent shall pay a stipulated penalty in the following amount:

 

Paragraph

Penalty

Order paragraph #3

$100.00 per week

Order paragraph #4

$100.00 per week

Order paragraph #5

$100.00 per week

Order paragraph #6

$100.00 per week

Order paragraph #7

$100.00 per week

 

11.         Stipulated penalties shall be due and payable no later than the 30th day after Respondents receive written notice that Complainant has determined a stipulated penalty is due; the 30th day being the “Due Date.” Complainant may notify Respondents at any time that a stipulated penalty is due. Failure to notify Respondents in writing in a timely manner of stipulated penalty assessment shall not waive Complainant’s right to collect such stipulated penalty or preclude Complainant from seeking additional relief against Respondents for violation of this Agreed Order. Neither assessment nor payment of stipulated penalties shall preclude Complainant from seeking additional relief against Respondents for a violation of this Agreed Order; such additional relief includes any remedies or sanctions available pursuant to Indiana law, including, but not limited to, civil penalties pursuant to IC 13-30-4. Respondents are jointly and severally liable for all stipulated penalty assessments.

 

12.         In the event that the monies due to IDEM pursuant to this Agreed Order are not paid on or before their Due Date, Respondents shall pay an additional penalty of 10 percent, payable to the “Underground Petroleum Storage Tank Trust Fund” and shall be payable to IDEM in the manner specified in Paragraph 9 above.

 

13.         Signatories to this Agreed Order certify that they are fully authorized to execute this Agreed Order and legally bind the party they represent.

 

14.         This Agreed Order shall jointly and severally apply to and be binding upon Respondents and all successors and assigns. Respondents shall provide a copy of this Agreed Order, if in force, to any subsequent owners, successors, or assigns before ownership rights are transferred.

 

15.         No change in ownership, corporate, or partnership status of Respondents shall in any way alter the Respondents’ status or responsibilities under this Agreed Order.

 

16.         Respondents shall ensure that all contractors, firms, and other persons performing work under this Agreed Order comply with the terms of this Agreed Order.

 

17.         In the event that any terms of this Agreed Order are found to be invalid, the remaining terms shall remain in full force and effect and shall be construed and enforced as if this Agreed Order did not contain the invalid terms.

 

18.         This Agreed Order is not and shall not be interpreted to be a permit or a modification of an existing permit. This Agreed Order, and IDEM’s review or approval of any submittal made by Respondents pursuant to this Agreed Order, shall not in any way relieve Respondents of the obligation to comply with the requirements of any applicable permits or any applicable Federal or State laws or regulations.

 

19.         Complainant does not, by its approval of this Agreed Order, warrant or aver in any manner that Respondents’ compliance with any aspect of this Agreed Order will result in compliance with the provisions of any permit, order, or any applicable Federal or State law or regulation. Additionally, IDEM or anyone acting on its behalf shall not be held liable for any costs or penalties Respondents may incur as a result of Respondents’ efforts to comply with this Agreed Order.

 

20.         Nothing in this Agreed Order shall prevent or limit IDEM’s rights to obtain penalties or injunctive relief under any applicable Federal or State law or regulation, except that IDEM may not, and hereby waives its right to seek additional civil penalties for the violations specified in the NOV.

 

21.         Nothing in this Agreed Order shall prevent IDEM or anyone acting on its behalf from communicating with the U.S. Environmental Protection Agency (U.S. EPA) or any other agency or entity about any matters relating to this enforcement action. IDEM or anyone acting on its behalf shall not be held liable for any costs or penalties Respondents may incur as a result of such communications with the U.S. EPA or any other agency or entity.

 

22.         This Agreed Order shall remain in effect until IDEM issues a Resolution of Case letter to Respondents.

 

TECHNICAL RECOMMENDATION:

RESPONDENT:

Department of Environmental Management

KDA Properties IN LLC

 

By: ___________

By:_________________________

 

Jennifer Reno, Section Chief

 

 

Land Enforcement Section

Printed: ______________________

Office of Land Quality

 

 

Title: ________________________

 

 

Date: ________________

Date: _______________________

 

 

 

 

 

COUNSEL FOR RESPONDENT:

 

 

 

 

 

By: ________________________

 

 

 

 

 

 

Date: ______________________

 

 

RESPONDENT:

 

Samir Patel

 

 

 

By:  _________________________

 

 

 

 

 

Printed: ______________________

 

 

 

Title: ________________________

 

 

 

Date: _______________________

 

 

 

 

 

COUNSEL FOR RESPONDENT:

 

 

 

 

 

By: ________________________

 

 

 

 

 

 

Date: ______________________

 

APPROVED AND ADOPTED BY THE INDIANA DEPARTMENT OF ENVIRONMENTAL

MANAGEMENT THIS

_________

DAY OF

________________________,

20__.

 

 

For the Commissioner:

 

 

 

Signed on 03/23/22_____________

 

Peggy Dorsey, Assistant Commissioner

 