AGREED ORDER
Complainant
and Respondent desire to settle and compromise this action without hearing or
adjudication of any issue of fact or law, and consent to the entry of the following
Findings of Fact and Order. Pursuant to IC 13-30-3-3, entry into the terms of
this Agreed Order does not constitute an admission of any violation contained
herein. Respondent's entry into this
Agreed Order shall not constitute a waiver of any defense, legal or equitable,
which Respondent may have in any future administrative or judicial proceeding,
except a proceeding to enforce this order.
I. FINDINGS OF FACT
1.
Complainant is the Commissioner (“Complainant”) of the
Indiana Department of Environmental Management (“IDEM”), a department of the
State of
2.
Respondent is Utility Center, Inc. (“Respondent”), which
owns and operates a major semi-public wastewater treatment plant located at
9741 Woodland Ridge East,
3.
Respondent is authorized by National Pollutant Discharge
Elimination System (“NPDES”) Permit Number IN 0035378 (the "Permit")
to discharge wastewater treated in accordance with the terms and conditions of
the NPDES Permit from the outfall identified in Part I of the Permit to
receiving waters named Graham McCulloch Ditch in accordance with the effluent
limitations, monitoring requirements, and other conditions set forth in the
Permit. Respondent's collection system consists of 100% separate sanitary
sewers by design.
4.
IDEM has jurisdiction over the parties and the subject
matter of this action.
5.
Pursuant to IC 13-30-3-3, IDEM issued a Notice of Violation (“NOV”)
on March 17, 2010, via Certified Mail to:
|
Utility
Center, Inc. |
and to: |
Utility
Center, Inc. |
|
Nicholas DeBenedictis,
Director |
|
Corporation
Service Company |
|
762 |
|
|
|
|
|
|
6.
Pursuant to 327 IAC 5-2-2, any discharge of pollutants into
the waters of the state as a point source discharge, except for exclusions made
in 327 IAC 5-2-4, is prohibited unless in conformity with a valid NPDES permit
obtained prior to the discharge.
Pursuant to IC 13-30-2-1, a person may
not discharge, emit, cause, allow, or threaten to discharge, emit, cause, or
allow any contaminant or waste, including any noxious odor either alone or in
combination with contaminants from other sources, into the environment in any
form that causes or would cause pollution that violates or would violate rules,
standards, or discharge or emission requirements adopted by the appropriate
board under the environmental management laws.
Pursuant to 327 IAC 5-2-8(1) and Part
II.A.1 of the Permit, Respondent is required to comply with all terms and
conditions of its Permit. Any permit
noncompliance constitutes a violation of the Clean Water Act (CWA) and IC 13
and is grounds for enforcement action.
Pursuant to Attachment A of the Permit,
overflows in the sanitary sewer system or in a sanitary portion of a combined
sewer system are expressly prohibited from discharging at any time. Should any release from the sanitary sewer
system occur, Respondent is required to notify IDEM orally within 24 hours and
in writing within 5 days of the event in accordance with the requirements in
Part II.C.3. of the Permit. The
correspondence shall include the duration and cause of discharge as well as the
remedial action taken to eliminate it.
The overflow duration and estimate flow shall also be reported in the
Monthly Report of Operation (MRO) form.
7.
A record review of MROs and overflow
incident reports submitted by Respondent from March 1, 2007 through December
31, 2009, indicate that Respondent has reported that SSOs from Respondent's
sanitary sewer system occurred on 27 days from March 1 through December 31, 2007,
29 days during 2008, and 22 days during 2009.
These prohibited overflows were in violation of Attachment A of the
Permit, 327 IAC 5-2-8(1) and Part II.A.1 of the Permit, 327 IAC 5-2-2, and therefore
violated IC 13-30-2-1.
8.
"Sanitary Sewer Overflow" or
"SSO", for the purposes of this Agreed Order, shall mean an overflow,
spill, release, or diversion of wastewater from a sanitary sewer system. SSO's include, but are not limited to: (1) overflows or releases of wastewater that
reach waters of the State; and (2) overflows or released of wastewater that do
not reach waters of the State. For
purpose of this Agreed Order, notwithstanding the MRO reporting requirements as
promulgated, each SSO shall constitute a single event regardless of time or
duration such that two (2) separate events occurring in a single day shall
constitute two (2) SSOs; or, one (1) single event occurring prior to and
continuing past 12 o'clock midnight shall constitute one (1) SSO.
9.
Respondent has indicated that certain SSO
events were caused by intervening acts of third parties and not the result of
or caused by any action or maintenance issues by Respondent or its system. Respondent has also indicated that Respondent
has diligently undertaken to determine the cause of and repair or otherwise
mitigate those SSO events to date, including but not limited to: a) Repairing controls on the WTP pump
station; b) Replacing pumps in December of 2007 and January of 2008; c)
Replacing force main in January of 2009; d) Sewer re-lining in 2009; e) Noting
specific areas for increased maintenance; f) Rebuilding a manhole in November
of 2008; g) Replacing alarm backup system; h) Purchase and installation of a
new generator for a pump station; i) Replacing Roto Phase, rewiring generator
connection in June of 2009; j) Rebuilding pumps in June 2009; and k) Changing
WTP controls, recycle of back wash water.
10.
Pursuant to 327 IAC 5-2-8(8) and Part
II.B.1 of the Permit, Respondent is required to, at all times, maintain in good
working order and efficiently operate all facilities and systems (and related
appurtenances) for collection and treatment that are: (1) installed or used by Respondent; and (2)
necessary for achieving compliance with the terms and conditions of the Permit.
During an inspection conducted at the Site
by IDEM staff on July 9, 2008, it was noted by IDEM staff that the overall
plant is well operated and maintained, however the maintenance of the
collection system was evaluated as unsatisfactory due to the SSOs. IDEM staff noted that the collection system
maintenance needed to be addressed to reduce the number of SSOs.
During an inspection conducted at the Site
by IDEM staff on December 17 and 21, 2009, it was noted by IDEM staff that the
sanitary sewer overflows and the maintenance were unsatisfactory because of: A) the SSOs; B) records indicative of inflow
and infiltration (I&I) of storm water and ground water into the sanitary
sewers; and C) a need for improved maintenance to prevent some of the sanitary
sewer overflows.
Failure to maintain in good working order
and to efficiently operate a collection system is in violation of 327 IAC
5-2-8(8) and Part II.B.1 of the Permit, and 327 IAC 5-2-8(1) and Part II.A.1 of
the Permit.
11.
In recognition of the settlement reached, Respondent waives
any right to administrative and judicial review of this Agreed Order.
II. ORDER
1.
This Agreed Order shall be effective (“Effective Date”) when
it is approved by Complainant or Complainant’s delegate, and has been received
by Respondent. This Agreed Order shall
have no force or effect until the Effective Date.
2.
Upon the Effective Date, this Agreed Order shall supersede
and replace in its entirety all previous Agreed Orders between the parties and
all previous deadlines, submissions compliance or other plans.
3.
Respondent shall comply with statutes, rules, and/or permit
conditions or listed in the findings here and/or above at issue.
4.
Within 60 days of the Effective Date of this Agreed Order,
the Respondent shall develop and submit to IDEM for approval a Compliance Plan
(CP) which identifies actions that Respondent will take to evaluate and
implement means to cease all unpermitted sewer overflows from its collection
system. The CP shall include an
implementation and completion schedule, including specific milestone dates. Upon completion of the actions required by the
CP, the Respondent shall be subject to stipulated penalties, as specified
below, for unpermitted sewer overflows from its collection system.
5.
As part of its CP, Respondent shall review and update as
necessary its Wastewater Sewer Collection System Operation & Maintenance
Program guidance ("O&M Program") to ensure that it is adequate
and is being implemented.
6.
Respondent shall, within six months of completion of the work
required pursuant to the Compliance Plan under Paragraph 4 above, demonstrate
six consecutive months of compliance (Compliance Demonstration) with no
unpermitted sewer overflows from its collection system. Respondent may submit to IDEM, for review and
approval, a written request to terminate the Compliance Demonstration early,
provided that the following conditions are satisfied: Respondent demonstrates for at least 3
consecutive months, commencing upon the completion of the work required pursuant
to the Compliance Plan, with no unpermited sewer overflows from its collection
system, and Respondent demonstrates that the adequacy of the Compliance Plan
has been sufficiently tested by documenting, for example, that a wide range of
storm events has occurred.
In the event that Respondent fails to
make the Compliance Demonstration, Respondent shall, within sixty days of becoming
aware that the Compliance Demonstration cannot be achieved, develop and submit
to IDEM, for approval, an Additional Action Plan which identifies the
additional actions that Respondent will take to cease unpermitted sewer
overflows from its collection system.
The Additional Action Plan, if required, shall include an implementation
and completion schedule, including specific milestone dates.
7.
The plans required by Paragraphs 4 and 6 above are subject
to IDEM approval. In the event IDEM
determines that any plan submitted by Respondent is deficient or otherwise
unacceptable, Respondent shall revise and resubmit the plan to IDEM in
accordance with IDEM’s notice. After three submissions of such plan by
Respondent, IDEM may take additional enforcement action against Respondent.
Respondent, upon receipt of written
notification and approval from IDEM, shall immediately implement the approved
plan and adhere to the milestone dates therein.
The approved CP and any Additional Action Plan shall be incorporated
into the Agreed Order and shall be deemed an enforceable part thereof. Failure by Respondent to submit any plan by
the specified date, or to meet any of the milestones in the approved plan will
subject the Respondent to stipulated penalties as described below. Failure to cease unpermitted sewer overflows
from the Respondent's collection system at the conclusion of work under an
Additional Action Plan will subject Respondent to additional enforcement
action.
8.
Beginning on the Effective Date and continuing until the successful
completion of the CP provided for by Paragraph 4 above, and if required, the
Additional Action Plan provided for by Paragraph 6, Respondent shall, at all
times, operate its POTW (including the collection system and lift stations) as
efficiently and effectively as possible, and shall be subject to stipulated
penalties for its failure to comply with the overflow monitoring requirements,
overflow response requirements, and overflow reporting requirements of the
Permit and 327 IAC 2-6.1.
9.
Beginning on the Effective Date, the Respondent shall undertake
inspection of all locations in the sanitary sewer collection system that are
known to have had unpermitted sewer overflows during and/or after precipitation
events since March 2001 in order to determine whether discharges from these
points occur. Respondent shall document
its inspections by recording the following:
a.
the date and time of the inspection;
b.
the name of the person(s) conducting the
inspection;
c.
the date the precipitation event began;
d.
the time the precipitation event began and, for
inspections conducted after the precipitation event, the time the precipitation
event ended, and the volume of the precipitation event;
e.
the particular overflow point being inspected;
f.
the appearance of the overflow point, and the
surrounding area, specifically noting whether a discharge event from the
overflow point occurred, is occurring, or is about to occur; and
g.
the remedial measures taken in the event that a
discharge from the overflow point is found to have occurred, to be occurring,
or about to occur.
Respondent shall retain copies of the
required documentation and shall allow IDEM representatives to inspect and copy
these records upon request.
10.
Beginning on the Effective Date, in the event that a known discharge
from any unpermitted sewer overflow from the wastewater collection system
occurs, Respondent shall:
a.
take all reasonable actions to cease the discharge as soon
as possible;
b.
properly clean the affected area;
c.
remove and properly dispose of sewage and debris from the
affected area;
d.
report the discharge event to IDEM as required by the Permit,
including reporting the "Actions Taking to Prevent, Minimize, or Mitigate
Damage" and "Actions Taken or Planned to Prevent Recurrence" on
the Bypass/Overflow Incident Reports; and
e.
document all actions taken to cease the discharge and to
remediate the affected areas, retain copies of the documentation, and allow
IDEM representatives to inspect and copy these records upon request.
11.
All submittals required by this Agreed Order, unless
Respondent is notified otherwise in writing by IDEM, shall be sent to:
|
Terry Ressler, Enforcement Case
Manager |
|
Indiana Department of Environmental
Management |
|
Office of Water Quality – Mail Code 60-02W |
|
|
|
|
12.
Respondent is assessed a civil penalty of Twenty-Five Thousand
Dollars ($25,000). Within thirty days of
the Effective Date of the Agreed Order, Respondent shall pay a portion of this
penalty in the amount of $5,000. Said
penalty amount shall be due and payable to the Environmental Management Special
Fund. In lieu of payment of the
remaining civil penalty, Respondent shall perform and complete a Supplemental
Environmental Project (SEP). Respondent
estimates that this SEP will cost $40,000.
Within 30 days of completing this SEP, Respondent shall submit written
notice and documentation to IDEM which substantiates all actions taken and
costs incurred with respect to the SEP.
In the event that the cost of the SEP is less than $40,000, Respondent
shall pay 50% of the difference between the proposed cost of the SEP ($40,000) and
the actual cost of the SEP.
As a Supplemental Environmental Project,
the Septic Tank Elimination Program submitted by Respondent on July 26, 2010,
Respondent shall offer capital assistance for sewer main extensions to
residents in Respondent's territorial authority who have failing septic systems
and petition of Respondent for sewer service.
Respondent will offer $1,500 in capital assistance for each property
owner that submits written request for a sewer extension for up to 30 property
owners. Respondent shall complete the
SEP by no later than 5 years from the Effective Date of this Order. Implementation of this SEP will assist in providing
sanitary sewer service to up to 30 properties, and eliminate pollution caused
by the properties' failing septic systems.
In the event that Respondent does not end
up providing assistance to 30 property owners within 5 years from the Effective
Date of the Order, the full amount of the civil penalty as stated above, plus
interest established by IC 24-4.6-1-101 on the remaining amount, less the
portion of the civil penalty Respondent has already paid, will be due within
fifteen days from Respondent's receipt of IDEM’s notice to pay. Interest, at the rate established by IC
24-4.6-1-101, shall be calculated on the amount due from the date which is
thirty days after the Effective Date until the full civil penalty is paid.
13.
In the event the terms and conditions of the following
paragraphs are violated, Complainant may assess and Respondent shall pay a
stipulated penalty in the following amount:
|
Paragraph Number |
Violation
|
Penalty Amount |
|
4,7 |
Failure
to submit the CP within 60 days of the Effective Date, or modify the CP, as
required, within the given time period. |
$500
per each week late or part thereof |
|
5 |
Failure
to review and update as necessary the O&M Program to ensure that it is
adequate and is being implemented, as part of the CP. |
$500
per each week late or part thereof |
|
4 |
For
unpermitted sewer overflows after completion of the actions in the approved
Compliance Plan. |
$500
per unpermitted sewer overflow |
|
6,7 |
Failure
to submit an Additional Action plan within 60 days of becoming aware that the
Compliance Demonstration cannot be achieved, or to modify the Additional
Action Plan, if required, within the given time period. |
$500
per each week late or part thereof |
|
7 |
Failure
to meet any milestone date set forth in the approved CP or Additional Action
Plan. |
$500
per each week or part thereof |
|
8 |
Failure
to comply with the overflow monitoring, response, or reporting requirements
of 327 IAC 2-6.1. |
$500
per violation |
|
9 |
Failure
to inspect overflow points during and/or after precipitation events, failure
to document the inspections by recording the required information, and/or
failure to retain copies of the required documentation and allow inspection
of these records upon request. |
$500
per violation |
|
10 |
In
the event of an unpermitted discharge, failure to respond as required. |
$500
per violation |
14.
Stipulated penalties shall be due and payable within 30 days
after Respondent receives written notice that Complainant has determined a
stipulated penalty is due. Assessment
and payment of stipulated penalties shall not preclude Complainant from seeking
any additional relief against Respondent for violation of this Agreed
Order. In lieu of any of the stipulated penalties
set out above, Complainant may seek any other remedies or sanctions available
by virtue of Respondent’s violation of this Agreed Order or Indiana law,
including, but not limited to, civil penalties pursuant to IC 13-30-4.
15.
Civil and stipulated penalties are payable by check to the “Environmental
Management Special Fund.” Checks shall
include the Case Number of this action and shall be mailed to:
|
Indiana Department of Environmental
Management |
|
Cashier – Mail Code 50-10C |
|
|
|
|
16.
Force majeure, for purposes of this Agreed Order, is defined
as any event arising from causes totally beyond the control and without fault
of Respondent that delays or prevents the performance of any obligation under
this Agreed Order despite Respondent’s best efforts to fulfill the
obligation. The requirement that
Respondent exercise “best efforts to fulfill the obligation” includes using
best efforts to anticipate any potential force majeure event and best efforts
to address the effects of any potential force majeure event (1) as it is
occurring and (2) following the potential force majeure event, such that the
delay is minimized to the greatest extent possible. Force majeure does not include (1) changed
business or economic conditions; (2) financial inability to complete the work
required by this Agreed Order; or (3) increases in costs to perform the work.
Respondent shall notify IDEM by calling
the case manager within three (3) calendar days and by writing no later than
seven (7) calendar days after it has knowledge of any event which Respondent
contends is a force majeure. Such
notification shall describe (1) the anticipated length of the delay; (2) the
cause or causes of the delay; (3) the measures taken or to be taken by
Respondent to minimize the delay; and (4) the timetable by which these measures
will be implemented. Respondent shall
include with any notice all available documentation supporting its claim that
the delay was attributable to a force majeure.
Failure to comply with the above requirements shall preclude Respondent
from asserting any claim of force majeure for that event. Respondent shall have
the burden of demonstrating that the event is a force majeure. The decision of whether an event is a force
majeure shall be made by IDEM.
Within forty-five (45) days of
receiving Respondent's notice of a delay or impediment to performance, IDEM
shall notify Respondent in writing of whether IDEM agrees with Respondent's
claim of force majeure, if any. If IDEM
agrees that the delay or failure of performance has been or will be caused
entirely by circumstances beyond the control of Respondent or any entity
controlled by Respondent, including Respondent's consultants and
contractors: 1) the time for performance
of such requirement shall be extended for a period not to exceed that actual
delay resulting from such circumstance,
and stipulated penalties shall not be due for said delay; or 2) the performance
of such requirement may be excused by agreement of both parties, whichever may
be applicable.
17.
This Agreed Order shall apply to and be binding upon
Respondent and its successors and assigns.
Respondent’s signatories to this Agreed Order certify that they are
fully authorized to execute this Agreed Order and legally bind the party they
represent. No change in ownership,
corporate, or partnership status of Respondent shall in any way alter its
status or responsibilities under this Agreed Order.
18.
In the event that any terms of this Agreed Order are found
to be invalid, the remaining terms shall remain in full force and effect and
shall be construed and enforced as if this Agreed Order did not contain the
invalid terms.
19.
Respondent shall provide a copy of this Agreed Order, if in
force, to any subsequent owners or successors before ownership rights are
transferred. Respondent shall ensure
that all contractors, firms and other persons performing work under this Agreed
Order comply with the terms of this Agreed Order.
20.
This Agreed Order is not and shall not be interpreted to be
a permit or a modification of an existing permit. This Agreed Order, and IDEM’s review or
approval of any submittal made by Respondent pursuant to this Agreed Order,
shall not in any way relieve Respondent of its obligation to comply with the
requirements of its applicable permits or any applicable Federal or State law
or regulation.
21.
Complainant does not, by its approval of this Agreed Order,
warrant or aver in any manner that Respondent’s compliance with any aspect of
this Agreed Order will result in compliance with the provisions of any permit,
order, or any applicable Federal or State law or regulation. Additionally, IDEM or anyone acting on its
behalf shall not be held liable for any costs or penalties Respondent may incur
as a result of Respondent’s efforts to comply with this Agreed Order.
22.
Nothing in this Agreed Order shall prevent or limit IDEM’s
rights to obtain penalties or injunctive relief under any applicable Federal or
State law or regulation, except that IDEM may not, and hereby waives its right
to, seek additional civil penalties for the same violations specified in the
NOV.
23.
Nothing in this Agreed Order shall prevent IDEM [or anyone
acting on its behalf] from communicating with the EPA or any other agency or
entity about any matters relating to this enforcement action. IDEM or anyone acting on its behalf shall not
be held liable for any costs or penalties Respondent may incur as a result of
such communications with the EPA or any other agency or entity.
24.
This Agreed Order shall remain in effect until Respondent
has complied with all terms and conditions of Order Paragraph Nos. 4 through 15
and IDEM issues a Resolution of Case letter.
|
TECHNICAL
RECOMMENDATION: |
RESPONDENT: |
||||||
|
Department
of Environmental Management |
Utility
Center, Inc. |
||||||
|
|
|
||||||
|
By:________________________ |
By:________________________ |
||||||
|
|
Mark
W. Stanifer, Chief |
|
|||||
|
|
Water Enforcement Section |
|
|||||
|
Office
of Water Quality |
|
||||||
|
|
|
||||||
|
Date:__________________ |
Date:_______________________ |
||||||
|
|
|
||||||
|
COUNSEL
FOR COMPLAINANT: |
COUNSEL
FOR RESPONDENT: |
||||||
|
For
the Department of Environmental Management |
|
||||||
|
|
|
||||||
|
By:____________________ |
By:______________________ |
||||||
|
|
|
|
|||||
|
|
|
||||||
|
Date:_______________________ |
Date:______________________ |
||||||
|
|
|||||||
|
APPROVED
AND ADOPTED BY THE INDIANA DEPARTMENT OF ENVIRONMENTAL |
|||||||
|
MANAGEMENT THIS |
______ |
DAY OF |
________________________ |
, 200 |
___ |
. |
|
|
|
|||||||
|
|
For
the Commissioner: |
||||||
|
|
|
||||||
|
|
Signed
on September 1, 2010 |
||||||
|
|
Bruno Pigott |
||||||
|
|
Assistant
Commissioner |
||||||
|
|
Office
of Water Quality |
||||||