AGREED ORDER

 

Complainant and Respondent desire to settle and compromise this action without hearing or adjudication of any issue of fact or law, and consent to the entry of the following Findings of Fact and Order.  Pursuant to IC 13-30-3-3, entry into the terms of this Agreed Order does not constitute an admission of any violation contained herein.  Respondent's entry into this Agreed Order shall not constitute a waiver of any defense, legal or equitable, which Respondent may have in any future administrative or judicial proceeding, except a proceeding to enforce this order.

 

I.  FINDINGS OF FACT

 

1.                  Complainant is the Commissioner (“Complainant”) of the Indiana Department of Environmental Management (“IDEM”), a department of the State of Indiana created by Indiana Code (“IC”) 13-13-1-1.

 

2.                  Respondent is TDY Industries, Inc. d.b.a. Casting Service (“Respondent”), which owns and/or operates the facility with United States Environmental Protection Agency (“EPA”) ID No. IND005106703, located at County Road 150 East, in La Porte, La Porte County, Indiana (“Site”).

 

3.                  IDEM has jurisdiction over the parties and the subject matter of this action.

 

4.                  Pursuant to IC 13-30-3-3, on December 11, 2009, IDEM issued a Notice of Violation (NOV) via Certified Mail to:

 

L. Patrick Hassey, President

CT Corporation System

TDY Industries, Inc. d.b.a. Casting Service

Registered Agent

C/O Allegheny Technologies

TDY Industries, Inc.

1000 Six PPG Place

251 East Ohio Street, Suite 1100

Pittsburgh, PA 15222

Indianapolis, IN 46204

 

5.                  Respondent owns and operates an iron casting facility.

 

6.                  On October 27, 2006, Respondent was issued a Solid Waste Facility Permit 46-08, for a Restricted Waste Site Type I landfill (“RWS”), located  along County Road 150 East, approximately 1.25 miles north of State Road 2, in LaPorte, LaPorte County, Indiana.

 

7.                  During an investigation including inspections performed on March 28, 2008, June 19, 2008, September 30, 2008, October 28, 2008, March 30, 2009, and June 29, 2009 conducted by a representative of IDEM, the following violations were found:

 

a.         Pursuant to Permit Condition A4 of the Solid Waste Facility Permit 46-08 issued to Respondent on October 27, 2006, the Permittee shall at all times properly manage, operate, and maintain all facilities and systems of treatment and control which are installed or used by the Permittee to comply with the specifications included in the original application and permit requirements.  Respondent did not properly manage, operate and maintain the restricted waste site in accordance with the permit requirements.  This violation did not occur on March 30, 2009 and June 29, 2009.

 

b.         Pursuant to Permit Condition E12 of the Solid Waste Facility Permit 46-08 issued to Respondent on October 27, 2006, the Permittee shall minimize the working face of the landfill.  Respondent did not minimize the working face of the landfill.  Specifically, slope failures and erosion rills were observed in the overfill area due to the steep slopes and instability of the foundry waste.  This violation did not occur on March 30, 2009 and June 29, 2009.

 

c.         Pursuant to 329 Indiana Administrative Code (“IAC”) 10-28-11(b), cover must be applied and maintained at restricted waste sites Type I and Type II and nonmunicipal solid waste landfills in accordance with the applicable requirements of this rule and 329 IAC 10-30-2 and 329 IAC 10-30-3.  Respondent failed to apply and/or maintain the cover as required.

 

d.         Pursuant to Permit Condition E13 of the Solid Waste Facility Permit 46-08 issued to Respondent on October 27, 2006, the Permittee shall cover the facility according to the following:

 

a.         Apply cover such as a plastic tarp, six inches (6”) of soil, Formula 480 Liquid Clay, and/or alternate cover material acceptable to IDEM if the waste disposal activities will not occur at the landfill the following day.

 

b.         Minimize precipitation infiltration into the waste by utilizing temporary impermeable covers.  Only the active fill area (approximately half an acre in size) will remain uncovered at any time, except during construction and/or transition periods, when a larger area may remain uncovered.  The Permittee shall ensure that waste does not accumulate on top of the cover.  The integrity of the cover shall be maintained.

 

Respondent did not apply adequate cover on Phase 1 or minimize precipitation infiltration into the foundry waste by utilizing temporary covers.  In addition, Respondent allowed foundry waste and leachate to accumulate on top of the temporary cover once it was applied to Phase 1 and the integrity of the cover was not maintained.

 

e.         Pursuant to 329 IAC 10-28-14(a), cover material applied as required in sections 11 through 13 of this rule and 329 IAC 10-30-2 and 329 IAC 10-30-3 must be continuously maintained, including application and compaction of additional cover as needed to maintain required depth.  Respondent did not maintain the covered portions of the landfill and did not properly grade the filled areas to promote surface water drainage and to prevent the ponding of water in previously filled areas.

 

f.          Pursuant to 329 IAC 10-28-14(c), restricted waste sites Type I and Type II and nonmunicipal solid waste landfills must be graded to promote surface water drainage and to prevent the ponding of water on previously filled areas.  Respondent did not maintain the covered portions of the landfill and did not properly grade the filled areas to promote surface water drainage and to prevent the ponding of water in previously filled areas.

 

g.         Pursuant to 329 IAC 10-28-15(a), any leachate on the surface of restricted waste sites Type I and Type II and nonmunicipal solid waste landfills must be immediately managed or controlled to prevent off-site migration.  Respondent did not properly control or manage the leachate to prevent off-site migration.

 

h.         Pursuant to 329 IAC 10-28-15(b), any surface movement of leachate past a point fifty (50) feet outside of the solid waste boundary is prohibited except as specified in the facility permit.  Respondent did not properly control or manage the leachate to prevent off-site migration.

 

i.          Pursuant to 329 IAC 10-28-16, any discharge or disposal of collected leachate must be in accordance with applicable local, state, and federal laws and rules.  Respondent recirculated leachate from Phase 1 onto the east side of the landfill (haul road) allowing leachate to migrate outside the solid waste boundary into the sedimentation pond.

 

            Respondent ceased recirculation of the leachate on or before June 19, 2008.

 

j.          Pursuant to Indiana Code (“IC”) 13-30-2-1(1), no person shall discharge, emit, cause, allow, or threaten to discharge, emit, cause, or allow any contaminant or waste, including any noxious odor, either alone or in combination with contaminants from other sources, into the environment in violation of 329 IAC 10-4-2.  Respondent allowed leachate and foundry waste from Phase 1, construction runoff from Phase 2 and runoff from the overfill area to migrate into the diversion ditch and sedimentation pond.

 

k.         Pursuant to 329 IAC 10-4-2, no person shall cause or allow the storage, containment, processing, or disposal of solid waste in a manner which creates a threat to human health or the environment, including the creating of a fire hazard, vector attraction, air or water pollution, or other contamination.  Respondent caused and/or allowed foundry waste and leachate to be stored and/or disposed at the Site in a manner which creates a threat to human health or the environment.

 

l.          Pursuant to Permit Condition E15 of the Solid Waste Facility Permit 46-08 issued to Respondent on October 27, 2006, the Permittee shall not cause the discharge of a nonpoint source of pollution into the waters of the United States, including wetlands, that violates any requirements of an areawide or statewide water quality management plan that has been approved under Section 208 or 319 of the Clean Water Act, as amended.  The Permittee shall comply with applicable requirements of 327 IAC 15 regarding storm water discharge.  Respondent allowed leachate and foundry waste from Phase 1, construction runoff from Phase 2 and runoff from the overfill area to migrate into the diversion ditch and sedimentation pond.

 

m.        Pursuant to 329 IAC 10-27-2(1), before beginning operation, owners or operators of restricted waste sites Type I and Type II and nonmunicipal solid waste landfills shall be required to establish a series of identifiable boundary markers that will delineate the approved facility boundaries and solid waste boundaries for the life of the facility.

 

Respondent did not establish a series of identifiable boundary markers to delineate the approved facility boundaries and solid waste boundaries for the life of the facility.

 

n.         Pursuant to Permit Condition D4 of the Solid Waste Facility Permit 46-08 issued to Respondent on October 27, 2006, boundary markers shall be placed to identify the limits of construction of each new unit.  Respondent did not provide boundary markers identifying the limits of construction for Phase 1 and Phase 2.

 

            Respondent provided required boundary markers on or before June 19, 2008.

 

o.         Pursuant to Permit Condition E6 of the Solid Waste Facility Permit 46-08 issued to Respondent on October 27, 2006, permanent visible boundary markers which delineate the approved facility and waste boundaries shall be maintained for the life of the facility.  Respondent did not establish permanent visible boundary markers to delineate the approved facility boundaries and solid waste boundaries.

 

            Respondent provided boundary markers on or before June 19, 2008.

 

p.         Pursuant to Permit Condition E7 of the Solid Waste Facility Permit 46-08 issued to Respondent on October 27, 2006, waste disposal shall be limited to the areas delineated by the waste boundary line as shown on Drawing Sheet 4-4, Liner Grades and Operational Plan East Extensions, revised February 23, 2006.  Respondent deposited waste outside the fill area and allowed leachate and foundry waste to migrate beyond the delineated fill area.

 

q.         Pursuant to 329 IAC 10-28-10(a), restricted waste sites Type I and Type II and nonmunicipal solid waste landfills must not deposit solid waste in standing or ponding water except for the water resulting from precipitation directly upon the working face.

 

Respondent did not divert surface water from the active fill area and did not minimize surface water contact with the foundry waste.

 

r.          Pursuant to Permit Condition E4 of the Solid Waste Facility Permit 46-08 issued to Respondent on October 27, 2006, the Permittee shall implement any necessary surface water runoff control measures around the excavated area to prevent the creation of a nuisance or pollution condition at the site.  Respondent did not divert surface water from the active fill area and did not minimize surface water contact with the foundry waste.

 

s.         Pursuant to Permit Condition E8 of the Solid Waste Facility Permit 46-08 issued to Respondent on October 27, 2006, surface water must be diverted from the active fill area to minimize surface water contact with the foundry waste and interference with daily operation.  Respondent did not divert surface water from the active fill area and did not minimize surface water contact with the foundry waste.

 

t.          Pursuant to Permit Condition E9 of the Solid Waste Facility Permit 46-08 issued to Respondent on October 27, 2006, the Permittee shall manage surface water as described in the original application.  The drainage ditches and sedimentation basins shall be properly maintained to prevent sediment from deposition offsite.  Temporary runoff control structures shall be constructed in areas which are unable to drain to the sedimentation basins.  Respondent did not follow the construction plan described in attachment 4D of the permit application dated September 19, 2005, to include, but not limited to, diversion of water, dewatering and erosion control.

 

u.         Pursuant to Permit Condition A3 of the Solid Waste Facility Permit 46-08 issued to Respondent on October 27, 2006, if any nuisance or ground surface pollution conditions are created at this facility, corrective action shall be initiated by the Permittee immediately.  Respondent improperly managed leachate and did not adequately control erosion at the Site.

 

v.         Pursuant to Permit Condition E10 of the Solid Waste Facility Permit 46-08 issued to Respondent on October 27, 2006, a general inspection of the site, including, but not limited to: inspection of the intermediate and final cover, differential settlement, runoff structures, erosion control structures, drainage ditches, monitoring well and manholes, and dust control must be made and be performed at least once a month at the facility.

 

The inspection records must be available for review by IDEM staff at the facility office.  Respondent conducted inspections at the Site which were inadequate and did not reflect the conditions at the Site.  In addition, areas of non-compliance and corrective actions were not documented in the inspection records.

 

Respondent revised inspection protocols on or before June 29, 2009.

 

w.        Pursuant to Permit Condition F3 of the Solid Waste Facility Permit 46-08 issued to Respondent on October 27, 2006, access ways to each monitoring well must be maintained and passable throughout each season of the year.  Respondent did not maintain access ways to each monitoring well for department vehicles.  In addition some monitoring wells were blocked by vegetation and were inaccessible.

 

Respondent addressed this situation on or before September 30, 2008.

 

8.         Respondent completed the following on or before March 31, 2010: proper cover is being used on the old and new area, well access is maintained, and waste classifications are properly managed.

 

9.          In recognition of the settlement reached, Respondent waives any right to administrative and judicial review of this Agreed Order.

 

II.  ORDER

 

1.                  This Agreed Order shall be effective (“Effective Date”) when it is approved by Complainant or Complainant’s delegate, and has been received by Respondent.  This Agreed Order shall have no force or effect until the Effective Date.

 

2.                  Respondent shall comply with statutes, rules and Permit Conditions applicable to the facility.

 

3.                  Within thirty (30) days of the Effective Date, Respondent shall immediately cease all off-site discharges of leachate, sediments, and/or wastes from the RWS that are in violation of state and federal environmental laws and regulations.

 

4.          Within thirty (30) days of the Effective Date of this Agreed Order, Respondent shall immediately cease any unpermitted discharge of pollutants into waters of the United States, including wetlands, that violates the Clean Water Act, including, but not limited to, the requirements if the National Pollutant Discharge Elimination System (“NPDES”).

 

5.         Within sixty (60) days of the Effective Date of this Agreed Order, Respondent shall divert surface water from the active fill area to minimize surface water contact with waste and interference with daily operations.

 

6.         Upon the Effective Date of this Agreed Order, Respondent shall properly manage the RWS cover in accordance with Permit Condition E13 of the Solid Waste Facility Permit 46-08 issued to Respondent on October 27, 2006.

 

7.         Upon the Effective Date of this Agreed Order, Respondent shall ensure compliance with 329 IAC 10-9-4.

 

8.          Upon the Effective Date of this Agreed Order, Respondent shall ensure that it maintains the permanent visible boundary markers which delineate the approved facility and waste boundaries for the life of the facility.

 

9.          Upon the Effective Date of this Agreed order, Respondent shall maintain a record keeping log that indicates the amount of leachate pumped from the RWS.  This log shall be maintained for one (1) year from the Effective Date.

 

10.       Within thirty (30) days of the Effective Date of this Agreed Order, Respondent shall remove foundry wastes located in areas not approved for fill, namely from the ditch on the north, west and east side of the RWS, temporary sediment basin east of the old haul road and the delta in the northern part of the sediment pond.

 

11.       Within forty-five (45) days of the Effective Date, Respondent shall submit documentation of the foundry waste removal as required in paragraph 10 of this Order section.

 

12.       Within ninety (90) days of the Effective Date of this Agreed Order, Respondent shall submit documentation to IDEM on a quarterly basis demonstrating that leachate and surface water are adequately being managed to prevent off-site migration of leachate, sediments, and wastes.  The reports shall include the record keeping log described in Paragraph 9 of this Order section, RWS inspection reports conducted quarterly and monthly to determine compliance with the SWP3 and the solid waste permit, respectively, and records of any maintenance performed on the control measures.  The reports shall be due by the 30th day of the month following the calendar quarter.  This reporting requirement shall terminate upon the issuance of a Resolution of Case letter from IDEM.

 

13.             All submittals required by this Agreed Order, unless Respondent is notified otherwise in writing by IDEM, shall be sent to:

 

 Linda L. McClure, Enforcement Case Manager

 Office of Land Quality – Mail Code 60-02L

 Indiana Department of Environmental Management

 100 North Senate Avenue

 Indianapolis, IN 46204-2251

 

14.             Respondent is assessed a civil penalty Twenty Seven Thousand Dollars ($27,000).  Said penalty amount shall be due and payable to the Environmental Management Special Fund within thirty (30) days of the Effective Date.  In the event that the civil penalty is not paid within thirty (30) days of the Effective Date, Respondent shall pay interest on the unpaid balance at the rate established by IC 24-4.6-1-101.  The interest shall continue to accrue until the civil penalty is paid in full.

 

15.             In the event the terms and conditions of the following paragraphs are violated, Complainant may assess and Respondent shall pay a stipulated penalty in the following amount:

 

Failure to comply with Order paragraph no. 9

$500 per full week

 

 

Failure to comply with Order paragraph no. 10

$500 per full week

 

 

Failure to comply with Order paragraph no. 12

$500 per full week

 

16.             Stipulated penalties shall be due and payable within thirty (30) days after Respondent receives written notice that Complainant has determined a stipulated penalty is due.  Assessment and payment of stipulated penalties shall not preclude Complainant from seeking any additional relief against Respondent for violation of this Agreed Order.  In lieu of any of the stipulated penalties set out above, Complainant may seek any other remedies or sanctions available by virtue of Respondent’s violation of this Agreed Order or Indiana law, including, but not limited to, civil penalties pursuant to IC 13-30-4.

 

17.             Civil and stipulated penalties are payable by check to the “Environmental Management Special Fund.”  Checks shall include the Case Number of this action and shall be mailed to:

 

Indiana Department of Environmental Management

Cashier – Mail Code 50-10C

100 North Senate Avenue

Indianapolis, IN 46204-2251

 

18.             This Agreed Order shall apply to and be binding upon Respondent and its successors and assigns.  Respondent’s signatories to this Agreed Order certify that they are fully authorized to execute this Agreed Order and legally bind the party they represent.  No change in ownership, corporate, or partnership status of Respondent shall in any way alter its status or responsibilities under this Agreed Order.

 

19.             In the event that any terms of this Agreed Order are found to be invalid, the remaining terms shall remain in full force and effect and shall be construed and enforced as if this Agreed Order did not contain the invalid terms.

 

20.             Respondent shall provide a copy of this Agreed Order, if in force, to any subsequent owners or successors before ownership rights are transferred.  Respondent shall ensure that all contractors, firms and other persons performing work under this Agreed Order comply with the terms of this Agreed Order.

 

21.             This Agreed Order is not and shall not be interpreted to be a permit or a modification of an existing permit.  This Agreed Order, and IDEM’s review or approval of any submittal made by Respondent pursuant to this Agreed Order, shall not in any way relieve Respondent of its obligation to comply with the requirements of its applicable permit or any applicable Federal or State law or regulation.

 

22.             Complainant does not, by its approval of this Agreed Order, warrant or aver in any manner that Respondent’s compliance with any aspect of this Agreed Order will result in compliance with the provisions of any permit, order, or any applicable Federal or State law or regulation.  Additionally, IDEM or anyone acting on its behalf shall not be held liable for any costs or penalties Respondent may incur as a result of Respondent’s efforts to comply with this Agreed Order.

 

23.             Nothing in this Agreed Order shall prevent or limit IDEM’s rights to obtain penalties or injunctive relief under any applicable Federal or State law or regulation, except that IDEM may not, and hereby waives its right to, seek additional civil penalties for the same violations specified in the NOV.

 

24.             Nothing in this Agreed Order shall prevent IDEM, or anyone acting on its behalf, from communicating with the EPA or any other agency or entity about any matters relating to this enforcement action.  IDEM or anyone acting on its behalf shall not be held liable for any costs or penalties Respondent may incur as a result of such communications with the EPA or any other agency or entity.

 

25.             This Agreed Order shall remain in effect until IDEM issues a Resolution of Case letter to Respondent.

 

TECHNICAL RECOMMENDATION:

RESPONDENT:

 

Department of Environmental Management

 

 

 

 

 

By: _________________________

By:  _________________________

 

 

Nancy Johnston, Section Chief

 

 

 

Enforcement Section

Printed: ______________________

 

Office of Land Quality

 

 

 

Title: ________________________

 

 

 

 

Date: __________________

Date: _______________________

 

 

 

 

 

 

 

COUNSEL FOR COMPLAINANT:

COUNSEL FOR RESPONDENT:

 

For the Department of Environmental Management

 

 

 

 

 

By: ________________________

By: ________________________

 

 

Deputy Attorney General

 

 

 

 

Date: _______________________

Date: ______________________

 

 

 

APPROVED AND ADOPTED BY THE INDIANA DEPARTMENT OF ENVIRONMENTAL

 

MANAGEMENT THIS

_____

DAY OF

___________

, 20___.

 

 

 

 

For the Commissioner:

 

 

 

 

 

Signed 1/5/2011

 

 

Bruce H Palin

 

 

Assistant Commissioner

 

 

Office of Land Quality