Morgan County Board of Commissioners Bridge 112 Wellman Rd, 0.14 miles south of West Bradley Rd (Des # 2101710) in the Crawfordsville District.
Response Due Date & Time: September 9, 2022 at 6:30 PM -
Kosciusko County Board of Commissioners Replacement of Bridge #9 – Husky Trail over Deeds Creeks (Des # 2003013) in the Fort Wayne District.
Response Due Date & Time: August 31, 2022 at 12:00 PM -
Town of Winamac Downtown Sidewalks and Lights (Des # 1702823) in the LaPorte District.
Response Due Date & Time: August 12, 2022 at 3:30 p.m. Eastern -
Town of Chesterton Right-of-Way Acquisition Services for the Westchester-Liberty Trail, Phase 3 (Des # 1902832) in the LaPorte District.
Response Due Date & Time: August 29, 2022 at 3:30pm -
Benton County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2023-2026 (Des# 2200458) in the Crawfordsville District.
Response Due Date & Time: August 25, 2022 at 2:00 PM -
Monroe County, Fullerton Pike, Phase III (Des # 1802977 & 2001721) in Seymour District
Response Due Date & Time: August 26, 2022 at 12:00 pm -
Hamilton County Board of Commissioners - CE Services for the Bell Ford Pedestrian Bridge carrying the Geist Greenway Trail over Fall Creek (Des # 1901696) in the Greenfield District.
Response Due Date & Time: August 19, 2022 at 4:00 pm -
City of South Bend CE Services for Coal Line Trail Phase IIB (Des # 2200199) in the LaPorte District.
Response Due Date & Time: August 23, 2022 at 9:00am -
City of Bloomington Downtown Curb Ramps Phase 3 at numerous locations in and near downtown that require accessible curb ramps (Des # 1900403) in the Seymour District.
Response Due Date & Time: August 12, 2022 at 4:00pm local time. -
City of Hammond Construction Inspection for Summer Street (Des# 1902700 and 2101127) in the LaPorte District.
Response Due Date & Time: August 18, 2022 at 9;00 AM CST. -
Jennings County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2023-2026 (Des# 2201114) in the Seymour District.
Response Due Date & Time: August 15, 2022 at 4:00 PM -
Union County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2023-2026 (Des #2200481) in the Greenfield District.
Response Due Date & Time: August 11, 2022 at 3 PM -
City of Bloomington PE Services for the Crosswalk Safety Improvements Project (Des # 2200014) in the Seymour District.
Response Due Date & Time: August 8, 2022 at 4pm Eastern Time -
City of Greenfield Construction Inspection of Riley Literary Trail (Des # 1801423) in the Greenfield District.
Response Due Date & Time: July 19, 2022 at 4:00pm -
City of Bloomington PE Services for High (Arden to 3rd) Street Intersection Modernizations and Multiuse Path (Des # 2200020) in the Seymour District.
Response Due Date & Time: August 1, 2022 at 4pm Eastern Time -
City of Madison Project Development Services for Phase II of the Main Street Corridor from McIntire Street to Mill Street including road rehabilitation, HMA Overlay, Structural. (Des # 2101704) in the Seymour District.
Response Due Date & Time: July 29, 2022 at 12:00 PM (Noon) -
City of Lebanon Grant Street Reconstruction Phase 2 (Des # 2101720) in the Crawfordsville District.
Response Due Date & Time: July 29, 2022 at 3:00 pm Local Time -
City of Lebanon, IN Witt Road Reconstruction from Lafayette Ave. to Austin Drive (Des # 2101721) in the Crawfordsville District.
Response Due Date & Time: July 29, 2022 at 3:00 pm Local Time -
St. Joseph County, Indiana McKinley Highway Added Travel Lanes Project – Birch Rd. to Ash Rd. (Des # 0902286) in the LaPorte District.
Response Due Date & Time: July 19, 2022 at 10:00 AM EST -
St. Joseph County, Indiana Bridge Replacement on Walnut Road Over Potato Creek (Des # 2101682) in the LaPorte District.
Response Due Date & Time: July 19, 2022 at 10:00 AM EST -
La Porte County Construction Inspection for Marquette Trail (Des# 1592335) in the La Porte District.
Response Due Date & Time: July 7, 2022 at 2:30 -
Johnson County Highway Department Engineering Services for Replacement of County Bridge No. 56, North 650 W, approx. 600 feet south of West 100N (Des # 2101686) in the Seymour District.
Response Due Date & Time: July 8, 2022 at 12:00 noon -
Carroll County highway CR 75W Phase 1- CR75 W & CR 50 W from approximately CR 650 N to SR 25 in Carroll County (Des # 2101680) in the LaPorte District.
Response Due Date & Time: July 29, 2022 at 3:00 PM EST -
City ofHammond (Des# 1901784) in the Laporte District.
Response Due Date & Time: July 14, 2022 at 9:00 AM CST -
City of Bloomington Downtown Curb Ramps Phase 3 at numerous locations in and near downtown that require accessible curb ramps (Des # 1900403) in the Seymour District.
Response Due Date & Time: July 11, 2022 at 4:00pm local time -
Delaware County PE and RW Services for the Rehabilitation of Bridge #51 located on McGalliard Rd/CR 200 N @ Killbuck Creek (Des # 2101736) in the Greenfield District.
Response Due Date & Time: July 11, 2022 at 12:00 PM -
Delaware County CE Services for the Rehabilitation of Bridge #51 located on McGalliard Rd/CR 200 N @ Killbuck Creek (Des # 2101736) in the Greenfield District.
Response Due Date & Time: July 11, 2022 at 12:00 PM -
Delaware County PE and RW Services for the Rehabilitation of Bridge #30 located on Eaton-Albany Pike @ Rees Ditch (Des # 2101735) in the Greenfield District.
Response Due Date & Time: July 11, 2022 at 12:00 PM -
Delaware County CE Services for the Rehabilitation of Bridge #30 located on Eaton-Albany Pike @ Rees Ditch (Des # 2101735) in the Greenfield District.
Response Due Date & Time: July 11, 2022 at 12:00 PM -
La Porte County Construction Inspection for Marquette Trail (Des# 1592335) in the La Porte District.
Response Due Date & Time: July 7, 2022 at 2:30 -
City of Vincennes Washington Ave. Phase I (Des # 1800976) in the Vincennes District.
Response Due Date & Time: June 29, 2022 at 3:00pm EST -
Town of Winfield R/W Services for Roundabout at 117th Street @ Randolph Street (Des # 2101168) in the LaPorte District.
Response Due Date & Time: June 29, 2022 at 4:30 pm CST -
Allen County PE and RW Services for the Cuba Road Bridge 24 (Des 2101756) and the Woodburn Road Bridge 51 (Des 2101762) in the Fort Wayne District.
Response Due Date & Time: July 1, 2022 at 3:00 PM. -
Allen County PE and RW Services for the Van Zile Road Bridge 32 (Des 2101761) and the Hamilton Road Bridge 242 (Des 2101768) in the Fort Wayne District.
Response Due Date & Time: July 1, 2022 at 3:00 PM. -
Porter County Department of Development & Storm Water Management; Willowcreek Road Extension Project from C.R. 700 North to U.S. Hwy. 30 (Des # 1902001 and future DES to be determined) in the LaPorte District.
Response Due Date & Time: June 30, 2022 at 4:00 PM Central time -
Porter County Department of Development and Storm Water Management, Bridge 64-00056 Replacement, carrying CR 1050 South over Pleasant Township Ditch in Porter County, IN,; LaPorte District
Response Due Date & Time: June 30, 2022 at 4:00 PM Central time -
City of Bloomington 1st Street Reconstruction from Fairview Street to College Avenue (Des # 1900399) in the Seymour District.
Response Due Date & Time: June 22, 2022 at 4:00pm local time -
City of Bedford Replacement of Regulatory signs and Warning signs throughout the City (Des # 2002972) in the Vincennes District.
Response Due Date & Time: June 21, 2022 at 3:00pm EST -
Miami County Replacement of Bridge 144, CR 1050 East over Big Pipe Creek (Des 2101764) in the Fort Wayne District.
Response Due Date & Time: June 20, 2022 at 3:00PM -
Miami County Replacement of Bridge 165, CR 300 West over Rife Creek (Des # 2101757) in the Fort Wayne District.
Response Due Date & Time: June 20, 2022 at 3:00PM -
Kosciusko County Board of Commissioners Replacement of Bridge #123 – Packerton Road over Wyland Ditch (Des # 2101760) in the Fort Wayne District.
Response Due Date & Time: June 13, 2022 at 12:00 PM -
Water Street Improvements, Town of Oldenburg (Des # 2101701) and Franklin County Bridge 163 Project (Des #2101697) in the Seymour District.
Response Due Date & Time: June 9, 2022 at 5:00 PM -
Decatur County Highway Dept. Replace existing Bridge #131 with New Structure on 200S .04 MILES West of 1050 West. (Des # 2101707) in the Seymour District.
Response Due Date & Time: June 17, 2022 at 4:00 PM -
Putnam County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2023-2026 (Des #2200454) in the Crawfordsville District.
Response Due Date & Time: June 10, 2022 at 11:00AM -
Bartholomew County PE and RW engineering for the replacement of Bridge 170, on Lowell Road over Driftwood River and Intersection Improvements for the Intersection of CR 325 West with Lowell Road. (Des #2101702 & Des #2101683) in Seymour District.
Response Due Date & Time: June 6, 2022 at 4:30 PM -
Town of Corydon Concrete Multiuse Path along Chestnut Street from Mulberry Street to College Avenue (Des # 2101688) in the Seymour District.
Response Due Date & Time: June 6, 2022 at 12:00pm EST -
Wabash County HMA Minor Structural Overlay (Des # 2101775) in the Fort Wayne District.
Response Due Date & Time: May 27, 2022 at 11 AM -
Huntington County Bridge 501 rehabilitation over little river (Des # 2101763) in the Fort Wayne District.
Response Due Date & Time: June 6, 2022 at 11:00 A.M. -
LaGrange County Bridge 49 Replacement on CR 700 S (over Westler/Witmer Lakes Channel) (Des 2101766) in the Fort Wayne District.
Response Due Date & Time: May 30, 2022 at 12 pm Local time -
Perry County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2023-2026. (Des # 2200108) in the Vincennes District.
Response Due Date & Time: May 30, 2022 at 3:30 PM -
Town of Huntertown – Carroll Rd (East and West) (Des # 1801748 and 1801749) in the Fort Wayne District.
Response Due Date & Time: May 31, 2022 at 3:30 p.m. -
City of Greensburg & Decatur County PE & RW services for Reconstruction of Park Road from 200W to east of Weatherby Court (Des # 2101687 & 2101690) in the Seymour District.
Response Due Date & Time: May 31, 2022 at 5:00 PM EDT -
Henry County Sign Replacement on Various Roads in the Western 4 Townships-Henry County-PE (Des # 2101743) in the Greenfield District.
Response Due Date & Time: May 27, 2022 at 10:00 am -
Wabash County HMA Minor Structural Overlay (Des # 2101775) in the Fort Wayne District
Response Due Date & Time: May 25, 2022 at 11 AM -
Wabash County Rehabilitation of Bridge 96, E Hanging Rock Road over the Salamonie River (Des # 2101741) in the Fort Wayne District.
Response Due Date & Time: May 25, 2022 at 11 AM -
Starke County Replacement for County Bridge #59, CR 700 S over Bogus Run Bridge 59 (Des # 2101700) in the LaPorte District.
Response Due Date & Time: May 25, 2022 at 8:00 am CST -
Town of Milford - Bike and Pedestrian Trail from 1st Street to Waubee Lake Park (Camp Mack Road) (Des # 2101778) in the Fort Wayne District.
Response Due Date & Time: May 20, 2022 at 12:00pm EST -
Wells County Board of Commissioners – CR 200S Reconstruction between Clark St/Hoosier Hwy and State Road 1 – Phase 2 (Des # 2101776) in the Fort Wayne District.
Response Due Date & Time: May 24, 2022 at 2 pm local time -
Fountain County Fountain County Bridge No. 202 Replacement E. Stone Bluff Road (CR30E) Over Coal Creek (Des # 2101730) in the Crawfordsville District.
Response Due Date & Time: May 23, 2022 at 3:30 -
Town of Avon CE For Dan Jones Road, Phases I & II (Des # 1801463, 1901763 and 2001663) in the Crawfordsville District.
Response Due Date & Time: May 23, 2022 at 13:00 -
Morgan County Board of Commissioners Old State Rd 67, 0.03 miles North of State Rd 67 near Paragon, IN (Des # 2101685) in the Seymour District.
Response Due Date & Time: May 16, 2022 at 6:30 PM -
Vermillion County Bridge Replacement Br. 37 CR 200 E over Norton Creek (Des # 2101716) in the Crawfordsville District.
Response Due Date & Time: May 18, 2022 at 3:30 pm -
Morgan County Board of Commissioners Bridge 112 Wellman Rd, 0.41 miles south of Strawtown Rd (Des # 2101710) in the Crawfordsville District
Response Due Date & Time: May 16, 2022 at 6:30 PM -
Morgan County Board of Commissioners Bridge 107 Measel Rd. 0.45 mile North of Gore Rd. (Des # 2101706) in the Crawfordsville District.
Response Due Date & Time: May 16, 2022 at 6:30 PM -
Hancock County PE ROW Bridge 67 – CR 700W over Buck Creek (Des # 2101745) in Greenfield District
Response Due Date & Time: May 13, 2022 at 3:00pm -
Hancock County PE ROW CR500W and CR200 S Roundabout (Des # 2101744) in Greenfield District
Response Due Date & Time: May 13, 2022 at 3:00pm -
Hancock County PE ROW Bridge 86 – CR450W over Sugar Creek (Des # 2101742) in Greenfield District
Response Due Date & Time: May 13, 2022 at 3:00pm -
Hancock County CE BR 62, CR300N over Sugar Creek (Des # 1702755) in Greenfield District
Response Due Date & Time: May 13, 2022 at 3:00pm -
Hancock County CE CR 600W, Broken Arrow Dr. to Bridge 145 (Des # 1702754) in Greenfield District
Response Due Date & Time: May 13, 2022 at 3:00pm -
Hamilton County Board of Commissioners – Replacement of Bridge #130 carrying Cyntheanne Road over Dyers Creek (Des # 2101738) in the Greenfield District.
Response Due Date & Time: May 20, 2022 at 4:00 pm -
City of Seymour is seeking Roadway Design Services for the Design of O’Brien Street Ph1(Des # 2101694) in the Seymour District.
Response Due Date & Time: May 19, 2022 at 10:00 am -
Lake County Construction Inspection for the replacement of Lake County Bridge #48, 117th Avenue over West Creek, (Des # 1702830) in the LaPorte District.
Response Due Date & Time: May 19, 2022 at 2:00 pm CST -
City of Logansport Sidewalks and ADA Ramp Upgrades around 2 Elementary Schools, Junior High School, and Ivy Tech (Des # 2101681) in the Laporte District.
Response Due Date & Time: May 13, 2022 at 3 PM -
Pike County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2023-2026. (Des # 2200445) in the Vincennes District.
Response Due Date & Time: May 16, 2022 at 4:00 pm -
Noble County Riley Road Intersection Improvements (Des # 2101773) in the Fort Wayne District.
Response Due Date & Time: May 13, 2022 at 2:30 PM EST -
City of Greenfield Construction Inspection of School Zone Flashers & HAWK Signal projects (Des # 1801424 & 1901776) in the Greenfield District.
Response Due Date & Time: May 6, 2022 at 4:00pm -
City of Greenfield Construction Inspection of Riley Literary Trail (Des # 1801423) in the Greenfield District.
Response Due Date & Time: May 6, 2022 at 4:00pm -
Town of Middlebury Bristol Avenue Reconstruction from Brown Street to Powell Drive (Des # 2101771) in the Fort Wayne District.
Response Due Date & Time: May 9, 2022 at 3:00pm -
Town of Odon West Street Reconstruction Project in the Town of Odon (Des # 2101752) in the Vincennes District.
Response Due Date & Time: May 6, 2022 at 3:00 PM -
Town of North Judson Sidewalk and ADA Upgrades in the Hubeny Subdivision and school (Des # 2101695) in the LaPorte District.
Response Due Date & Time: May 16, 2022 at 10:00 AM CST. -
Porter County Department of Development & Storm Water Management; Bridge 64-00095 carrying C.R. 300 South over Ludington Ditch (Des # 2101692) in the LaPorte District.
Response Due Date & Time: May 20, 2022 at 4:00 PM Central time -
Jay County Replacement of Bridge #93 (Des # 2101729) in the Greenfield District.
Response Due Date & Time: May 6, 2022 at 3 p.m. local time -
Jay County Replacement of Bridge #110 (Des # 2101728) in the Greenfield District.
Response Due Date & Time: May 6, 2022 at 3 p.m. local time -
White County Bridge 183 Replacement (Des #2101689) in the LaPorte District.
Response Due Date & Time: May 6, 2022 at 3:00 PM -
White County Bridge 237 Replacement (Des #2101684) in the LaPorte District.
Response Due Date & Time: May 6, 2022 at 3:00 pm. -
Noble County Riley Road Intersection Improvements (Des # 2101773) in the Fort Wayne District.
Response Due Date & Time: May 6, 2022 at 2:30 PM EST -
Noble County Bridge 59 Replacement (Des # 2101759) in the Fort Wayne District.
Response Due Date & Time: May 6, 2022 at 2:30 PM EST -
Warren County Highway Dept. Replacement of WC Bridge #39, over Jordan Creek with additional road construction on CR 3 00 N east of Jordan Creek (Des # 2101731) in the Crawfordsville District.
Response Due Date & Time: May 6, 2022 at 3 p.m. -
Bartholomew County PE and RW engineering for the replacement of Bridge 170, on Lowell Road over Driftwood River and Intersection Improvements for the Intersection of CR 325 West with Lowell Road. (Des #2101702 & Des #2101683) in Seymour District.
Response Due Date & Time: May 3, 2022 at 4:30 PM -
Elkhart County CR 16 (Warren Street) Bridge #265 over the Little Elkhart River (Des # 2101770) in the Fort Wayne District.
Response Due Date & Time: May 4, 2022 at 3:00 PM -
Gibson County, Indiana Engineering and R/W Services for replacement of Gibson County Bridge #73 (Des # 2101754) in the Vincennes District.
Response Due Date & Time: May 2, 2022 at 5:00pm CST -
Steuben County Construction Inspection on CR 200 N (Des # 1600762) in the Fort Wayne District.
Response Due Date & Time: May 5, 2022 at 3:00 PM -
Wayne County Board of Commissioners Preliminary Engineering and R/W Services for Bridge # 511 (Des # 2101740) in the Greenfield District.
Response Due Date & Time: May 6, 2022 at 2:00 pm. -
Wells County Board of Commissioners – Replacement of Bridge 105 carrying CR 200N over the Rock Creek – CE Services (Des # 1902843) in the Fort Wayne District.
Response Due Date & Time: April 28, 2022 at 2 pm local time -
Wells County Board of Commissioners – Rehabilitation of Bridge 54 carrying CR 600W over the Salamonie River – CE Services (Des # 1902846) in the Fort Wayne District.
Response Due Date & Time: April 28, 2022 at 2 pm local time -
Marshall County Board of Commissioners Replacement Bridge No. 231 Center Street over Armey Ditch (Des # 2101698) in the Laporte District.
Response Due Date & Time: April 29, 2022 at 2:00 pm EST -
Montgomery County PE/RW services for three bridge deck rehabilitation and guardrail attenuators projects (Des # 2101723, 2101715, & 2101713) in the Crawfordsville District.
Response Due Date & Time: April 29, 2022 at 3:00 pm -
Tippecanoe County Replacement of Bridges 83 and 80 (Des # 2101726 and 2101724) in the Crawfordsville District.
Response Due Date & Time: April 29, 2022 at 3:00 pm -
Warrick County Bridge No. 140 Replacement on New Harmony Road over tributary to Pigeon Creek (Des # 2101750) in the Vincennes District.
Response Due Date & Time: April 26, 2022 at 4:00 PM CST -
City of Vincennes Washington Ave. Phase II (Des # 2101753) in the Vincennes District.
Response Due Date & Time: April 26, 2022 at 5:00 pm EST -
Boone County Bridge 61 Replacement (Des # 2101727) in the Crawfordsville District.
Response Due Date & Time: April 29, 2022 at 10:00 am -
City of Indianapolis, Department of Public Works; Michigan St. Road Diet, Phase 1 & 2 Marion County (Des # 1801447, 1901953) in the Greenfield District.
Response Due Date & Time: April 29, 2022 at 9:00 AM -
City of Indianapolis, Department of Public Works; Pedestrian Crash Focus Areas 4 and 8, Marion County (Des # 1901954) in the Greenfield District.
Response Due Date & Time: April 29, 2022 at 9:00 AM -
City of Indianapolis, Department of Public Works; 62nd Street and Cooper Road Intersection, Marion County (Des # 1901950) in the Greenfield District.
Response Due Date & Time: April 29, 2022 at 9:00 AM -
Boone County PE Services for Countywide Sign Replacement (Des # 2101725) in the Crawfordsville District.
Response Due Date & Time: April 29, 2022 at 10:00 am -
La Porte County Government, Bridge #186 on (Des # 1702833) in the La Porte District.
Response Due Date & Time: April 22, 2022 at 12:00 pm - (Des # 2101712) Monroe Co., Dillman Road Bridge #83 Replacement in Seymour District
-
Johnson County Smith Valley Road - Phase 2 (Des # 2200170) in the Seymour District.
Response Due Date & Time: April 6, 2022 at 5:00 pm -
Johnson County Smith Valley Road - Phase 1 (Des # 2200170) in the Seymour District.
Response Due Date & Time: April 6, 2022 at 5:00 pm -
Town of Lapaz- Michigan Street to Vintage Street (Des # 2101238) in the Laporte District.
Response Due Date & Time: April 6, 2022 at 2 PM EST -
Town of Cedar Lake Sidewalk on East Lake Shore Drive (Des # 2101110) in the LaPorte District.
Response Due Date & Time: April 21, 2022 at 3:00 pm Central Time -
La Porte County Government, Bridge #94 on CR 1200S over Long Ditch (Des # 2101709) in the La Porte District.
Response Due Date & Time: April 22, 2022 at 12:00 pm -
La Porte County Government Bridge Replacement Project #166 just east of intersection CR 400 W and CR 1650 S (Des # 2101711) in the La Porte District.
Response Due Date & Time: April 22, 2022 at 12:00pm -
Monroe County, Dillman Road Bridge #83 Replacement (Des # 2101712) in Seymour District
Response Due Date & Time: April 22, 2022 at 12:00 pm -
Michiana Area Council of Governments (MACOG) in coordination with St Joseph County and the Town of North Liberty: Feasibility Study with an Analysis of Alternatives for a trail between Lakeville (931) and North Liberty (Washington St) that will connect to the main entrance of Potato Creek State Park (Des # 2001101) in the LaPorte District
Response Due Date & Time: April 15, 2022 at 5:00 pm -
MCity of Goshen – Reconstruction of College Avenue from 9th Street to US 33 – Added TWTL and Multi-Use Path (Des # 2100021) in the Fort Wayne District.
Response Due Date & Time: April 4, 2022 at 3:00PM -
Michiana Area Council of Governments (MACOG) in coordination with Elkhart County and the City of Nappanee: Feasibility Study with an Analysis of Alternatives for the Road Improvement and Public Utility Extension on CR 52 from SR 19 to CR 101 and CR 101 from CR 52 to US 6 in Nappanee (Des 2001101) in the Fort Wayne District
Response Due Date & Time: April 8, 2022 at 5:00 pm -
Floyd County Countywide Transit Study to evaluate current and future services, need, providers, alternatives, cost estimates, and implementation. (Des #n/a) in Seymour District
Response Due Date & Time: April 4, 2022 at 12:00 p.m. -
Dearborn County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2023 through 2026 .. (Des# 2101783) in the Seymour. District.
Response Due Date & Time: March 30, 2022 at 11 :00 AM -
Morgan County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022 - 2025. (Des # 2002465.) in the Seymour District.
Response Due Date & Time: March 30, 2022 at 6:30 PM -
Town of Griffith, IN Avenue H and Broad Street Intersection Improvement Project (Des #2101119) in the LaPorte District.
Response Due Date & Time: March 17, 2022 at 4:00 pm -
Johnson County Highway Department Engineering Services for Replacement of County Bridge No. 605, Fry Road east of SR 135 (Des # 2200136) in the Seymour District.
Response Due Date & Time: March 18, 2022 at 12:00 noon -
Town of Clarksville, Construction Inspection Services, Riverside Drive (Des # 1700725) in the Clarksville District. District.
Response Due Date & Time: March 15, 2022 at 1:00 PM. -
Tippecanoe County Safety Improvements along Old US 231 and CR 500S including new trails and HAWK crossings (Des # 1601028) in the Crawfordsville District.
Response Due Date & Time: March 16, 2022 at 3:00 PM -
St, Joseph County, Indiana Roundabout Intersection Improvement at Douglas and Bittersweet Roads. (Des # 2100024) in the LaPorte District.
Response Due Date & Time: March 15, 2022 at 10:00 A.M. -
City of South Bend PE Services for Safe Routes to School – Our Lady of Hungary Neighborhood Sidewalks and ADA Ramps (Des # 2100025) in the LaPorte District.
Response Due Date & Time: March 8, 2022 at 9:00 AM South Bend Local Time -
City of Madison Project Development Services- Main Street Corridor from the intersection of SR 62 to the intersection of McIntire Street (including road rehabilitation, culvert rehabilitation/replacement and guardrail repair/replacement) (Des # 2002981) in the Seymour District.
Response Due Date & Time: March 7, 2022 at 12:00 PM (Noon) -
Monroe County; Vernal Pike Connector Road and Bridge (Des # 1702957/1900406) in the Seymour District.
Response Due Date & Time: March 4, 2022 at 12:00 pm -
Town of Lapaz- Michigan Street to Vintage Street (Des # 2101238) in the Laporte District.
Response Due Date & Time: February 15, 2022 at 2 PM EST -
City of Hobart Construction Inspection Services for the Colorado Street Safety Upgrades Project (Des # 1401034) in the LaPorte District.
Response Due Date & Time: February 28, 2022 at 4:00 pm CST -
City of Valparaiso, Roundabout at SR 130 @ CR 400N (Des # 2101133) in the LaPorte District.
Response Due Date & Time: February 22, 2022 at 4:30pm CST -
City of South Bend PE/RW Services for Bendix Dr (Lathrop to Voorde) (Des # 2100022) in the LaPorte District.
Response Due Date & Time: February 22, 2022 at 9:00 AM South Bend Local Time -
City of South Bend PE Services for Safe Routes to School – Muessel Primary and Holy Cross School Area (Des # 1900447) in the LaPorte District.
Response Due Date & Time: February 22, 2022 at 9:00 AM South Bend Local Time -
City of Westfield Construction Inspection Services (Des # 1801433) in Greenfield District
Response Due Date & Time: February 18, 2022 at 1:00 p.m. -
Town of Argos – Marshall Street, Walnut Street, and Michigan Street (Des 2101288) in La Porte District
Response Due Date & Time: January 27, 2022 at 3:00 PM EST -
DeKalb County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2101041) in the Fort Wayne. District.
Response Due Date & Time: January 28, 2022 at 10:00 AM -
RFP WITHDRAWN 12/22/2022
City of Indianapolis, Department of Public Works; Michigan Street Road Diet/Complete Streets, Phase 1 (Des # 1801447) in the Greenfield District.
Response Due Date & Time: WITHDRAWN -
City of Noblesville, Indiana. Construction Inspection for new multi-use path along Stony Creek from Clover Road to Mercantile Boulevard (Des # 1801437) in the Greenfield District.
Response Due Date & Time: January 18, 2022 at 4:00 PM -
Town of Brownsburg Construction inspection for CR 700 N Reconstruction (Des # 1701590) in the Crawfordsville District.
Response Due Date & Time: January 21, 2022 at 3:00 PM -
Town of Burns Harbor CE Management Services for Marquette Greenway Trail Phase IA (Des # 1601147) in the LaPorte District.
Response Due Date & Time: January 6, 2022 at 5:00 PM CT -
Marshall County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2101055) in the LaPorte District.
Response Due Date & Time: January 7, 2022 at 2:00 PM -
Town of Lapaz- Michigan Street to Vintage Street (Des # 2101238) in the Laporte District.
Response Due Date & Time: January 3, 2022 at 2:00 PM EST -
City of Indianapolis, Department of Public Works; Post Road from Washington Street to I-70 (Des # 1901959) in the Greenfield District.
Response Due Date & Time: January 7, 2022 at 4:00 PM -
City of Indianapolis, Department of Public Works; Emerson Avenue Widening from County Line Road to Stop 11 Road (Des # 1801448) in the Greenfield District.
Response Due Date & Time: January 7, 2022 at 4:00 PM -
WITHDRAWN 12/22/2021 - City of Indianapolis, Department of Public Works; Michigan Street Road Diet/Complete Streets, Phase 1 (Des # 1801447) in the Greenfield District.
Response Due Date & Time: WITHDRAWN 12/22/2021 -
City of Indianapolis, Department of Public Works; Pedestrian Crash Focus, Area 11C (Des # 1801446) in the Greenfield District.
Response Due Date & Time: January 7, 2022 at 4:00 PM -
City of Indianapolis, Department of Public Works; Pedestrian Crash Focus, Area 11A (Des# 1801444) in the Greenfield District.
Response Due Date & Time: January 7, 2022 at 4:00 PM -
City of Indianapolis, Department of Public Works; Keystone Avenue over White River in Marion County (Des # 1801439) in the Greenfield District.
Response Due Date & Time: January 7, 2022 at 4:00 PM -
Starke County Replacement for County Bridge #7, on CR 1200 E over Yellow River (Des # 1600940) in the LaPorte District.
Response Due Date & Time: December 29, 2021 at 8:00 AM (C.S.T.) -
Greenways Trail Phase III (North in River Park Square to pedestrian bridge across from River Gate South) in the City of Plymouth (Des 2101317) in La Porte District.
Response Due Date & Time: December 13, 2021 at 6:00 PM (E.S.T.) -
Owen County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2101187) in the Crawfordsville District.
Response Due Date & Time: December 03, 2021 at 3:30 PM -
Town of Huntertown Carroll Road at Shearwater Run/Coral Springs Run intersection improvement installation of a roundabout (Des # 2101634) in the Fort Wayne District.
Response Due Date & Time: November 29, 2021 at 4:00 PM -
White County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025 (Des # 2101164) in the LaPorte District.
Response Due Date & Time: November 29, 2021 at 5:00 PM -
City of Madison Project Development Services- Main Street Corridor from the intersection of SR 62 to the intersection of McIntire Street (including road rehabilitation, culvert rehabilitation/replacement and guardrail repair/replacement) (Des # 2002981) in the Seymour District.
Response Due Date & Time: November 18, 2021 at 12:00 PM (Noon) -
Town of Bourbon Sidewalks at various locations within the Town of Bourbon (Des #2101300) in the LaPorte District.
Response Due Date & Time: November 12, 2021 at 3:00 PM Eastern -
Tipton County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022 – 2025. (Des # 2101188) in the Greenfield District.
Response Due Date & Time: November 12, 2021 at 9:00 AM -
Dearborn County Construction Inspection for Slide Repair on Lower Dillsboro Road (Des # 1702959) in the Seymour District.
Response Due Date & Time: November 30, 2021 at 1:00 PM -
Town of Chesterton Throughout the town of Chesterton (Des # 2101117) in the LaPorte District.
Response Due Date & Time: November 4, 2021 at 4:30 PM -
City of Lebanon, IN Grant Street From Washington St. to Fordice Rd. (Des # 1800237) in the Crawfordsville District.
Response Due Date & Time: November 1, 2021 at 4:00 PM Local Time -
Warrick County Preliminary Engineering for Epworth Road from SR 66 to SR 662 (Des# 2002539) in Vincennes District.
Response Due Date & Time: October 12, 2021 at 4:00 PM CST -
City of New Albany, IN Construction Engineering for East Main Street (State St. to E. 5th St.) Project (Des # 1700730) in Seymour District.
Response Due Date & Time: October 29, 2021 at 3:00 PM -
City of South Bend Coal Line Trail (Phase II) from Riverside Dr. to SR 933 (Des # 1401811) in the LaPorte District.
Response Due Date & Time: October 26, 2021 at 9:00 AM EST -
Lake County Construction Inspection Reconstruction 45th Avenue Phase 3 Colfax to Whitcomb (Des # 9980080) in the LaPorte District.
Response Due Date & Time: October 28, 2021 at 2:00 PM CT -
Marshall County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2101055) in the LaPorte District.
Response Due Date & Time: October 25, 2021 at 2:00 PM -
City of Bloomington 17th Street from Monroe to Grant (Des # 1900402) in the Seymour District.
Response Due Date & Time: October 21, 2021 at 4:00 PM -
City of Woodburn Construction Inspection – Stellar Sidewalks and Trail Projects (Des # 2001665 (Sidewalks) and 2001675 (Trail)) in the Fort Wayne District.
Response Due Date & Time: October 29, 2021 at 4:00 PM -
Vanderburgh County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2101163) in the Vincennes District.
Response Due Date & Time: October 22, 2021 at 3:00 pm -
City of Bloomington B-Line Trail Connection from Adams to 17th (Des # 1700735) in the Seymour District.
Response Due Date & Time: October 21, 2021 at 4:00pm local time -
City of Goshen Wilden Avenue Reconstruction (Des # 1400715) in the Fort Wayne District.
Response Due Date & Time: October 15, 2021 at 2:00 PM -
Owen County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2101187) in the Crawfordsville District.
Response Due Date & Time: October 5, 2021 at 3:30 PM -
Town of St. John Cline Avenue Extension (Des # 2101150) in the LaPorte District.
Response Due Date & Time: October 4, 2021 at 4:00 pm local time -
Jefferson County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2023. (Des # 2101186) in the Seymour District.
Response Due Date & Time: September 20, 2021 at 2:00 P.M. -
Warrick County Preliminary Engineering for Epworth Road from SR 66 to SR 662 (Des# 2002539) in Vincennes District
Response Due Date & Time: September 15, 2021 at 4:00pm CST -
City of Kokomo Reconstruction of Berkley Road between Markland Avenue and Sycamore Street (Des # 1900778) in Greenfield District
Response Due Date & Time: September 10, 2021 at 4:00pm -
Johnson County Board of Commissioners Clark School Road Reconstruction between CR 750 E and the Shelby County Line and Replacement of Bridges 103 and 206 (Des # 2002991 (Lead), 2002993, 2100550) in the Seymour District.
Response Due Date & Time: September 17, 2021 at 3:00pm -
City of New Haven, IN 13.1 Construction Inspection – Broadway St./Landin Road, Road Reconstruction (3R/4R Standards) (Des # 1901819) and Bridge Rehabilitation or Repair (Des. No. 1601931) in the Fort Wayne District.
Response Due Date & Time: September 10, 2021 at 4:00 PM -
Tipton County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022 – 2025. (Des # 2101188) in the Greenfield District.
Response Due Date & Time: September 13, 2021 at 9:00 AM -
City of Richmond, Construction Engineering Services for the Complete Streets Loop Project, (Des # 1702769) in the Greenfield District.
Response Due Date & Time: September 23, 2021 at 4:59 PM -
Fayette County PE and RW for Bridge# 32 on County Road 50 North over Little Williams Creek. (Des #2003024 Click here to enter Des #) in the Greenfield District.
Response Due Date & Time: September 3, 2021 at 4.00 PM -
City of South Bend Inspection of Olive St Ph 2 Road Improvements at RR Xing (Des # 1920178) in the LaPorte District.
Response Due Date & Time: September 14, 2021 at 9:00 AM Local Time -
Randolph County Board of Commissioners Preliminary Engineering and R/W Services for Bridge #85 (Des #2003057) in Greenfield District
Response Due Date & Time: September 3, 2021 at 3 pm -
City of Warsaw 1664000 (Des # 1702850) in the Fort Wayne District.
Response Due Date & Time: September 13, 2021 at 3:45PM -
Porter County Dept of Development and Storm Water Management, Bridge 40 Replacement, carrying CR 1000 S over Reeves Ditch (South) in Porter County, IN, LaPorte District
Response Due Date & Time: August 27, 2021 at 3:00 PM Central time -
Town of Monroeville Construction Inspection – Stellar Sidewalk, Trail and Bridge Projects (Des # 2001784 (Sidewalks), 2001789 (Trail) and 2001790 (Bridge)) in the Fort Wayne District.
Response Due Date & Time: September 3, 2021 at 4:00 PM -
Lake County Construction Inspection for the replacement of Lake County Bridge #47, Belshaw Road over Bruce Ditch (Des # 1702831) in the LaPorte District.
Response Due Date & Time: August 30, 2021 at 2:00 pm CST -
Muncie Arts and Culture Trail (Des # 1700751) in Greenfield District
Response Due Date & Time: August 18, 2021 at 4:00 p.m. -
Ripley County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2101056) in the Seymour District.
Response Due Date & Time: August 20, 2021 at 11:00 AM -
City of Vincennes Construction Inspection (Des # 1600727) in the Vincennes District.
Response Due Date & Time: August 17, 2021 at 3:00 p.m. -
La Porte County Government Construction Inspection Services for Intersection Safety project located on 150 North, Lofgren road and 250 East in Kankakee Township.
Response Due Date & Time: August 3, 2021 at 2:00pm -
Jasper County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2023. (Des # 2100153) in the LaPorte District.
Response Due Date & Time: August 13, 2021 at 4:00 PM CST -
Blackford County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2101040) in the Fort Wayne District.
Response Due Date & Time: August 11, 2021 at 2:00 PM -
Clay County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2100964) in the Crawfordsville District.
Response Due Date & Time: August 11, 2021 at 8:50 am -
Starke County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2023. (Des # 2100993) in the LaPorte District.
Response Due Date & Time: August 9, 2021 at 8:00 AM CST -
Tippecanoe County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022 thru 2025 (Des # 2101033) in the Crawfordsville District.
Response Due Date & Time: August 9, 2021 at 3:00 PM -
Lake County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025 (Des # 2100292) in the LaPorte District.
Response Due Date & Time: August 6, 2021 at 2:00 pm CST -
Franklin County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022 - 2025. (Des # 2101054.) in the Seymour District.
Response Due Date & Time: August 6, 2021 at 3:00 PM Local Time -
Howard County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2101185) in the Greenfield District.
Response Due Date & Time: July 30, 2021 at 3:00 PM -
Newton County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2023. Des #2100155 in the LaPorte District.
Response Due Date & Time: July 22, 2021 at 4:00 PM -
La Porte County Government Construction Inspection Services for Intersection Safety project located on 150 North, Lofgren road and 250 East in Kankakee Township.
Response Due Date & Time: July 16, 2021 at 2:00pm -
Hamilton County Highway Department - 281st Street Rehabilitation from SR 19 to Rulon Road (Des # 2003031) in Greenfield District.
Response Due Date & Time: July 16, 2021 at 4:00 p.m. -
Pulaski County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2023 (Des 2100973) in the LaPorte District.
Response Due Date & Time: July 12, 2021 at 12:00 p.m. EST -
Whitley County Upgrade of sidewalks and ADA ramps for Subdivisions of Lincoln Pointe, Donatello's Village and Bel Sogno; E. Cobblestone Cove Trailhead (Des # 2003064) in the Fort Wayne District.
Response Due Date & Time: July 19, 2021 at 12:00 p.m. -
La Porte County Government Superstructure Replacement, 400’ southeast of intersection of John Road and Michigan Blvd over Trail Creek (Des # 2101149) in the La Porte District.
Response Due Date & Time: July 7, 2021 at 2:30pm -
Madison County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025 (Des. #2100965) in the Greenfield District.
Response Due Date & Time: July 6, 2021 at 9:00 AM local time -
Johnson County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2023 (Des # 2002461) in the Seymour District.
Response Due Date & Time: July 6, 2021 at 3:00 pm EDT -
City of Indianapolis, Department of Public Works Knozone public education and outreach for central Indiana (Des # 1700906) in Greenfield District
Response Due Date & Time: July 2, 2021 at 5:00pm -
Hancock County Bridge 85 (Des # 2003044) in Greenfield District
Response Due Date & Time: July 2, 2021 at 3:00pm -
Hancock County CR300N 600W to 700W in Greenfield District
Response Due Date & Time: July 2, 2021 at 3:00pm -
Hancock County Bridge 146 (Des # 2003043) in Greenfield District
Response Due Date & Time: July 2, 2021 at 3:00pm -
Washington County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des# 2100120) in the Seymour District.
Response Due Date & Time: July 6, 2021 at 9:00 am EST -
Delaware County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025 (Des. #2100143) in the Greenfield District.
Response Due Date & Time: July 14, 2021 at 10:00 AM Revised 06/08/2021 -
Harrison County Construction Inspection for the Lanesville Connector Rd Project (Des # 1702960 and 2001155) in the Seymour District.
Response Due Date & Time: July 16, 2021 at Noon local time -
City of Valparaiso, Multi use trail from transit parking lot to downtown (Des # 2101141) in the LaPorte District.
Response Due Date & Time: June 25, 2021 at 4:00 PM CST -
Randolph County Board of Commissioners Preliminary Engineering and R/W Services for Bridge #85 (Des #2003057) in Greenfield District
Response Due Date & Time: June 17, 2021 at 3:00 PM -
Muncie McGalliard Road from Dr. MLK Jr. Blvd to 67 Bypass (Des # 2003048) in Greenfield District
Response Due Date & Time: June 18, 2021 at 4:00 PM -
Muncie McGalliard Road from Tillotson Avenue to Wheeling Avenue (Des # 2003046) in Greenfield District
Response Due Date & Time: June 18, 2021 at 4:00 PM -
Muncie Tillotson Avenue from McGalliard Road to Kilgore Avenue (Des # 2003045) in Greenfield District
Response Due Date & Time: June 18, 2021 at 4:00 PM -
Fountain County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2100288) in the Crawfordsville District.
Response Due Date & Time: June 25, 2021 at 3:00 PM -
Morgan County Board of Commissioners Bridge Replacement 49 on Abraham Road over Stotts Creek (Des # 2002988) in the Seymour District.
Response Due Date & Time: June 21, 2021 at 6:30 PM -
Morgan County Board of Commissioners Bridge Replacement 166 on Old SR 37 over Bluff Creek (Des # 2002998) in the Seymour District.
Response Due Date & Time: June 21, 2021 at 6:30 PM -
Morgan County Board of Commissioners Bridge Replacement 29 on Mahalasville Road over Indian Trace Creek (Des # 2002995) in the Seymour District.
Response Due Date & Time: June 21, 2021 at 6:30 PM -
Monroe County, Bridge #629 Baby Creek Road (Des # 2002978) in the Seymour District.
Response Due Date & Time: June 25, 2021 at 12:00 pm -
City of Salem South Main Street Rehabilitation, Phase 3, from Beck’s Mill Road to bridge over West Fork of Blue River (Des # 2002977) in the Seymour District.
Response Due Date & Time: June 10, 2021 at 10:00 am -
City of Evansville Construction Inspection – Walnut Street Phase II (Des # 1801727) in the Vincennes District.
Response Due Date & Time: June 18, 2021 at 8 am Central Standard Time -
Morgan County Board of Commissioners Bridge Replacement 97 on Yale Road over Lake Ditch (Des # 2002996) in the Crawfordsville District.
Response Due Date & Time: June 21, 2021 at 6:30 PM -
Morgan County Board of Commissioners Bridge Replacement 104 on Gore Road 0.5 miles east of 875 West (Des # 2002997) in the Crawfordsville District.
Response Due Date & Time: June 21, 2021 at 6:30 PM -
Lawrence County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2100289) in the Vincennes District.
Response Due Date & Time: June 17, 2021 at no later than 2:00 pm Eastern Time -
Switzerland County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2100110) in the Seymour District.
Response Due Date & Time: June 14, 2021 at 4:00 PM Revised 5/26/21 -
Jasper County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2023 (Des# 2100153) in the LaPorte District.
Response Due Date & Time: June 14, 2021 at 4:00 PM CST -
Hancock County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025 (Des # 2002460) in Greenfield District.
Response Due Date & Time: June 11, 2021 at 3:00 PM -
Harrison County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025 (Des # 2100128) in the Seymour District.
Response Due Date & Time: June 11, 2021 at 12:00 PM -
Spencer County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025 (Des # 2100154) in the Vincennes District.
Response Due Date & Time: June 11, 2021 at 2:00 PM (CTS) -
Porter County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022 through 2023. (Des # 2100109) in the LaPorte District.
Response Due Date & Time: June 09, 2021 at 4:00 PM Central Time -
Delaware County – CE Services – Replacement of BR #112 – Located on CR 600 W @ Williams Creek (Des # 2003023) in Greenfield District
Response Due Date & Time: June 09, 2021 at 10:00 AM -
Delaware County – PE & R/W Services – Replacement of BR #112 – Located on CR 600 W @ Williams Creek (Des # 2003023) in Greenfield District
Response Due Date & Time: June 09, 2021 at 10:00 AM -
Town of Munster, Indiana Main Street Reconstruction, Phase 1 (Des # TBD) in the LaPorte District.
Response Due Date & Time: June 15, 2021 at 4:00 pm Revised 5/13/2021 -
Town of Fortville, CR 200 W Pedestrian Safety Project. (Des # 1592449) in the Greenfield District.
Response Due Date & Time: June 07, 2021 at 4:00 pm -
Allen County -- PE and RW Services for Monroeville Road & Wayne Trace Intersection Improvements (Des #2003073) in the Fort Wayne District.
Response Due Date & Time: May 28, 2021 at 3:00 pm -
Shelby County McGregor Rd/940 North (Des # 2003058) in Greenfield District
Response Due Date & Time: June 04, 2021 at 5:00 pm -
Marion County/Indianapolis Department of Public Works Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2002-2025. (Des # 2002464) in the Greenfield District.
Response Due Date & Time: June 03, 2021 at 4:00 pm EDT -
Elkhart County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2023 (Des # 2100291) in the Fort Wayne District.
Response Due Date & Time: June 03, 2021 at 3:00 pm local time -
Union County, Rehabilitation of Union County Bridge #33, Dunlapsville Road over Brookville Lake (Des # 2003062) in the Greenfield District.
Response Due Date & Time: May 28, 2021 at 3:00 pm -
Harrison County - Professional services associated with the rehabilitation of Harrison County Bridge #25 carrying Corydon New Middletown Rd over Little Indian Creek (Des # 2002982) in the Seymour District.
Response Due Date & Time: May 31, 2021 at 3:00 pm -
Clark County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2023. (Des # 2100080) in the Seymour District.
Response Due Date & Time: May 27, 2021 at 4:00 pm -
Porter County Department of Development & Storm Water Management; Bridge 64-00066 carrying CR 250 West over Phillips Ditch; (Des # 2003041) in the LaPorte District.
Response Due Date & Time: June 18, 2021 at 4:00 pm Central time -
Porter County Department of Development & Storm Water Management; Bridge 64-00001 carrying Divisions Rd over Hutton Ditch (Des # 2003042) in the LaPorte District.
Response Due Date & Time: June 18, 2021 at 4:00 pm Central time -
Harrison County – R/W Services for Rehabilitation of Harrison County Bridge #5752A carrying Old Hwy 337 over Buck Creek (Des # 2002990) in the Seymour District.
Response Due Date & Time: May 31, 2021 at 3:00 pm -
Bartholomew County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2023. (Des # 2100107) in the Seymour District.
Response Due Date & Time: May 24, 2021 at 4:30 pm -
Montgomery County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2100102) in the Crawfordsville District.
Response Due Date & Time: May 24, 2021 at 3:00 pm -
Hancock County CE (Des # 1702756) in Greenfield District
Response Due Date & Time: May 21, 2021 at 3:00 pm -
Hancock County CE (Des # 1702757) in Greenfield District
Response Due Date & Time: May 21, 2021 at 3:00 pm -
Vanderburgh County Franklin St. Bridge #620 Construction Inspection (Des # 1802048) in the Vincennes District.
Response Due Date & Time: May 19, 2021 at 12:00 pm local time -
Town of Brownsburg Construction Inspection for Airport Rd. and Green Street Roundabout (Des # 1701586) in the Crawfordsville District.
Response Due Date & Time: May 21, 2021 at 3:00 pm -
City of Goshen – Reconstruction of College Avenue from 9th Street to US 33 – Added TWTL and Multi-Use Path (Des # 2100021) in the Fort Wayne District.
Response Due Date & Time: May 21, 2021 at 3:00 pm -
Clinton County Replacement of Bridge 21 carrying 750N over Cripe Run (Des #2002999) in the Crawfordsville District.
Response Due Date & Time: May 17, 2021 at 4:00 pm -
Hendricks County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des 2002435) in the Crawfordsville District.
Response Due Date & Time: May 19, 2021 at 9:00 am -
Gibson County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2100082) in the Vincennes District.
Response Due Date & Time: May 19, 2021 at 4:00 pm -
White County Bridge 240 Replacement (Des # 2003032) in the LaPorte District.
Response Due Date & Time: May 20, 2021 at 3:00 pm -
White County Bridge 180 Replacement (Des # 2003033) in the LaPorte District.
Response Due Date & Time: May 20, 2021 at 3:00 pm -
Lake County PE, Right of Way Engineering, ROW Services for the Replacement Lake County Bridge #45-00097, Colorado Street over Deep River (Des#) in the LaPorte District.
Response Due Date & Time: May 17, 2021 at 2:00 PM CST (Revised 4/30/21) -
City of Salem South Main Street Rehabilitation, Phase 3, from Beck’s Mill Road to bridge over West Fork of Blue River (Des # 2002977) in the Seymour District.
Response Due Date & Time: May 03, 2021 at 5:00 PM -
Floyd County Right of Way Acquisition Services for Farnsley Knob Road Guardrail Installation (Des # 1801582) in Seymour District
Response Due Date & Time: May 19, 2021 at 4:00 PM EST -
Floyd County Right of Way Acquisition Services for Blunk Knob Road Guardrail Installation (Des # 1801581) in Seymour District
Response Due Date & Time: May 19, 2021 at 4:00 PM EST -
Monroe County Bridge #629 Baby Creek Road (Des # 2002978) in Seymour District
Response Due Date & Time: May 14, 2021 at 12:00 pm -
Jennings County Highway Bridge #29 Over Sand Creek (Des # 2002992) in Seymour District.
Response Due Date & Time: May 17, 2021 at 4:00 PM -
Randolph County Board of Commissioners Preliminary Engineering and R/W Services for Bridge #85 (Des #2003057) in Greenfield District
Response Due Date & Time: May 13, 2021 at 3:00 PM -
Randolph County Board of Commissioners Preliminary Engineering and R/W Services for Bridge #32 (Des #2003056) in Greenfield District
Response Due Date & Time: May 13, 2021 at 3:00 PM -
City of Sullivan Sidewalks/Bike Trail - S Main Street from Jackson to the entrance to the City Park (Des # 2002974) in Vincennes District.
Response Due Date & Time: May 04, 2021 at 4:00 PM EST -
Floyd County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2023. (Des # 2100081) in the Seymour District.
Response Due Date & Time: May 05, 2021 at 4:00 PM EST -
Jefferson County Bridge 107 Replacement, Sugan Hollow Rd. (Des # 2002980) in the Seymour District.
Response Due Date & Time: May 04, 2021 at 2:00 PM -
City of West Lafayette Construction Inspection for Sagamore Parkway Trail Project (Des # 1401287) in Crawfordsville District
Response Due Date & Time: May 03, 2021 at 4:30 PM -
Noble County - HMA Structural Overlay - Old SR3 between Baseline Road and SR 205 (Des# 2002967) in the Fort Wayne District.
Response Due Date & Time: May 06, 2021 at 2:00 PM EST -
LaPorte County Government La Porte County Government-Bridge 104 Superstructure Replacement (Des # 2003036) in the LaPorte District.
Response Due Date & Time: May 10, 2021 at 2:00 PM -
Town of North Judson Sidewalks and ADA Ramp Upgrades along Campbell Ave, Weninger St, and George St and the Park (Des # 2003029) in the Laporte District.
Response Due Date & Time: April 30, 2021 at 3:00 PM -
Wells County Board of Commissioners – CR 200S Reconstruction and Rail Overpass between Adams Street and State Road 1 (Des # 2003077) in the Fort Wayne District.
Response Due Date & Time: May 13, 2021 at 2:00 PM local time -
Wells County Board of Commissioners – Replace County Bridge 71 carrying CR 200 West over Rock Creek (Des # 2003072) in the Fort Wayne District.
Response Due Date & Time: May 13, 2021 at 2:00 PM local time -
City of Goshen – Reconstruction of College Avenue from 9th Street to US 33 – Added TWTL and Multi-Use Path (Des # 2100021) in the Fort Wayne District.
Response Due Date & Time: April 30, 2021 at 3:00 PM -
Elkhart County - CR 36 over Yellow Creek Bridge 233 Replacement Project (Des # 2003071) in the Fort Wayne District.
Response Due Date & Time: April 30, 2021 at 3:00 PM -
Posey County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025 (Des # 2100104) in the Vincennes District.
Response Due Date & Time: April 26, 2021 at 3:30 PM -
Allen County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2100106) in the Fort Wayne District.
Response Due Date & Time: April 26, 2021 at 3:00 PM -
Wayne County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022 - 2025. (Des # 2100103) in the Greenfield District.
Response Due Date & Time: April 26, 2021 at 1:00 PM -
Orange County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2100108) in the Vincennes District.
Response Due Date & Time: April 19, 2021 at 12:00 PM -
Montgomery County, PE/CE Services for traffic sign replacement on various roads (Des # 2003016) in the Crawfordsville District.
Response Due Date & Time: April 16, 2021 at 3:00 PM -
Floyd County Right of Way Acquisition Services for Farnsley Knob Road Guardrail Installation (Des # 1801582) in Seymour District
Response Due Date & Time: April 19, 2021 at 4:00 PM EST -
Adams County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2100105) in the Fort Wayne District.
Response Due Date & Time: April 15, 2021 at 4:00 PM -
Starke County Preliminary Engineering and Construction Engineering for County Bridge #59, CR 700 S over Bogus Run Bridge 59 (Des # 2003040) in the LaPorte District.
Response Due Date & Time: April 16, 2021 at 2:30 PM CDT -
Floyd County Right of Way Acquisition Services for Blunk Knob Road Guardrail Installation (Des # 1801581) in Seymour District
Response Due Date & Time: April 19, 2021 at 4:00 PM EST -
Tippecanoe County Bridge 119 Deck Replacement (Des # 2003019) in the Crawfordsville District.
Response Due Date & Time: April 16, 2021 at 3:00 pm -
Clinton County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025 (Des # 2100062) in the Crawfordsville District.
Response Due Date & Time: April 12, 2021 at 12:00 pm -
City of Tell City Sidewalk and ADA Ramps on eastside of SR 66 from Washington Street to William Tell Blvd in Tell City Indiana (Des # 2002971) in the Vincennes District.
Response Due Date & Time: April 09, 2021 at 4:00 pm Central Time -
Boone County, PE & R/W Services for the construction of a roundabout at the intersection of CR 100 S and CR 400 E (Des # 2003020) in the Crawfordsville District.
Response Due Date & Time: April 15, 2021 at 10:00 AM -
Wabash County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2100111) in the Fort Wayne District.
Response Due Date & Time: April 12, 2021 at 9:00 AM -
Fulton County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025 (Des # 2100101) in the LaPorte District.
Response Due Date & Time: April 09, 2021 at 3:30 PM -
City of Logansport Sidewalks and ADA Ramp Upgrades around 3 Elementary Schools and New Junior High School (Des # 2003025) in the Laporte District.
Response Due Date & Time: April 12, 2021 at 3:00 PM -
Wabash County PE and ROW for Replacement of Wabash County Bridge #143 (Des # 2003065) in the Fort Wayne District.
Response Due Date & Time: April 15, 2021 at 2:00 PM -
Town of Highland Hawk pedestrian signal for the Erie Lackawanna Trail and Kennedy Ave intersection (Des# 2002582) in the LaPorte District.
Response Due Date & Time: April 12, 2021 at 10:00 AM CST -
Whitley County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2100085.) in the Fort Wayne District.
Response Due Date & Time: April 09, 2021 at 12:00 P.M. -
Hamilton County CMAQ Project to construct a dual lane roundabout, striped for single lane use at opening, with associated approach work at the intersection of 191st Street and Grassy Branch Road. Enclosed drainage within the limits of the roundabout outlets to a detention basin to be constructed south of the project with the basin outlet south to Cool Creek. (Des # 1700731) in Greenfield District
Response Due Date & Time: April 05, 2021 at 12:00 P.M. (Revised 3/9/2021) -
Delaware County – Construction Inspection Services - Rehabilitation of Bridge #193 – Memorial Drive over White River (Des # 2100088) in Greenfield District
Response Due Date & Time: March 25, 2021 at 12:00 P.M. -
Delaware County – PE & R/W Services - Rehabilitation of Bridge #193 – Memorial Drive over White River (Des # 2100088) in Greenfield District
Response Due Date & Time: March 25, 2021 at 12:00 P.M. -
Monroe County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025 (Des #2100084) in the Seymour District.
Response Due Date & Time: April 01, 2021 at 12:00 P.M. -
Lawrence County Replacement of Historic Bridge 172 (Des # 2002973) in Vincennes District
Response Due Date & Time: March 30, 2021 at 9:30 am -
City of Bedford Design of Replacement of Regulatory signs and warning signs throughout the City. (Des # 2002972) in Vincennes District
Response Due Date & Time: March 29, 2021 at 5:00 PM Eastern Time -
Wayne County Board of Commissioners Preliminary Engineering and R/W Services for Bridge #716 (Des # 2003063) in Greenfield District
Response Due Date & Time: March 25, 2021 at 1:00 PM -
Town of Burns Harbor RW Services for Marquette Greenway Trail – Phase 1A (Des #1601147) in La Porte District
Response Due Date & Time: March 22, 2021 at 5:00 PM CT -
Town of Cedar Lake 133rd Avenue & King Street Intersection Improvement (Des # 200023) in LaPorte District
Response Due Date & Time: March 09, 2021 at 3:00 PM Central -
Hancock County CE (Des # 1600949) in Greenfield District
Response Due Date & Time: March 23, 2021 at 3:00 PM -
City of Beech Grove Construction Inspection Services for the Thompson Road Multi-Use Trail project from 9th Avenue to Emerson Avenue (Des # 1801422) in Greenfield District
Response Due Date & Time: March 23, 2021 at 3:00 PM -
Kosciusko County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2022-2025. (Des # 2100083) in the Fort Wayne District.
Response Due Date & Time: March 18, 2021 at 1:00 PM -
Town of Ingalls CR 800 S (136th St) Corridor Improvement Project (Des # 2100092) in Greenfield District
Response Due Date & Time: March 16, 2021 at 4:00 PM -
City of Franklin Construction Inspection Services for Yandes Street Reconstruction Project (Des # 1801449) in Seymour District
Response Due Date & Time: March 18, 2021 at 2:00 pm local time -
City of Franklin Construction Inspection Services for Traffic Signal Preemption at various locations in Franklin (Des # 1901673) in Seymour District
Response Due Date & Time: March 18, 2021 at 2:00 pm local time -
City of Franklin Construction Inspection Services for Pedestrian Facilities at various locations on west side of Franklin (Des # 1902763) in Seymour District
Response Due Date & Time: March 18, 2021 at 2:00 pm local time -
City of Franklin Construction Inspection Services for Pedestrian Facilities on East Jefferson Street (Des # 2100071) in Seymour District
Response Due Date & Time: March 18, 2021 at 2:00 pm local time -
Johnson County Construction Engineering for roundabout at intersection of Saddle Club Road and Stones Crossing Road (Des # 1801452) in Seymour District
Response Due Date & Time: March 11, 2021 at 10:00 AM -
Johnson County Construction Engineering for bridge 38 superstructure replacement on Greensburg Road over Sugar Creek (Des # 1702954) in Seymour District
Response Due Date & Time: March 11, 2021 at 10:00 AM -
Johnson County Construction Engineering for bridge 602 replacement on Smith Valley Road over the LIRC railroad in Greenwood (Des # 1801455) in Seymour District
Response Due Date & Time: March 11, 2021 at 10:00 AM -
Johnson County Construction Engineering for bridge 136 complete replacement on Peterman Road over Pleasant Run Creek (Des # 1801454) in Seymour District
Response Due Date & Time: March 11, 2021 at 10:00 AM -
City of West Lafayette Soldiers Home Road Reconstruction from Old US 52 to Kalberer Road (Des # 1401291) in Crawfordsville District
Response Due Date & Time: March 17, 2021 at 8:30 AM EST -
City of Kokomo Intersection Improvement of Berkley and Lincoln (Des # 1900780) in Greenfield District
Response Due Date & Time: March 19, 2021 at 4:00 pm -
City of Kokomo Trail on Center Road between SR931 and Dixon Road (Des # 1901304) in Greenfield District
Response Due Date & Time: March 19, 2021 at 4:00 pm -
City of Westfield Construction Inspection Services (Des # 1700729) in Greenfield District
Response Due Date & Time: March 05, 2021 at 1:00 pm -
Fayette County CE for Bridge 90 on Waterloo Road over Lick CREEK (Des#1702761) in Greenfield District
Response Due Date & Time: March 05, 2021 at 4:00 pm -
Henry County HSIP Sign Replacement on Various Roads (Des # 1600958 & 1702758) in Greenfield District
Response Due Date & Time: February 12, 2021 at 2:00 pm -
Crawford County Replacement of Bridge #43 at Beechwood Rd (Des# 1400825) in Vincennes District
Response Due Date & Time: February 11, 2021 at 3:00 pm
Design Documents.zip -
Hancock County CE services (Des # 1802940) in Greenfield District
Response Due Date & Time: February 8, 2021 at 3:00 pm -
Hancock County PE and ROW services (Des # 1802940) in Greenfield District
Response Due Date & Time: February 8, 2021 at 3:00 pm -
City of Greenwood Inspection for School Zone Warning Signals/Pedestrian Crossing Signals Project (Des # 1801592) in Seymour District
Response Due Date & Time: February 12, 2021 at 5:00 pm Eastern -
Warrick County Construction Inspection for Br. 113 (Des # 1600739) in Vincennes District
Response Due Date & Time: February 9, 2021 at 4:00 pm CST -
City of South Bend Coal Line Trail (Phase I) from Lincoln Way West to Riverside Dr. (Des # 1401810) in LaPorte District
Response Due Date & Time: January 12, 2020 at 9:30 a.m Eastern Time Revised 01/08/21 -
Lake County Revise Environmental Document by Re-Opening Section 106 Consultation and Mitigation (Des # 0088990) in LaPorte District
Response Due Date & Time: February 4, 2021 at 1:00 pm CST Revised 01/13/21 -
Vigo County Design of Clinton Road Reconstruction from Park Avenue to Hasselburger Avenue (Des # 1901781) in Crawfordsville District
Response Due Date & Time: January 14, 2021 at 4:00 pm E.S.T -
City of Indianapolis, Department of Public Works, Construction Inspection for South Emerson Avenue from Stop 11 to Southport Crossing (Des # 1702976) in Greenfield District
Response Due Date & Time: January 15, 2021 at 3:00 pm E.S.T -
City of Indianapolis, Department of Public Works, Construction Inspection for Southport Rd and Mann Rd Intersection Improvements (Des # 1700905) in Greenfield District
Response Due Date & Time: January 15, 2021 at 3:00 pm E.S.T -
City of Indianapolis, Department of Public Works, Construction Inspection for Pedestrian Crash Focus, Area 11B (Des # 1801445) in Greenfield District
Response Due Date & Time: January 15, 2021 at 3:00 pm E.S.T -
City of Indianapolis, Department of Public Works, Construction Inspection for White River Trail – 10th St Connection (Des # 1700931) in Greenfield District
Response Due Date & Time: January 15, 2021 at 3:00 pm E.S.T -
City of Indianapolis, Department of Public Works, Construction Inspection for Safe Routes to Transit South (Des # 1700936) in Greenfield District
Response Due Date & Time: January 15, 2021 at 3:00 pm E.S.T -
City of Indianapolis, Department of Public Works, Construction Inspection for 16th Street over Little Eagle Creek (Des # 1700928) in Greenfield District
Response Due Date & Time: January 15, 2021 at 3:00 pm E.S.T -
City of Indianapolis, Department of Public Works, Construction Inspection for Emerson Avenue over Bean Creek (Des # 1801442) in Greenfield District
Response Due Date & Time: January 15, 2021 at 3:00 pm E.S.T -
City of Indianapolis, Department of Public Works, Construction Inspection for Pedestrian Crash Focus, Area 5B (Des # 1801443) in Greenfield District
Response Due Date & Time: January 15, 2021 at 3:00 pm E.S.T -
City of Indianapolis, Department of Public Works, Construction Inspection for 30th Street over White River (Des # 1700925) in Greenfield District
Response Due Date & Time: January 15, 2021 at 3:00 pm E.S.T -
City of Indianapolis, Department of Public Works, Construction Inspection for 29th Street over the Canal (Des # 1801441) in Greenfield District
Response Due Date & Time: January 15, 2021 at 3:00 pm E.S.T -
City of Indianapolis, Department of Public Works, Construction Inspection for College Avenue over the Canal (Des # 1801440) in Greenfield District
Response Due Date & Time: January 15, 2021 at 3:00 pm E.S.T -
City of Kendallville PE, RW, & CE Services for Drake Road (Des # 1902750) in Fort Wayne District
Response Due Date & Time: December 18, 2020 at 4:00 PM local time -
City of Madison Right of Way Acquisition Services for the Wilson Avenue Widening Project (Des # 1802886) in Seymour District
Response Due Date & Time: December 14, 2020 at 4:00 PM -
City of Kokomo Smith Road (300 N) Reconstruction (Des # 2002563) in Greenfield District
Response Due Date & Time: December 18, 2020 at 4:00 PM -
City of Bloomington Downtown Curb Ramps, PH III (Des # 1900403) in Seymour District
Response Due Date & Time: December 04, 2020 at 4:00 PM -
Monroe County, Bicentennial Trail (Des # 0902215) in Seymour District
Response Due Date & Time: November 20, 2020 at 3:00 PM -
City of Rushville Construction Inspection / Construction Engineering Services for the New Road Construction of Cherry Street (Des # 1600961) in Greenfield District.
Response Due Date & Time: November 23, 2020 at 4:00 PM -
Grant County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2021-2024. (Des # 1902079) in the Fort Wayne District.
Response Due Date & Time: November 18, 2020 at 2:00 PM -
City of Fort Wayne Added travel lanes on Hillegas Road between W. State Blvd. and W. Coliseum Blvd, urban street design including sidewalk and multi-use path (Des # 1901705) in Fort Wayne District.
Response Due Date & Time: October 30, 2020 at 4:00 PM -
City Of Evansville Construction inspection for emergency vehicle signal pre-emption project (Des # 1801969) in Vincennes District
Response Due Date & Time: October 23, 2020 at 1:00 PM Central -
Floyd County Right of Way Acquisition Services for Bridge #51 Replacement (Des #1700788) in Seymour District
Response Due Date & Time: October 26, 2020 at 4:00 PM EST -
Starke County Replacement of Bridge #137 on CR300E over the Yellow River (Des # 1902814) in LaPorte District
Response Due Date & Time: October 16, 2020 at 3:00 PM CST -
Vigo County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2021 – 2024. (Des # 1902071) in the Crawfordsville District.
Response Due Date & Time: October 09, 2020 at 4:00 PM EST -
Hamilton County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2021-2024. (Des # 1902072) in the Greenfield District.
Response Due Date & Time: October 02, 2020 at 4:00 PM -
Town of Merrillville Sidewalks on the east side of Broadway from 73rd Ave. to US 30 (Des # 1901949) in Laporte District
Response Due Date & Time: September 11, 2020 at 12:00 PM -
City of Columbus, Indiana - Construction Inspection for Taylor Road Phase 1 from 25th St. to 31st St. (Des # 0500875) in Seymour District
Response Due Date & Time: September 18, 2020 at 5:00 PM -
City of Bloomington Jackson Creek Trail Phase II (Des # 1500398) in Seymour District
Response Due Date & Time: September 04, 2020 at 4:00 PM -
Town of Culver 10 foot bike and pedestrian trail on Slate, Jefferson, and Cass Streets (Des # 2001807) in Laporte District
Response Due Date & Time: September 11, 2020 at 4:00 PM EDT -
City of Terre Haute Intersection improvement project at the intersection of Wabash Avenue and 13th Street, Terre Haute, Indiana (Des # 1901778) in Crawfordsville District
Response Due Date & Time: August 31, 2020 at 4:00 PM -
Henry County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2021-2024. (Des # 1902070) in the Greenfield District.
Response Due Date & Time: July 22, 2020 at 3:00 PM -
Jasper County Rehabilitation of Bridge 1002, Kentucky Street over Carpenter Creek, (Des# 1902808) in La Porte District
Response Due Date & Time: July 08, 2020 at 11:00 AM Central Time -
City of Portage Central Avenue between County Line Road and Willowcreek Road located in Portage, Indiana (Des # 1173430) in LaPorte District
Response Due Date & Time: July 17, 2020 at 2:00 PM CST -
St. Joseph County, Indiana, Douglas Road from Ivy Road to S.R. 23 near South Bend, IN. (Des # 1400639) in LaPorte District
Response Due Date & Time: July 28, 2020 at 10:00 AM -
Vermillion County, Br. 122, old SR 63 over Little Raccoon Creek & CSX Railroad (Des # 1902751) in Crawfordsville District
Response Due Date & Time: July 18, 2020 at 4:00 PM -
Jay County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2021-2024. (Des # 1902084) in the Greenfield District.
Response Due Date & Time: July 09, 2020 at 3:00 PM -
Town of Brownsburg Construction Inspection for Airport Rd. and Hornaday Rd Roundabout (Des # 1601056) in Crawfordsville District
Response Due Date & Time: June 26, 2020 at 4:00 PM -
Porter County Department of Development & Storm Water Management Bridge 1009 carrying Lenburg Road over Salt Creek (Des # 1902812) in LaPorte District
Response Due Date & Time: July 02, 2020 at 4:00 PM Central Time -
Porter County Department of Development & Storm Water Management Bridge 98 carrying 600 North over Salt C3eek (Des # 1902811) in LaPorte District
Response Due Date & Time: July 02, 2020 at 4:00 PM Central Time -
City of New Haven, Indiana, 13.1 Construction Inspection (Des # 1901812) in Fort Wayne District
Response Due Date & Time: June 26, 2020 at 4:00 PM -
City of Rockport Sidewalks on Main, Seminary, Lincoln 9th and 2nd St. (Des # 1600890) in Vincennes District
Response Due Date & Time: June 17, 2020 at 3:00 pm CST -
City of Bloomington Crosswalk Improvements Project (Des # 1700976) in Seymour District
Response Due Date & Time: June 11, 2020 at 4:00 pm local time (Revised 5/20/2020) -
Shelby County Board of Commissioners Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2021-2024. (Des # 1902080) in the Greenfield District.
Response Due Date & Time: June 15, 2020 at 4:00 PM -
Monroe; Curry Pike, Smith Pike, Woodyard Road Intersection Improvement; (Des # 1700733) in Seymour District
Response Due Date & Time: June 19, 2020 at 12:00 pm -
Monroe; Karst Farm Greenway, Ph 2B (Des # 1900405) in Seymour District
Response Due Date & Time: June 19, 2020 at 12:00 pm (Revised 5/18/2020) -
City of Westfield East Street North Extension from 196th Street to SR 38 (Des # 1700728) in Greenfield District
Response Due Date & Time: June 12, 2020 at 1:00 pm -
Hamilton County Highway Department Professional Engineering Design Services for 236th Street Widening and Rehabilitation from S.R. 38 to County Bridge #201 (Des # 1902800) in Greenfield District
Response Due Date & Time: June 12, 2020 at 4:00 pm
| Addendum Attachment | Preliminary Historic Bridge Alternatives Analysis | ||
Response Due Date & Time: April 22, 2022 at 12:00 pm |