Figure Title
  • 52-6A    Dusting

  • 52-6B    Block Cracking

  • 52-6C    Flushing

  • 52-6D    Longitudinal Cracking

  • 52-6E    Raveling

  • 52-6F    Reflective Cracking

  • 52-6G    Rutting

  • 52-6H    Shoulder Drop-off

  • 52-6 I    Thermal Cracking

  • 52-6 J   Alligator or Fatigue Cracking

  • 52-6K    Alkali-Silica Reactivity (ASR)

  • 52-6L    Corner Break

  • 52-6M    “D” Cracking

  • 52-6N    Joint Failure

  • 52-6 O   Longitudinal Cracking

  • 52-6P    PCCP Joint-Seal Failure

  • 52-6Q    Polishing

  • 52-6R    Popout

  • 52-6S    Punchout

  • 52-6T    Transverse Cracking

  • 52-6U    Spalling

  • 52-7A    Preliminary HMA Pavement Thickness

  • 52-7B    Preliminary PCCP Thickness

  • 52-7C    [figure deleted]

  • 52-7D    Falling-Weight-Deflectometer Testing

  • 52-7E    Pavement Coring

  • 52-8A    Pavement Design Life

  • 52-8B    Performance Criteria for HMA Pavement or Overlay

  • 52-8C    Performance Criteria for Concrete Pavement or Overlay

  • 52-8D    MEPDG General Input Values for Asphalt Pavement

  • 52-9A    ESAL Category for QC/QA-HMA Mixtures

  • 52-9B    Mixture Type for HMA Mixtures

  • 52-9C    PCCP Patching Limites

  • 52-10A   Outlet Protector Slope Limits

  • 52-10B   Video-Inspection Contract Quantities

  • 52-11A   HMA PMM Treatments

  • 52-11B   PCCP PM Treatments

  • 52-12A   [figure deleted]

  • 52-13A   Full-Depth HMA Pavement with Full Depth Shoulders

  • 52-13B   Full-Depth HMA Pavement with Composite Shoulders

  • 52-13C   [figure deleted]

  • 52-13D   Full-Depth HMA Pavement

  • 52-13E   Composite HMA / Compacted-Aggregate Pavement

  • 52-13F   PCCP Mainline with PCC Shoulder

  • 52-13G   PCCP Mainline with HMA Shoulder

  • 52-13H   PCCP with Concrete Curb

  • 52-13 I   Overlay, Tilt to Crown Section

  • 52-13 J   Overlay, Crown to Crown Section

  • 52-13K   Retrofit Underdrain

  • 52-13L   Underdrain for HMA Mainline with Composite Shoulders

  • 52-13M   Underdrain for HMA Mainline with Full-Depth HMA Shoulders

  • 52-13N   Concrete Curb and Gutter for HMA Pavement with Underdrain

  • 52-13 O  Concrete Curb and Gutter for HMA Pavement without Underdrain

  • 52-13P   PCCP with Underdrain

  • 52-13Q   Curbed PCCP with Underdrain

  • 52-13R   Longitudinal-Joint Options for Median Side of Concrete Pavement

  • 52-13S   Full-Depth HMA Ramp

  • 52-13T   PCCP Ramp

  • 52-13U   Ramp with Overlay

  • 52-13V   HMA Pavement with Concrete Curb and Underdrain

  • 52-13W   HMA Pavement with Concrete Curb and No Underdrain

  • 52-13X   Parking-Lot Pavement Sections

  • 52-14A   Editable Pavement-Design Request — INDOT Project

  • 52-14B   Editable Pavement-Design Request — LPA Project

  •