INDIANA DEPARTMENT OF TRANSPORTATION                                    PAGE 1
                                                   NOTICE TO HIGHWAY CONTRACTORS
 
                             DATE OF LETTING: May 25, 2004
                             TIME OF LETTING: 10:00 AM  EASTERN STANDARD
 
 
 
Sealed proposals for certain highway improvements as described below will be received from contractors holding a valid Certificate
of Qualification issued by the Indiana Department of Transportation.
 
==================================================================================================================================
          LOCATION OF DEPOSIT: Indiana Department of Transportation, Mr. Michael R. Beuchel, Contract Services Manager,
                               Room N855, Government Center North, 100 North Senate Avenue, Indianapolis, IN 46204-2218
 
          LOCATION OF OPENING: All proposals will immediately thereafter be taken to the Auditorium, Government Center South,
                               402 West Washington Street, Indianapolis, Indiana where they will be publicly opened and read.
==================================================================================================================================
 
Contract documents may be purchased at the office of the Indiana Department of Transportation, Room N855, Government Center North,
100 North Senate Avenue, Indianapolis, IN  46204-2218, telephone 317-232-5070, fax 317-232-0676.  Checks should be made
payable to the Indiana Department of Transportation.  No refunds will be made for material returned except in cases of error in
filling orders.  Sample proposals may be purchased for twelve dollars and fifty cents ($12.50) each.  Bidding proposals will be
issued until 4:30 P.M., eastern standard time, the last work day preceding the bid opening date.  Bids will be considered as
provided for in the Prequalification and Bidding Regulations on file.  Copies are available in Room N855, Government Center North.
 
Contract documents may be examined in Room N855, Government Center North, 100 North Senate Avenue, Indianapolis, Indiana.
 
An executed bid bond and an executed performance bond shall be included with the bid except on contracts for roadside mowing,
vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of
$100,000 or less, the bidder may elect not to furnish a performance bond.
 
All projects are to be constructed in accordance with the applicable Federal, State and Local laws.  On applicable Federal Aid
projects, the Work Hours Act of 1962 (Public Law 87-851) and the Davis-Bacon Act of 1968 and any subsequent amendments to these
Acts will apply.  The Indiana Department of Transportation hereby notifies all bidders that minority business enterprises will be
afforded full opportunity to submit bids in response to the invitation and will not be discriminated against on the grounds of
race, color, sex, or national origin in consideration for award.
 
                                                  ********************************
                                                  * MINORITY BUSINESS ENTERPRISE *
                                                  ********************************
 
  On Non-Federal-Aid Construction contracts, Indiana Department of Transportation (INDOT) encourages utilization of minority
  business enterprises (MBEs) in bids; however, award of such contracts will not be based upon achievement of any specific goal.
 
  "Minority business enterprise" or "minority business" means an individual, partnership, corporation, limited liability company,
  or joint venture of any kind that is owned and controlled by one (1) or more persons who are: (1) United States citizens; and
  (2) member of a racial minority group.
 
  "Owned and controlled" means having: (1) ownership of at least fifty-one percent of the enterprise, including corporate stock
  of a corporation; (2) control over the management and active in the day-to-day operations of the business; and (3) an interest in
  the capital, assets, and profits and losses of the business proportionate to the percentage of ownership.
 
  "Racial minority group" means: (1) Blacks; (2) American Indians; (3) Hispanics; (4) Asian Americans; and (5) other similar racial
  minority groups.
 
                                                          INTERNET ADDRESS
 
For additional information, visit the INDOT Contract Services website at www.state.in.us/dot/div/contracts/letting/index.html

                                                                                                                           PAGE   1
                                           NOTICE TO CONTRACTORS -- May 25, 2004       LETTING
___________________________________________________________________________________________________________________________________
 
CALL 100     CONTRACT R -27383-A       DESIGN/BUILD OF ADDED TRAVEL LANES, SIGNING, LIGHTING LAPORTE DISTRICT              PG. 1
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9910800            |  0801168                         ADDED TRAVEL LANES
				       	                         LAKE COUNTY - ON I-80 FROM 0.8 km EAST OF SR 912 TO 0.6 km
					                         WEST OF MARTIN LUTHER KING DR.(RP 005+040 TO 010+048)
	
       COMPLETION DATE:  May 15, 2006                  DBE GOAL:   4.0 QUALIFICATIONS: A(A)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    43.00         X-SECT: $    60.00                      0.00
       TRAFFIC ITEMS:     PLANS: $    23.60

  NOTE:  THIS CONTRACT WAS PREVIOUSLY ADVERTISED FOR THIS LETTING.
___________________________________________________________________________________________________________________________________
 
CALL 170     CONTRACT R -25395-A       PAVEMENT REPLACEMENT, BRIDGE REHABILITATION, SIGNALS, SIGNS VINCENNES DISTRICT      PG. 2
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           8720865            |  0122010                         PAVEMENT REPLACEMENT
				       	                         VANDERBURGH COUNTY - ON STATE ROAD 66 FROM 0.3 MILE WEST OF
					                         ST. JOSEPH AVENUE TO PIEGON CREEK (RP 021+090 TO 024+012)
	
           9020866            |  0122010                         BRIDGE REHABILITATION - STR. NO. 460-82-4630, CONTINUOUS
                                                                 PRESTRESSED CONCRET I BEAM, TOTAL LENGTH 46.999 m
				       	                         VANDERBURGH COUNTY - ON STATE ROAD 66 OVER LOCUST CREEK,
					                         2.9 MILES WEST OF US 41(RP 022+072)
	
           9020867            |  0122010                         BRIDGE REHABILITATION - STR. NO. 460-82-4790, CONTINUOUS
                                                                 PRESTRESSED CONCRETE I-BEAM, 3 SPANS, TOTAL LENGTH 37.402 m
				       	                         VANDERBURGH COUNTY - ON STATE ROAD 66 OVER GROVE AVENUE,
					                         2.73 MILES WEST OF US 41 (RP 022+085)
	
           9020868            |  0122010                         BRIDGE REHABILITATION - STR NO. 460-82-2289, CONTINUOUS
                                                                 COMPOSITE STEEL BEAM, 3 SPANS, TOTAL LENGTH 47.241 m
				       	                         VANDERBURGH COUNTY - ON STATE ROAD 66 OVER CSX RAILROAD,
					                         2.68 MILES WEST OF US 41 (RP 022+090)
	
           9020869            |  0122007                         BRIDGE REMOVAL - STR. NO. 460-82-2288, CONTINUOUS STEEL
                                                                 BEAM, 3 SPANS, TOTAL 42.26 m
				       	                         VANDERBURGH COUNTY - ON STATE ROAD 66 OVER ABANDONED
					                         RAILROAD, 2.57 MILES WEST OF US 41 (RP 023+001)
	
           9020872            |  0122010                         BRIDGE REHABILITATION - STR. NO. 460-82-4629, CONTINUOUS
                                                                 COMPOSITE STEEL BEAM, 5 SPANS, TOTAL LENGTH 109.753 m
				       	                         VANDERBURGH COUNTY - ON STATE ROAD 66 OVER PIGEON CREEK,
					                         1.46 MILES WEST OF US 41 (RP 024+012)
	
           9400120            |  0122010                         TRAFFIC SIGNAL MODERNIZATION
				       	                         VANDERBURGH COUNTY - ON STATE ROAD 66 AT ST JOSEPH STREET
					                         (RP 022+020)
	
           9400220            |  0122010                         TRAFFIC SIGNAL MODERNIZATION

                                                                                                                         PAGE   2
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
				       	                         VANDERBURGH COUNTY - ON STATE ROAD 66 AT FIFTH AVENUE
					                         (RP 023+017)
	
           9400320            |  0122010                         TRAFFIC SIGNAL MODERNIZATION
				       	                         VANDERBURGH COUNTY - ON STATE ROAD 66 AT FIRST AVE.
					                         (RP 023+065)
	
           942086X            |  0122010                         SIGN INSTALLATION, NEW
				       	                         VANDEDBURGH COUNTY - ON STATE ROAD 66 FROM 0.3 MILE WEST OF
					                         ST. JOSEPH AVE TO PIGEON CREEK (RP 021+090 TO 024+012)
	
       COMPLETION TIME:   250   WORK DAYS              DBE GOAL:   5.0 QUALIFICATIONS: A(B)  C(B)  D(C)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    26.80         X-SECT: $    14.60                      0.00
       BRIDGE ITEMS:      PLANS: $    15.20         X-SECT: $     0.00
       TRAFFIC ITEMS:     PLANS: $     6.20
 
___________________________________________________________________________________________________________________________________
 
CALL 180     CONTRACT R -25397-A       PAVEMENT REPLACEMENT, TRAFFIC SIGNAL MODERNIZATION, SIGNS GREENFIELD DISTRICT       PG. 7
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0001110            |  1202011                         PAVEMENT REPLACEMENT
				       	                         HOWARD COUNTY - ON STATE ROAD 22 FROM EAST OF DIXON ROAD TO
					                         WASHINGTON STREET(011+048 TO 014+011)
	
           8677420            |  1202007                         PAVEMENT REPLACEMENT
				       	                         HOWARD COUNTY - ON STATE ROAD 22 FROM COUNTY ROAD 300 WEST
					                         TO EAST OF DIXON ROAD (RP 011+048 TO 014+011)
	
           9711090            |  1202011                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         HOWARD COUNTY - ON STATE ROAD 22 AT MALFALFA ROAD
					                         (RP 011+048)
	
           9711100            |  1202011                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         HOWARD COUNTY - ON STATE ROAD 22 AT DIXON ROAD
					                         (RP 012+047)
	
           9711120            |  1202011                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         HOWARD COUNTY - ON STATE ROAD 22 AT PHILLIPS STREET
					                         (RP 013+048)
	
           9711130            |  1202011                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         HOWARD COUNTY - ON STATE ROAD 22 AT BERKELY ROAD
					                         (RP 012+097)
	
           977742X            |  1202011                         SIGN MODERNIZATION
				       	                         HOWARD COUNTY - ON STATE ROAD 22 FROM COUNTY ROAD 300 WEST
					                         TO WASHINGTON STREET (RP 011+048 TO 014+011)
	
       COMPLETION DATE:  November 17, 2006             DBE GOAL:   8.0 QUALIFICATIONS: B(A)  C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    26.60         X-SECT: $    20.00                      0.00
       TRAFFIC ITEMS:     PLANS: $     3.60

                                                                                                                         PAGE   3
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
 
___________________________________________________________________________________________________________________________________
 
CALL 190     CONTRACT R -25756-A       PAVEMENT REPLACEMENT, TRAFFIC SIGNAL AND SIGN MODERNIZATION LAPORTE DISTRICT        PG. 11
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           8720595            |  2261026                         PAVEMENT REPLACEMENT
				       	                         LAKE COUNTY - ON US 12 FROM WESTBOUND RAMP TO I-90 TO EAST
					                         JCT. WITH US12/US20(RP 015+080 TO 016+071)
	
           9703540            |  2261026                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         LAKE COUNTY - ON US 12 AT 7TH AVENUE (RP 016+017)
					
	
           9703550            |  2261026                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         LAKE COUNTY - ON US 12 A  US 20, MELTON RD.(RP 016+071)
					
	
           972059X            |  2261026                         SIGN MODERNIZATION
				       	                         LAKE COUNTY - ON US 12 FROM WESTBOUND RAMP TO I-90 TO EAST
					                         JCT. WITH US 20(RP 015+080 TO 016+071)
	
       COMPLETION DATE:  August 29, 2005               DBE GOAL:   5.0 QUALIFICATIONS: A(B)  C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    15.20         X-SECT: $     0.00                      0.00
       TRAFFIC ITEMS:     PLANS: $     1.40
 
___________________________________________________________________________________________________________________________________
 
CALL 200     CONTRACT R -26131-A       ADDED TRAVEL LANES, SIGNS, TRAFFIC SIGNAL MODERNIZATIONS GREENFIELD DISTRICT        PG. 14
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0200340            |  0821016                         SIGNING
				       	                         MARION COUNTY - ON US 52 FROM I-465 TO POST ROAD (RP 092+062
					                         TO 093+095)
	
           8354330            |  0821016                         ADDED TRAVEL LANES
				       	                         MARION COUNTY - ON US 52 FROM I-465 TO POST ROAD (RP 092+062
					                         TO 093+095)
	
           955433A            |  0821016                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         MARION COUNTY - ON US 52 AT FRANKLIN ROAD
					
	
           955433B            |  0821016                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         MARION COUNTY - ON US 52 AT POST ROAD
					
	
       COMPLETION DATE:  November 14, 2005             DBE GOAL:   8.0 QUALIFICATIONS: B(A)  C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    23.40         X-SECT: $     9.80                      0.00
       TRAFFIC ITEMS:     PLANS: $     2.00

                                                                                                                         PAGE   4
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
 
___________________________________________________________________________________________________________________________________
 
CALL 210     CONTRACT R -26295-A       ROAD RECONSTRUCTION AND SIGNALS                       GREENFIELD DISTRICT           PG. 19
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100737            |  B585004                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         MARION COUNTY - ON SOUTHPORT ROAD AT STATE ROAD 37
					
	
           0100739            |  B585003                         TRAFFIC SIGNAL, NEW
				       	                         MARION COUNTY - ON SOUTHPORT ROAD AT HARDING STREET
					
	
           0100740            |  B585002                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         MARION COUNTY - ON SOUTHPORT ROAD AT BLUFF ROAD
					
	
           9981250            |  B585005                         ROAD RECONSTRUCTION
				       	                         MARION COUNTY - ON SOUTHPORT ROAD FROM STATE ROAD 37 TO
					                         BLUFF ROAD
	
       COMPLETION DATE:  September 26, 2005            DBE GOAL:   6.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    10.60         X-SECT: $     6.40                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 220     CONTRACT R -26347-A       ENHANCEMENT, BIKE/PEDESTRIAN FACILITIES AND NEW ROAD  CRAWFORDSVILLE DISTRICT       PG. 22
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0101297            |  9979019                         ENHANCEMENT, BIKE/PEDESTRIAN FACILITIES
				       	                         TIPPECANOE COUNTY - ON WABASH HERITAGE TRAIL AT PROPHETSTOWN
					                         STATE PARK
	
           0300822            |  6743117                         NEW ROAD CONSTRUCTION
				       	                         TIPPECANOE COUNTY - IN PROPHETSTOWN STATE PARK, 1.8 MILES
					                         NORTHEAST OF SR 225
	
       COMPLETION TIME:    50   WORK DAYS              DBE GOAL:   5.0 QUALIFICATIONS: B(A)  C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     9.00         X-SECT: $     4.20                      0.00
 
  NOTE:  PRE-BID CONFERENCE INFORMATION ON PAGE 22.
___________________________________________________________________________________________________________________________________
 
CALL 230     CONTRACT R -27136-A       ROAD REHABILITATION                                   GREENFIELD DISTRICT           PG. 23
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0300083            |  2497013                         ROAD REHABILITATION
				       	                         JAY AND RANDOLPH COUNTIES - ON US 27 FROM 0.37 MILE NORTH

                                                                                                                         PAGE   5
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
					                         OF SR 28 TO 1.09 MILES SOUTH OF SR 26(RP 054+032 TO 063+047)
	
       COMPLETION DATE:  December 03, 2004             DBE GOAL:   3.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     8.00         X-SECT: $    42.80                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 240     CONTRACT R -27159-A       ADDED TRAVEL LANES, SIGNALS, SIGNS                    LAPORTE DISTRICT              PG. 25
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0300918            |  0191024                         TRAFFIC SIGNAL MODERNIZATION
				       	                         LAKE COUNTY - ON US 41 AT 67TH STREET IN SCHERERVILLE
					                         (RP 263+057)LLE
	
           953362A            |  0194024                         TRAFFIC SIGNAL MODERNIZATION
				       	                         LAKE COUNTY - ON US 41 AT 77TH AVENUE IN SCHERERVILLE
					                         (RP 262+035)
	
           953362B            |  0194024                         TRAFFIC SIGNAL MODERNIZATION
				       	                         LAKE COUNTY - ON US 41 AT DEER CREEK/65TH AVE.
					                         IN SCHERERVILLE (RP 263+084)
	
           973362A            |  0194024                         TRAFFIC SIGNAL MODERNIZATION
				       	                         LAKE COUNTY - ON US 41 AT WILLOW BROOK DR. IN
					                         IN SCHERERVILLE (RP 264+000)
	
           973362D            |  0194024                         TRAFFIC SIGNAL MODERNIZATION
				       	                         LAKE COUNTY - ON US 41 AT MORAINE TRACE/SHERWOOD LAKE
					                         DRIVE IN SCHERERVILLE (RP 262+067)
	
           9966170            |  0194024                         ADDED TRAVEL LANES
				       	                         LAKE COUNTY - ON US 41 FROM 77TH AVENUE TO WILLOWBROOK
					                         DRIVE IN SCHERERVILLE (RP 262+035 TO 265+040)
	
           996617X            |  0194024                         TRAFFIC SIGNS, NEW
				       	                         LAKE COUNTY - ON US 41 FROM 77TH AVENUE TO JUST SOUTH OF E
					                         AND J RAILROAD IN SCHERERVILLE (RP 262+035 TO 264+021)
	
       COMPLETION DATE:  October 15, 2005              DBE GOAL:  11.0 QUALIFICATIONS: B(A)  C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    22.80         X-SECT: $    16.60                      0.00
       TRAFFIC ITEMS:     PLANS: $     2.20
 
___________________________________________________________________________________________________________________________________
 
CALL 250     CONTRACT R -27202-A       ADDED TRAVEL LANES, SIGNS, AND SIGNALS                GREENFIELD DISTRICT           PG. 29
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0300859            |  0437006                         TRAFFIC SIGNAL, NEW
				       	                         MARION COUNTY - ON US 36 AT CARROLL ROAD(RP 074+012 TO
					                         076+022)

                                                                                                                         PAGE   6
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
	
           9633586            |  0437006                         ADDED TRAVEL LANES
				       	                         MARION COUNTY - ON US 36 FROM 0.2 MILE EAST OF OAKLANDON
					                         RD. TO 0.18 MILE EAST OF CO RD 750N.(RP 074+012 TO 076+022)
	
           973358A            |  0437006                         SIGN MODERNIZATION
				       	                         MARION COUNTY - ON US 36 FROM 0.2 MILE EAST OF OAKLANDON
					                         RD TO 0.18 MILE EAST OF CO RD 750N.(RP 074+012 TO 076+022)
	
           983358A            |  0437006                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         MARION COUNTY - ON US 36 AT 65TH STREET (074+039)
					
	
       COMPLETION DATE:  October 28, 2005              DBE GOAL:   8.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    25.40         X-SECT: $    11.40                      0.00
       TRAFFIC ITEMS:     PLANS: $     4.80
 
___________________________________________________________________________________________________________________________________
 
CALL 260     CONTRACT R -27214-A       NEW ROAD CONSTRUCTION                                 GREENFIELD DISTRICT           PG. 33
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0090050            |  9949040                         NEW ROAD CONSTRUCTION
				       	                         MARION COUNTY - ON AMERIPLEX PARKWAY FROM DECATUR BLVD TO
					                         STANLEY ROAD
	
           0400147            |  9949094                         NEW ROAD CONSTRUCTION
				       	                         MARION COUNTY - ON AMERIPLEX PARKWAY FROM JUST WEST OF
					                         STANLEY ROAD TO JUST EAST OF STANLEY ROAD(450 FT.)
	
       COMPLETION DATE:  May 23, 2005                  DBE GOAL:   6.0 QUALIFICATIONS: A(B)  C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    12.40         X-SECT: $     4.20                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 280     CONTRACT R -27273-A       PAVEMENT REPLACEMENT, ENHANCEMENT AND SIGNAL MODERNIZATION CRAWFORDSVILLE DISTRICT  PG. 36
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0101103            |  4223002                         PAVEMENT REPLACEMENT
				       	                         FOUNTAIN COUNTY - ON US 136 FROM WASHINGTON STREET TO 4TH
					                         STREET AROUND COURTHOUSE SQUARE (RP 007+081 TO 007+097)
	
           0101344            |  3086003                         ENHANCEMENT, STREETSCAPE
				       	                         FOUNTAIN COUNTY - ON US 136 AT COURTHOUSE SQUARE IN
					                         COVINGTON(RP 007+001)
	
           0200365            |  4223003                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         FOUNTAIN COUNTY - ON US 136 AT 4TH STREET (RP 007+096)
					
	

                                                                                                                         PAGE   7
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
       COMPLETION DATE:  November 05, 2004             DBE GOAL:   5.0 QUALIFICATIONS: A(B)  C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    14.60         X-SECT: $     0.00                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 300     CONTRACT R -27439-A       ASPHALT RESURFACE                                     VINCENNES DISTRICT            PG. 39
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0300802            |  6753602                         ASPHALT RESURFACE
				       	                         DAVIESS COUNTY - GLENDALE FISH AND WILDLIFE AREA, 5.8 MILES
					                         WEST OF US 231 ON EAST FORKWHITE RIVER
	
       COMPLETION DATE:  May 15, 2005                  DBE GOAL:   0.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     6.80         X-SECT: $     0.00                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 310     CONTRACT R -27472-A       PAVEMENT REPLACEMENT AND NEW ROAD CONSTRUCTION        GREENFIELD DISTRICT           PG. 40
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9980520            |  IN48032                         PAVEMENT REPLACEMENT AND NEW ROAD CONSTRUCTION
				       	                         HAMILTON COUNTY - ON 122 STREET FROM PENNSYLVANIA STREET TO
					                         ADAMS STREET/CARMEL GARDEN STREET
	
       COMPLETION DATE:  August 19, 2005               DBE GOAL:   1.0 QUALIFICATIONS: B(A)  C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    10.20         X-SECT: $     9.60                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 320     CONTRACT R -27490-A       RUBBLIZING PCCP AND ASPHALT RESURFACE                 VINCENNES DISTRICT            PG. 43
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0003190            |  0175031                         SIGN MODERNIZATION
				       	                         SULLIVAN COUNTY - ON US 41 FROM 1.04 MILES SOUTH OF SR 58
					                         TO 1.7 MILES SOUTH OF SR 154(RP 075+037 TO 083+895)
	
           0012110            |  0175035                         BRIDGE DECK OVERLAY, STR. NO. 41-77-5778NBL AND SBL, CONTIN.
                                                                 REINFORCED CONCRET SLAB, TOTAL LENGTH 91.02
				       	                         SULLIVAN COUNTY - ON US 41 OVER BRANCH OF BUCK CREEK, 1.9
					                         MILE SOUTH OF STATE ROAD 154 (RP 084+039)
	
           0012120            |  0175031                         REPLACE SUPERSTRUCTURE, STR. NO. 41-77-3864C AND JC, CONTIN.
                                                                 COMPOSITE STEEL BEAM, CONTIN. STEEL BEAM, TOTAL LENGTH 163LF
				       	                         SULLIVAN COUNTY - ON US 41 OVER MIDDLE FORK CREEK, 1.46
					                         MILES NORTH OF SR 58(RP 077+085)
	

                                                                                                                         PAGE   8
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
           9707080            |  0175031                         RUBBLIZIZING PCCP AND ASPHALT RESURFACE
				       	                         SULLIVAN COUNTY - ON US 41 FROM 1.04 MILES SOUTH OF SR 58
					                         TO 1.7 MILES SOUTH OF SR 154(RP 075+037 TO 083+895)
	
       COMPLETION TIME:   280   WORK DAYS              DBE GOAL:   3.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    31.40         X-SECT: $    14.20                      0.00
       BRIDGE ITEMS:      PLANS: $     6.00         X-SECT: $     0.00
       TRAFFIC ITEMS:     PLANS: $     9.40
 
___________________________________________________________________________________________________________________________________
 
CALL 330     CONTRACT R -27491-A       RUBBLIZING PCCP AND ASPHALT RESURFACE                 VINCENNES DISTRICT            PG. 48
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0200198            |  01750AB                         LIGHTING MODERNIZATION
				       	                         SULLIVAN COUNTY - ON US 41 FROM AT SR 154 (RP 084+011)
					
	
           0200199            |  01750AB                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         SULLIVAN COUNTY - ON US 41 AT STATE ROAD 154 (RP 084+011)
					
	
           0400135            |  0175037                         SIGN MODERNIZATION
				       	                         SULLIVAN COUNTY - ON US 41 FROM 1.7 MILES SOUTH OF SR 154
					                         TO 1.4 MILES SOUTH OF SR 48(RP 083+895 TO 090+098)+098)
	
           9707070            |  0175037                         RUBBLIZING PCCP PAVEMENT AND ASPHALT RESURFACE
				       	                         SULLIVAN COUNTY - ON US 41 FROM 1.7 MILES SOUTH OF SR 154
					                         TO 1.4 MILES SOUTH OF STATE ROAD 48 (RP 083+895 TO 090+098)
	
       COMPLETION TIME:   240   WORK DAYS              DBE GOAL:   3.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    25.40         X-SECT: $    19.40                      0.00
       TRAFFIC ITEMS:     PLANS: $     8.40
 
___________________________________________________________________________________________________________________________________
 
CALL 350     CONTRACT R -27520-A       ASPHALT RESURFACE AND SHOULDER REHABILITATION         FT. WAYNE DISTRICT            PG. 52
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0300923            |  5357003                         ASPHALT RESURFACE AND SHOULDER REHABILITATION
				       	                         NOBLE COUNTY - ON SR 3 FROM THE END OF THE CONCRETE SECTION
					                         TO 0.2 MILE NORTH OF SR 8(RP 193+043 TO 198+084)
	
       COMPLETION DATE:  October 15, 2004              DBE GOAL:   5.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 

                                                                                                                         PAGE   9
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
___________________________________________________________________________________________________________________________________
 
CALL 356     CONTRACT R -27604-A       ROAD REPLACEMENT AND PARKING LOT                      FT. WAYNE DISTRICT            PG. 54
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0300803            |  6744206                         ROAD REPLACEMENT AND PARKING LOT
				       	                         WELLS COUNTY - IN OUABACHE STATE PARK AT STATE ROAD 210 AND
					                         STATE ROAD 216
	
       COMPLETION DATE:  October 01, 2004              DBE GOAL:   0.0 QUALIFICATIONS: B(A)  C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     2.60         X-SECT: $     0.00                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 360     CONTRACT R -27624-A       DEMOLITION OF HOUSES AND BUILDINGS                    SEYMOUR DISTRICT              PG. 55
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0400306            |  0303OAB                         DEMOLITION OF HOUSES AND BUILDINGS
				       	                         WASHINGTON COUNTY - ON US 150 AT WASHINGTON SCHOOL ROAD,
					                         4.64 MILES WEST OF SR 135(RP 152+037)
	
       COMPLETION DATE:  September 30, 2004            DBE GOAL:   0.0 QUALIFICATIONS: C(B)  E(T)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     1.60         X-SECT: $     0.00                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 370     CONTRACT R -27626-A       DEMOLITION OF HOUSES AND BUILDINGS                    GREENFIELD DISTRICT           PG. 56
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0400310            |  0437001                         DEMOLITION OF HOUSES AND BUILDINGS
				       	                         MARION COUNTY - ON US 36 FROM JUST WEST OF I-465 TO JUST
					                         EAST OF POST ROAD(RP 068+072 TO 070+075)
	
       COMPLETION DATE:  September 03, 2004            DBE GOAL:   0.0 QUALIFICATIONS: C(B)  E(T)  0388
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     2.80         X-SECT: $     0.00                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 390     CONTRACT RS-27319-A       ASPHALT RESURFACE                                     CRAWFORDSVILLE DISTRICT       PG. 57
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0200580            |  386700G                         ASPHALT RESURFACE
				       	                         PUTNAM COUNTY - ON US 40 FROM US 231 TO SR 75
					                         (RP 039+098 TO 048+045)

                                                                                                                         PAGE  10
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
	
       COMPLETION DATE:  November 10, 2004             DBE GOAL:   0.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 400     CONTRACT B -24576-A       BRIDGE REHABILITATION                                 GREENFIELD DISTRICT           PG. 59
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9609600            |  2495009                         BRIDGE DECK OVERLAY, STR. 27-68-5104, REINFORCED CONCRETE
                                                                 GIRDER, 3 SPANS TOTAL LENGTH 41.148 m
				       	                         RANDOLPH COUNTY - ON US 27 OVER THE OLD CHANNEL OF THE
					                         MISSISSINEWA RIVER, 0.37 MILE NORTH OF SR 28 (RP 54+036)
	
           9800290            |  2497008                         BRIDGE DECK REPLACEMENT AND WIDENING, STR. 27-68-5103,
                                                                 CONTINUOUS STEEL BEAM, 3 SPANS TOTAL LENGTH 59.436 m
				       	                         RANDOLPH COUNTY - ON US 27 OVER THE MISSISSINEWA RIVER, 0.18
					                         MILE NORTH OF SR 28 (RP 54+013)
	
       COMPLETION TIME:   110   WORK DAYS              DBE GOAL:  12.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     8.00         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 410     CONTRACT B -25747-A       BRIDGE REHABILITATION & NEW PEDESTRIAN STRUCTURE      FT. WAYNE DISTRICT            PG. 61
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9406690            |  2311005                         DECK RECONSTRUCTION, STR. 1-90-0230B, REINFORCED CONCRETE
                                                                 ARCH, 4 SPANS TOTAL LENGTH 87.784 m
				       	                         WELLS COUNTY - ON SR 1 OVER THE WABASH RIVER, 0.1 MILE NORTH
					                         OF SR 124 (RP 125+11)
	
       COMPLETION DATE:  June 19, 2005                 DBE GOAL:   5.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     6.00         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 420     CONTRACT B -26256-A       BRIDGE REPLACEMENT                                    CRAWFORDSVILLE DISTRICT       PG. 63
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9230400            |  3384005                         BRIDGE REPLACEMENT, STR. 63-84-7808, CONTINUOUS REINFORCED
                                                                 CONCRETE SLAB, 3 SPANS TOTAL LENGTH 21.00 m
				       	                         VIGO COUNTY - ON SR 63 OVER HAYWORTH SLOUGH, 8.85 km NORTH
					                         OF SR 246 (RP 21+083)
	
       COMPLETION TIME:   115   WORK DAYS              DBE GOAL:   7.0 QUALIFICATIONS: B(A)  D(A)
 

                                                                                                                         PAGE  11
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     5.20         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 426     CONTRACT B -27303-A       ROAD CONSTRUCTION AND BRIDGE CONSTRUCTION             LAPORTE DISTRICT              PG. 65
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0300701            |  IN17001; IN48053                NEW BRIDGE - STR. NO. LAKE COUNTY 370, CONTINUOUS COMPOSITE
                                                                 PRESTRESSED CONCRETE BULB T, 3 SPANS, TOTAL LENGTH 290.5 LFT
				       	                         LAKE COUNTY - ON NEW ACCESS ROAD OVER EJ AND J RAILROAD
					
	
           9380960            |  0045001                         NEW ROAD CONSTRUCTION
				       	                         LAKE COUNTY - GARY MARINA ACCESS ROAD FROM US 12/20 TO LAKE
					                         MICHIGAN RAMP TO GARAGE
	
       COMPLETION DATE:  May 16, 2005                  DBE GOAL:   6.0 QUALIFICATIONS: C(B)  D(C)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     9.20         X-SECT: $     0.00                      0.00
       BRIDGE ITEMS:      PLANS: $     5.40         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 430     CONTRACT B -27354-A       BRIDGE REHABILITATION                                 LAPORTE DISTRICT              PG. 69
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100387            |  1475042                         BRIDGE DECK OVERLAY, STR. 35-66-6519, CONTINUOUS STEEL
                                                                 GIRDER, 3 SPANS TOTAL LENGTH 351 FT
				       	                         PULASKI COUNTY - ON US 35 OVER TIPPECANOE RIVER, 1.94 MILES
					                         SOUTH OF SR 119 (RP 153+21)
	
       COMPLETION DATE:  October 29, 2004              DBE GOAL:   7.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     2.40         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 440     CONTRACT B -27355-A       BRIDGE REHABILITATION                                 LAPORTE DISTRICT              PG. 71
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100389            |  3737019                         BRIDGE DECK OVERLAY, STR. 231-37-4980, CONTINUOUS
                                                                 PRESTRESSED CONCRETE I BEAM, 5 SPANS TOTAL LENGTH 318.08 FT
				       	                         JASPER & PORTER COUNTIES - ON US 231 OVER THE KANKAKEE RIVER
					                         APPROX. 2.03 MILES SOUTH OF SR 2(RP 276+049)
	
       COMPLETION DATE:  October 29, 2004              DBE GOAL:   5.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     2.80         X-SECT: $     0.00

                                                                                                                         PAGE  12
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
 
___________________________________________________________________________________________________________________________________
 
CALL 450     CONTRACT B -27356-A       BRIDGE REHABILITATION                                 LAPORTE DISTRICT              PG. 73
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100410            |  0658139                         BRIDGE DECK OVERLAY, STR. I65-256-4899, REINFORCED CONCRETE
                                                                 GIRDER AND STEEL BEAM, 4 SPANS TOTAL LENGTH 200 FT
				       	                         LAKE COUNTY - ON 113TH AVENUE OVER I-65, 1.36 MILES NORTH OF
					                         US 231 (RP 248+71)
	
       COMPLETION DATE:  September 01, 2004            DBE GOAL:  10.0 QUALIFICATIONS: D(B)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     1.80         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 460     CONTRACT B -27369-A       NEW BRIDGE CONSTRUCTION                               CRAWFORDSVILLE DISTRICT       PG. 75
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9608810            |  0813017                         NEW BRIDGE CONSTRUCTION, STR. 231-54-8511, PRECAST REINF
                                                                 CONC 3 SIDED FLAT TOP CULVERT, 1 SPAN TOTAL LENGTH 5.48 m
				       	                         MONTGOMERY COUNTY - ON US 231 OVER U.N.T. TO INDIAN CREEK,
					                         APPROX 0.43 km SOUTH OF SR 234 (RP 169+65)
	
       COMPLETION DATE:  September 30, 2004            DBE GOAL:   7.0 QUALIFICATIONS: B(A)  D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     3.40         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 470     CONTRACT B -27372-A       BRIDGE REPLACEMENT                                    LAPORTE DISTRICT              PG. 77
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9702440            |  1591006                         BRIDGE REPLACEMENT, STR. 23-71-8282, CONTINUOUS COMPOSITE
                                                                 PRESTRESSED CONC BULB T-BEAM, 2 SPANS TOTAL LENGTH 202.00 FT
				       	                         ST. JOSEPH COUNTY - ON STATE ROAD 23 OVER US 20, 3.07 MILES
					                         SOUTH OF SR 933 (RP 35+88)
	
       COMPLETION DATE:  August 20, 2005               DBE GOAL:   6.0 QUALIFICATIONS: C(B)  D(B)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $    13.60         X-SECT: $     0.00

  NOTE:  PRE-BID CONFERENCE INFORMATION ON PAGE 22. 
___________________________________________________________________________________________________________________________________
 
CALL 480     CONTRACT B -27436-A       TRUSS BRIDGE REHABILITATION                           CRAWFORDSVILLE DISTRICT       PG. 80
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------

                                                                                                                         PAGE  13
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
 
           0089420            |  9960017                         TRUSS BRIDGE REHABILITATION, OWEN-14, PONY TRUSS
                                                                 PRATT THROUGH TRUSS, 2 SPANS TOTAL LENGTH 190.46 FT
				       	                         OWEN COUNTY - ON CO RD 100 E (TOWER RD) OVER MILL CREEK
					
	
       COMPLETION TIME:   105   WORK DAYS              DBE GOAL:   5.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     4.60         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 490     CONTRACT B -27449-A       BRIDGE REHABILITATION                                 GREENFIELD DISTRICT           PG. 82
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0300020            |  9949085                         BRIDGE REHABILITATION & WIDENING, STR. MARION 0401F,
                                                                 REINFORCED CONCRETE ARCH, 1 SPAN TOTAL LENGTH 70 FT
				       	                         MARION COUNTY - ON NORTH COLLEGE AVENUE OVER WILLIAMS CREEK,
					                         0.23 MILE NORTH OF 75TH STREET
	
       COMPLETION DATE:  December 03, 2004             DBE GOAL:   7.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     3.60         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 500     CONTRACT B -27486-A       COVERED BRIDGE REHABILITATION                         GREENFIELD DISTRICT           PG. 84
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100727            |  9970013                         COVERED BRIDGE REHABILITATION, STR. RUSH-100, HOWE TIMBER
                                                                 TRUSS WITH BURR ARCH, 1 SPAN TOTAL LENGTH 150.17 FT
				       	                         RUSH COUNTY - HISTORIC NORRIS FORD BRIDGE ON CO RD 300 N
					                         OVER FLATROCK RIVER, 1.8 MILES EAST OF SR 3
	
       COMPLETION DATE:  November 01, 2004             DBE GOAL:   0.0 QUALIFICATIONS: D(A)  0101
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     2.20         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 510     CONTRACT B -27499-A       BRIDGE REPLACEMENT                                    GREENFIELD DISTRICT           PG. 86
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0088620            |  9989034                         BRIDGE REPLACEMENT, STR. WAYNE-72, CONTINUOUS COMPOSITE
                                                                 PRESTRESSED PRECAST CONCRETE I-BEAM, 3 SPANS TOTAL 53.70 m
				       	                         WAYNE COUNTY - ON MOYER ROAD OVER GREENS FORK CREEK, WEST OF
					                         INTERSECTION WITH WASHINGTON ROAD
	
                                                       DBE GOAL:   8.0 QUALIFICATIONS: D(A)

                                                                                                                         PAGE  14
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
       COMPLETION DATE:  November 29, 2004
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     5.80         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 520     CONTRACT B -27512-A       BRIDGE REPLACEMENT                                    LAPORTE DISTRICT              PG. 88
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100352            |  9925015                         BRIDGE REPLACEMENT, STR. FULTON-2, CONTINUOUS COMPOSITE
                                                                 PRESTRESSED CONCRETE I-BEAM, 3 SPANS TOTAL LENGTH 222.0 FT
				       	                         FULTON COUNTY - ON COUNTY ROAD 750 WEST OVER THE TIPPECANOE
					                         RIVER
	
       COMPLETION DATE:  November 01, 2004             DBE GOAL:   6.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     8.20         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 530     CONTRACT B -27527-A       BRIDGE REHABILITATION                                 VINCENNES DISTRICT            PG. 90
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0201241            |  9947022                         BRIDGE RESTORATION, STR. LAWRENCE-20, OPEN-SPANDREL
                                                                 REINFORCED CONCRETE ARCH, 3 SPANS TOTAL LENGTH 136.0 FT
				       	                         LAWRENCE COUNTY - ON OLD STATE ROAD 37 OVER GULLETS CREEK,
					                         2.5 MILES SOUTH OF SR 37
	
       COMPLETION TIME:   110   WORK DAYS              DBE GOAL:   5.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     5.60         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 540     CONTRACT B -27560-A       BRIDGE REHABILITATION                                 GREENFIELD DISTRICT           PG. 91
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0200860            |  9949071                         BRIDGE REHABILITATION, STR. 31-49-4395D, CONTINUOUS
                                                                 REINFORCED CONCRETE ARCH, 3 SPANS TOTAL LENGTH 289.42 FT
				       	                         MARION COUNTY - ON MERIDIAN STREET OVER FALL CREEK
					
	
       COMPLETION DATE:  November 19, 2004             DBE GOAL:   3.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     2.40         X-SECT: $     0.00
 

                                                                                                                         PAGE  15
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
___________________________________________________________________________________________________________________________________
 
CALL 550     CONTRACT B -27613-A       BRIDGE REHABILITATION                                 GREENFIELD DISTRICT           PG. 92
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0400070            |  06530CD                         SUBSTRUCTURE REPAIR, STR. I65-108-4796C-NB, REINFORCED
                                                                 CONCRETE GIRDER & STEEL BEAM, 3 SPANS TOTAL LENGTH 158.25 FT
				       	                         MARION COUNTY - ON I-65 NORTH BOUND BRIDGE OVER I-465 WEST
					                         BOUND, 4.20 MILES SOUTH OF I-70 (RP 106+02)
	
           0400125            |  06530CD                         SUBSTRUCTURE REPAIR, STR. I65-108-4796C-SB, REINFORCED
                                                                 CONCRETE GIRDER & STEEL BEAM, 3 SPANS TOTAL LENGTH 158.25 FT
				       	                         MARION COUNTY - ON I-65 SOUTH BOUND BRIDGE OVER I-465 WEST
					                         BOUND, 4.20 MILES SOUTH OF I-70 (RP 106+02)
	
           0400126            |  06530CD                         SUBSTRUCTURE REPAIR, STR. I65-108-4795C-NB, REINFORCED
                                                                 CONCRETE GIRDER & STEEL BEAM, 3 SPANS TOTAL LENGTH 158.25 FT
				       	                         MARION COUNTY - ON I-65 NORTH BOUND BRIDGE OVER I-465 EAST
					                         BOUND, 4.25 MILES SOUTH OF I-70 (RP 106+07)
	
           0400127            |  06530CD                         SUBSTRUCTURE REPAIR, STR. I65-108-4795C-SB, REINFORCED
                                                                 CONCRETE GIRDER & STEEL BEAM, 3 SPANS TOTAL LENGTH 158.25 FT
				       	                         MARION COUNTY - ON I-65 SOUTH BOUND BRIDGE OVER I-465 EAST
					                         BOUND, 4.25 MILES SOUTH OF I-70 (RP 106+07)
	
       COMPLETION DATE:  October 18, 2004              DBE GOAL:   0.0 QUALIFICATIONS: D(B)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     7.20         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 590     CONTRACT M -27315-A       ASPHALT RESURFACE                                     CRAWFORDSVILLE DISTRICT       PG. 93
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0300525            |  445400G                         ASPHALT RESURFACE
				       	                         MONTGOMERY COUNTY - ON US 136 FROM WEST CRAWFORDSVILLE CORP.
					                          LINE TO EAST CORP. LINE(RP 035+005 TO 038+036)
	
           0300526            |  088200E                         ASPHALT RESURFACE
				       	                         MONTGOMERY COUNTY - ON SR 32 FROM EAST JCT. US 136 TO
					                         EAST JCT. SR 47(RP 036+001.89 TO 038+065)
	
       COMPLETION DATE:  September 15, 2004            DBE GOAL:   0.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 600     CONTRACT M -27440-A       ASPHALT RESURFACE                                     FT. WAYNE DISTRICT            PG. 95
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 

                                                                                                                         PAGE  16
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
           0300943            |  20000AL                         RESURFACE OVER ASPHALT
				       	                         KOSCIUSKO COUNTY - ON SR 15 FROM THE SOUTH TOWN LIMITS TO
					                         THE NORTH TOWN LIMITS OF SILVER LAKE (RP 44+69 TO RP 45+63)
	
       COMPLETION DATE:  October 01, 2004              DBE GOAL:   0.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 610     CONTRACT M -27462-A       SMALL STRUCTURE REPAIRS                               GREENFIELD DISTRICT           PG. 96
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0301030            |  99990AU                         SMALL STRUCTURE REPAIRS
				       	                         VARIOUS COUNTIES - AT VARIOUS LOCATIONS IN THE GREENFIELD
					                         DISTRICT (HENRY, DELAWARE, MADISON, HAMILTON & TIPTON CO'S)
	
       COMPLETION TIME:    95   WORK DAYS              DBE GOAL:   0.0 QUALIFICATIONS: C(B)  E(E)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 620     CONTRACT M -27464-A       WEDGE AND LEVEL                                       VINCENNES DISTRICT            PG. 97
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0301032            |  60000AG                         WEDGE AND LEVEL
				       	                         DUBOIS COUNTY - ON SR 56 FROM US 231 (RP 48+46) TO SR 545
					                         (RP 54+31)
	
       COMPLETION TIME:    20   WORK DAYS              DBE GOAL:   0.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 630     CONTRACT M -27482-A       ASPHALT RESURFACE                                     VINCENNES DISTRICT            PG. 98
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0200869            |  60000AD                         MILL SURFACE & HMA OVERLAY
				       	                         PERRY COUNTY - ON SR 66 FROM WASHINGTON ST (RP 78+72) TO
					                         1.88 MILES EAST OF SR 237 W JNCT (RP 79+50)
	
       COMPLETION TIME:    20   WORK DAYS              DBE GOAL:   0.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 640     CONTRACT M -27483-A       ASPHALT RESURFACE                                     VINCENNES DISTRICT            PG. 99
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION

                                                                                                                         PAGE  17
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
       ------------------------------------------                -----------------------------------------------------------
 
           0301107            |  60000AF                         SURFACE TREATMENT
				       	                         GREENE COUNTY - ON SR 54 FROM SR 59 WEST JNCT TO 1.36 MILE
					                         WEST OF SR 59 EAST JNCT
	
       COMPLETION TIME:    30   WORK DAYS              DBE GOAL:   0.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 650     CONTRACT M -27519-A       HMA OVERLAY & PCCP PATCHING                           CRAWFORDSVILLE DISTRICT       PG. 100
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0400065            |  129600D                         HMA OVERLAY & PCCP PATCHING
				       	                         BOONE COUNTY - ON SR 267 FROM 0.35 MILE SOUTH OF I-65 (RP
					                         28+45) TO 0.08 MILE NORTH OF I-65 (RP 28+80)
	
       COMPLETION TIME:    15   WORK DAYS              DBE GOAL:   0.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 660     CONTRACT M -27588-A       WEDGE AND LEVEL                                       LAPORTE DISTRICT              PG. 101
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0400104            |  40000AR                         WEDGE AND LEVEL & PIPE REPLACEMENT
				       	                         CARROLL & CASS COUNTIES - ON SR 218 FROM SR 29 (RP 17+49) TO
					                         US 35 (RP 25+16)
	
       COMPLETION TIME:    25   WORK DAYS              DBE GOAL:   0.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 670     CONTRACT M -27591-A       BARRIER WALL REPAIR                                   GREENFIELD DISTRICT           PG. 102
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0400112            |  30000AZ                         CONCRETE BARRIER WALL REPAIR
				       	                         MARION COUNTY - AT VARIOUS LOCATIONS WITHIN I-465 AND THE
					                         INDIANAPOLIS AREA
	
       COMPLETION DATE:  May 31, 2005                  DBE GOAL:   0.0 QUALIFICATIONS: E(F)
 
       PROPOSAL PRICE:           $    12.50
 

                                                                                                                         PAGE  18
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
___________________________________________________________________________________________________________________________________
 
CALL 680     CONTRACT M -27608-A       WEDGE AND LEVEL                                       LAPORTE DISTRICT              PG. 103
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0400202            |  40000AS                         WEDGE AND LEVEL
				       	                         MARSHALL & KOSCIUSKO COUNTIES - ON SR 10 FROM GROVE ST, 1.13
					                         MILES EAST OF US 31 (RP 75+02) TO SR 19 (RP 85+30)
	
       COMPLETION TIME:    15   WORK DAYS              DBE GOAL:   0.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 690     CONTRACT M -27609-A       GUARDRAIL REPAIR                                      LAPORTE DISTRICT              PG. 104
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0400203            |  40000AT                         GUARDRAIL REPAIR
				       	                         VARIOUS COUNTIES - ON ALL STATE AND INTERSTATE HIGHWAYS
					                         THROUGHOUT THE LAPORTE DISTRICT
	
       COMPLETION DATE:  June 30, 2005                 DBE GOAL:   0.0 QUALIFICATIONS: E(K)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 700     CONTRACT M -27616-A       ASPHALT RESURFACE                                     FT. WAYNE DISTRICT            PG. 106
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0400250            |  20000AR                         RESURFACE OVER ASPHALT PAVEMENT
				       	                         HUNTINGTON COUNTY - ON SR 105 FROM SR 16 (RP 20+68) TO
					                         SR 114 (RP 26+71)
	
       COMPLETION DATE:  October 08, 2004              DBE GOAL:   0.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 710     CONTRACT M -27617-A       PCCP PATCHING AND NEW IMPACT ATTENUATORS              FT. WAYNE DISTRICT            PG. 107
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0400253            |  20000AS                         CONCRETE PATCHING AND NEW IMPACT ATTENUATORS
				       	                         ALLEN & DEKALB COUNTIES - AT VARIOUS LOCATIONS ON I-69,
					                         I-469, SR 3 & COLDWATER RD
	
       COMPLETION DATE:  August 21, 2004               DBE GOAL:   0.0 QUALIFICATIONS: A(B)  E(K)  E(Q)
 

                                                                                                                         PAGE  19
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 720     CONTRACT M -27627-A       PIPE SLIP LINING                                      GREENFIELD DISTRICT           PG. 108
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0400323            |  30000BA                         SMALL STRUCTURE REPAIR, SLIP LINING OF EXISTING C.M. PIPES &
                                                                 ARCHES
				       	                         HAMILTON COUNTY - AT VARIOUS LOCATIONS ON US 31 AND SR 431
					
	
       COMPLETION TIME:    32   WORK DAYS              DBE GOAL:   0.0 QUALIFICATIONS: E(E)  0291
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 730     CONTRACT M -27635-A       CONSTRUCTION OF NEW SUB-DISTRICT PARKING AREA         LAPORTE DISTRICT              PG. 109
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0400365            |  40000AU                         CONSTRUCTION OF PARKING AREA
				       	                         JASPER COUNTY - ON THE NEW RENSSELAER SUB-DISTRICT, 0.5 MILE
					                         EAST OF US 231, 1130 EAST MAPLE STREET, RENSSELAER
	
       COMPLETION TIME:    20   WORK DAYS              DBE GOAL:   0.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 750     CONTRACT T -26918-A       TRAFFIC SIGNALS MODERNIZATION                         CRAWFORDSVILLE DISTRICT       PG. 110
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0300175            |  081600A                         TRAFFIC SIGNALS MODERNIZATION
				       	                         TIPPECANOE COUNTY - ON US 231 (NORTHWESTERN AVE) AT STADIUM
					                         AVE IN WEST LAFAYETTE
	
       COMPLETION DATE:  August 27, 2004               DBE GOAL:   0.0 QUALIFICATIONS: B(A)  C(B)  E(A)
 
       PROPOSAL PRICE:           $    12.50
       TRAFFIC ITEMS:     PLANS: $     1.20
 
___________________________________________________________________________________________________________________________________
 
CALL 760     CONTRACT T -26949-A       TRAFFIC SIGNAL MODERNIZATION                          VINCENNES DISTRICT            PG. 112
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0300200            |  328200F                         TRAFFIC SIGNAL MODERNIZATION
				       	                         VANDERBURGH COUNTY - ON SR 62(MORGAN AVE) AT BOEKE ROAD

                                                                                                                         PAGE  20
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
					
	
           0300201            |  012100W                         TRAFFIC SIGNAL MODERNIZATION
				       	                         VANDERBURGH COUNTY - ON SR 66(LLOYD EXPY) AT WB RAMP AND
					                         WEINBACH AVE
	
           0300202            |  012100W                         TRAFFIC SIGNAL MODERNIZATION
				       	                         VANDERBURGH COUNTY - ON SR 66 (LLOYD EXPY) AT EB RAMP AND
					                         WEINBACH AVE
	
           0300203            |  328200F                         TRAFFIC SIGNAL MODERNIZATION
				       	                         VANDERBURGH COUNTY - ON SR 62 AT RAMPS & DIVISION ST/JOHN ST
					                         & 1ST AVE/MARKET ST
	
           0300204            |  328200F                         TRAFFIC SIGNAL MODERNIZATION
				       	                         VANDERBURGH COUNTY - ON SR 62(LLOYD EXPY) AT EB RAMP AND
					                         MAIN ST
	
           0300872            |  012100W                         TRAFFIC SIGNAL MODERNIZATION
				       	                         VANDERBURGH COUNTY - ON SR 66 (LLOYD EXPY) AT WB RAMP AND
					                         BOEKE RD
	
           0300873            |  012100W                         TRAFFIC SIGNAL MODERNIZATION
				       	                         VANDERBURGH COUNTY - ON SR 66 (LLOYD EXPY) AT EB RAMP AND
					                         BOEKE RD
	
       COMPLETION TIME:    85   WORK DAYS              DBE GOAL:   0.0 QUALIFICATIONS: E(A)
 
       PROPOSAL PRICE:           $    12.50
       TRAFFIC ITEMS:     PLANS: $     1.60
 
___________________________________________________________________________________________________________________________________
 
CALL 770     CONTRACT T -26951-A       TRAFFIC SIGNAL MODERNIZATIONN                         SEYMOUR DISTRICT              PG. 114
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0300220            |  04320AC                         TRAFFIC SIGNAL MODERNIZATION
				       	                         OWEN COUNTY - ON SR 46/67 AT SR 67/US 231 EAST JCT.
					                         (RP 122+093)
	
           0300221            |  062100I                         TRAFFIC SIGNAL MODERNIZATION
				       	                         OWEN COUNTY - ON SR 46/67(MORGAN ST.) AT MAIN STREET
					                         (RP 122+060)
	
           0300222            |  062100I                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         OWEN COUNTY - ON US 231/SR 67 AT SR 46 WEST JCT.
					                         (RP 122+010)
	
       COMPLETION DATE:  September 15, 2004            DBE GOAL:   0.0 QUALIFICATIONS: E(A)
 
       PROPOSAL PRICE:           $    12.50
       TRAFFIC ITEMS:     PLANS: $     0.80
 

                                                                                                                         PAGE  21
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING
___________________________________________________________________________________________________________________________________
 
CALL 780     CONTRACT T -27191-A       NEW TRAFFIC SIGNAL INSTALLATIONS                      LAPORTE DISTRICT              PG. 115
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0300111            |  200200G                         NEW TRAFFIC SIGNAL
				       	                         LAKE COUNTY - ON US 30 AT JANICE DRIVE (RP 002+030)
					
	
           0300569            |  206300D                         NEW TRAFFIC SIGNAL
				       	                         LAPORTE COUNTY - ON STATE ROAD 2 AT FAIL ROAD (RP 062+022)
					
	
           0300809            |  446400E                         NEW TRAFFIC SIGNAL
				       	                         LAKE COUNTY - ON STATE ROAD 130 AT STATE ROAD 51(RAND
					                         STREET) (RP 006+024)
	
           0400081            |  188100X                         NEW TRAFFIC SIGNAL
				       	                         JASPER COUNTY - ON STATE ROAD 10 AT COUNTY ROAD 400 WEST
					                         (RP 024+022)
	
       COMPLETION DATE:  November 12, 2004             DBE GOAL:   0.0 QUALIFICATIONS: E(A)
 
       PROPOSAL PRICE:           $    12.50
       TRAFFIC ITEMS:     PLANS: $     1.00
 
___________________________________________________________________________________________________________________________________
 
CALL 790     CONTRACT T -27448-A       SNOWPLOWABLE RAISED PAVEMENT MARKER PRISMATIC REFLECTOR REPL FT. WAYNE DISTRICT     PG. 116
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0300937            |  9999038                         SNOWPLOWABLE RAISED PAVEMENT MARKER REFLECTOR REPLACEMENT
				       	                         VARIOUS COUNTIES - ON VARIOUS ROADS THROUGHOUT THE
					                         FT. WAYNE DISTRICT
	
       COMPLETION DATE:  October 03, 2004              DBE GOAL:   0.0 QUALIFICATIONS: E(G)  0320
 
       PROPOSAL PRICE:           $    12.50

                                                                                                                         PAGE 22
                                              NOTICE TO CONTRACTORS  --  May 25, 2004       LETTING







						R -26347-A

			    		    PRE-BID CONFERENCE

			DATE OF PRE-BID CONFERENCE:		MAY 4, 2004

			TIME OF PRE-BID CONFERENCE:		10:00 A.M. LOCAL TIME

			LOCATION OF PRE-BID CONFERENCE:		PROPHETSTOWN STATE PARK OFFICE
								4112 E SR 225
								WEST LAFAYETTE, IN  47906
				 				765-567-4919







						B -27372-A

			    		    PRE-BID CONFERENCE

			DATE OF PRE-BID CONFERENCE:		TUESDAY, MAY 11, 2004

			TIME OF PRE-BID CONFERENCE:		10:00 A.M. LOCAL TIME

			LOCATION OF PRE-BID CONFERENCE:		INDOT LAPORTE DISTRICT OFFICE
								315 E BOYD BLVD
								LAPORTE, IN  46352

			PURPOSE:				QUESTION AND ANSWER SESSION FOR THE
								SPECIAL PROVISION CONCERNING QC/QA
								SUPERSTRUCTURE CONCTETE, MODIFIED;
				 				AND CONSTRUCTION REQUIREMENTS FOR
				 				PURDUE UNIVERSITY TESTING.