INDIANA DEPARTMENT OF TRANSPORTATION                                    PAGE 1
                                                   NOTICE TO HIGHWAY CONTRACTORS
 
                             DATE OF LETTING: January 15, 2002
                             TIME OF LETTING: 10:00 AM  EASTERN STANDARD
 
 
 
Sealed proposals for certain highway improvements as described below will be received from contractors holding a valid Certificate
of Qualification issued by the Indiana Department of Transportation.
 
==================================================================================================================================
          LOCATION OF DEPOSIT: Indiana Department of Transportation, Mr. Wayne H. Wiese, Contracts Services Manager
                               Room N855, Government Center North, 100 North Senate Avenue, Indianapolis, IN 46204-2218
 
          LOCATION OF OPENING: All proposals will immediately thereafter be taken to the Auditorium, Government Center South,
                               402 West Washington Street, Indianapolis, Indiana where they will be publicly opened and read.
==================================================================================================================================
 
Contract documents may be purchased at the office of the Indiana Department of Transportation, Room N855, Government Center North,
100 North Senate Avenue, Indianapolis, IN  46204-2218, telephone 317-232-5070, fax 317-232-0676.  Checks should be made
payable to the Indiana Department of Transportation.  No refunds will be made for material returned except in cases of error in
filling orders.  Sample proposals may be purchased for twelve dollars and fifty cents ($12.50) each.  Bidding proposals will be
issued until 4:30 P.M., eastern standard time, the last work day preceding the bid opening date.  Bids will be considered as
provided for in the Prequalification and Bidding Regulations on file.  Copies are available in Room N855, Government Center North.
 
Contract documents may be examined in Room N855, Government Center North, 100 North Senate Avenue, Indianapolis, Indiana.
 
An executed bid bond and an executed performance bond shall be included with the bid except on contracts for roadside mowing,
vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of
$100,000 or less, the bidder may elect not to furnish a performance bond.
 
All projects are to be constructed in accordance with the applicable Federal, State and Local laws.  On applicable Federal Aid
projects, the Work Hours Act of 1962 (Public Law 87-851) and the Davis-Bacon Act of 1968 and any subsequent amendments to these
Acts will apply.  The Indiana Department of Transportation hereby notifies all bidders that minority business enterprises will be
afforded full opportunity to submit bids in response to the invitation and will not be discriminated against on the grounds of
race, color, sex, or national origin in consideration for award.
 
                                                  ********************************
                                                  * MINORITY BUSINESS ENTERPRISE *
                                                  ********************************
 
  On Non-Federal-Aid Construction contracts, Indiana Department of Transportation (INDOT) encourages utilization of minority
  business enterprises (MBEs) in bids; however, award of such contracts will not be based upon achievement of any specific goal.
 
  "Minority business enterprise" or "minority business" means an individual, partnership, corporation, limited liability company,
  or joint venture of any kind that is owned and controlled by one (1) or more persons who are: (1) United States citizens; and
  (2) member of a racial minority group.
 
  "Owned and controlled" means having: (1) ownership of at least fifty-one percent of the enterprise, including corporate stock
  of a corporation; (2) control over the management and active in the day-to-day operations of the business; and (3) an interest in
  the capital, assets, and profits and losses of the business proportionate to the percentage of ownership.
 
  "Racial minority group" means: (1) Blacks; (2) American Indians; (3) Hispanics; (4) Asian Americans; and (5) other similar racial
  minority groups.
 
                                                          INTERNET ADDRESS
 
For additional information, visit the INDOT Contract Services website at http://www.state.in.us/dot/TS/contract

                                                                                                                           PAGE   1
                                           NOTICE TO CONTRACTORS -- January 15, 2002   LETTING
___________________________________________________________________________________________________________________________________
 
CALL 120     CONTRACT R -23896-A       INTERSECTION IMPROVEMENT                              CRAWFORDSVILLE DISTRICT       PG. 1
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           8610885            |  0372018                         INTERSECTION IMPROVEMENT
				       	                         PARKE COUNTY - ON US 41, 2.7 MILES NORTH OF SR 163
					                         (RP 128+092 TO 129+044)
	
       COMPLETION DATE:  November 08, 2002             DBE GOAL:   3.0 QUALIFICATIONS: C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     5.00         X-SECT: $     6.20                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 130     CONTRACT R -25253-A       ROAD REHABILITATION AND BRIDGE DECK OVERLAY           SEYMOUR DISTRICT              PG. 3
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9614750            |  6501165                         ROAD REHABILITATION
				       	                         CLARK AND SCOTT COUNTIES - ON I-65 FROM 1.19 km NORTH OF
					                         SR 160 TO 0.69 km NORTH OF SR 56
	
           9614751            |  0651165                         BRIDGE DECK OVERLAY STR NO. I-65-21-4225D - REINFORCED
                                                                 CONCRETE GIRDER, 3 SPANS, 42.04 TOATL LENGTH
				       	                         CLARK COUNTY - ON I-65 OVER BROWNSTOWN RD, 2.03 MILES NORTH
					                         OF SR 160 (RP 21+024)
	
       COMPLETION TIME:    75   WORK DAYS              DBE GOAL:   6.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     8.60         X-SECT: $     0.00                      0.00
       BRIDGE ITEMS:      PLANS: $     1.80         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 140     CONTRACT R -25540-A       INTERSECTION IMPROVEMENT                              CRAWFORDSVILLE DISTRICT       PG. 6
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           8663030            |  0761033                         INTERSECTION IMPROVEMENT
				       	                         PARKE COUNTY - ON US 36 AT CO. RD. 600W. NORTH AND SOUTH
					                         JCT, 1.4 MILES EAST OF WABASH RIVER(RP 010+004)
	
       COMPLETION DATE:  November 10, 2002             DBE GOAL:   4.0 QUALIFICATIONS: B(A)  C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     8.20         X-SECT: $     6.20                      0.00
 

                                                                                                                         PAGE   2
                                              NOTICE TO CONTRACTORS  --  January 15, 2002   LETTING
___________________________________________________________________________________________________________________________________
 
CALL 150     CONTRACT R -25552-A       INTERSECTION IMPROVEMENT                              LAPORTE DISTRICT              PG. 8
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9611060            |  2004013                         INTERSECTION IMPROVEMENT
				       	                         MARSHALL COUNTY - ON US 30 AT PINE RD, 1.87 MILES WEST OF
					                         SR 17(RP 062+097)
	
       COMPLETION TIME:    75   WORK DAYS              DBE GOAL:   5.0 QUALIFICATIONS: B(A)  C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    12.00         X-SECT: $     3.00                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 160     CONTRACT R -25697-A       PAVEMENT REPAIR AND REHABILITATION                    LAPORTE DISTRICT              PG. 10
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0089070            |  IN47007                         PAVEMENT REPAIR AND REHABILITATION
				       	                         LAPORTE COUNTY - ON CR 300 SOUTH FROM US 35 TO SR 4
					
	
       COMPLETION TIME:    30   WORK DAYS              DBE GOAL:   9.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 170     CONTRACT R -25711-A       INTERSECTION IMPROVEMENT                              GREENFIELD DISTRICT           PG. 11
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9137705            |  8733001                         INTERSECTION IMPROVEMENT
				       	                         HENRY COUNTY - ON US 36 AT MESSICK RD., 1.9 MILES EAST OF
					                         SR 103(RP 111+086)
	
       COMPLETION TIME:    20   WORK DAYS              DBE GOAL:   5.0 QUALIFICATIONS: B(A)  C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     6.40         X-SECT: $     2.40                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 180     CONTRACT R -25712-A       ROAD REPLACEMENT, INTERSECTION IMPROVEMENT AND SIGNAL MODERN VINCENNES DISTRICT     PG. 13
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0001020            |  E620002                         SIGN MODERNIZATION
				       	                         VANDERBURGH COUNTY - ON SR 66 FROM 1.3 MILES EAST OF US 41
					                         TO VANN AVE AT LLOYD EXPRESSWAY (RP 028+038)
	

                                                                                                                         PAGE   3
                                              NOTICE TO CONTRACTORS  --  January 15, 2002   LETTING
           9225771            |  0064040                         PAVEMENT REPLACEMENT
				       	                         VANDERBURGH COUNTY - ON SR 66 FROM 1.3 MILES EAST OF US 41
					                         TO 1.8 MILES EAST OF US 41 (RP 028+038 TO 028+090)
	
           9405630            |  E620001                         INTERSECTION IMPROVEMENT
				       	                         VANDERBURGH COUNTY - ON SR 66 AT VANN AVE (RP 028+090)
					
	
           992577A            |  E620002                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         VANDERBURGH COUNTY - ON SR 66 AT VANN AVE (RP 028+090)
					
	
       COMPLETION DATE:  November 27, 2002             DBE GOAL:   5.0 QUALIFICATIONS: A(B)  C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    10.80         X-SECT: $     2.00                      0.00
       TRAFFIC ITEMS:     PLANS: $     2.40
 
___________________________________________________________________________________________________________________________________
 
CALL 190     CONTRACT R -25761-A       INTERSECTION IMPROVEMENT AND TRAFFIC SIGNAL MODERNIZATION GREENFIELD DISTRICT       PG. 17
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           8819845            |  4089013                         INTERSECTION IMPROVEMENT
				       	                         WAYNE COUNTY - ON US 40 AT SOUTHWEST 18TH ST, 12.2 MILES
					                         EAST OF SR 1 (RP 143+043)
	
           941984A            |  4089013                         TRAFFIC SIGNAL, MODERNIZATION
				       	                         WAYNE COUNTY - ON US 40 AT SOUTHWEST 18TH ST, 12.2 MILES
					                         EAST OF SR 1 (RP 143+043)
	
       COMPLETION TIME:    75   WORK DAYS              DBE GOAL:   5.0 QUALIFICATIONS: B(A)  C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     7.40         X-SECT: $     0.00                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 200     CONTRACT R -25808-A       ROAD REHABILITATION, BRIDGE DECK OVERLAY, SIGNS       VINCENNES DISTRICT            PG. 19
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100849            |  0641100                         SIGNS, MODERNIZATION
				       	                         POSEY COUNTY - ON I-64, FROM ILLINOIS STATE LINE TO O.4 MILE
					                         WEST OF SR 165 (RP 000+000 TO 11+32)
	
           0100850            |  6401100                         DATA COLLECTION SITE
				       	                         POSEY COUNTY - ON I-64 FROM ILLINOIS STATE LINE TO 0.4 MILE
					                         WEST OF SR 165
	
           9614700            |  0641100                         PAVEMENT REHABILITATION
				       	                         POSEY COUNTY - ON I-64 FROM ILLINOIS STATE LINE TO 0.4 MILE
					                         WEST OF SR 165 (000+000 TO 011+050)
	
           9614701            |  0641100                         BRIDGE DECK OVERLAY - STR I-64-2-5198B EB AND WB,

                                                                                                                         PAGE   4
                                              NOTICE TO CONTRACTORS  --  January 15, 2002   LETTING
                                                                 WELDED PLATE GIRDER, 6 SPANS, TOTAL LENGTH 228.898
				       	                         POSEY COUNTY - ON I-64 OVER BIG BAYOU RIVER (RP 002+041)
					
	
           9614702            |  0641100                         BRIDEGE DECK REPLACEMENT STR I-64-4-5208C EB ANDWB, CONT.
                                                                 COMPOSITE STEEL BEAM, 3 SPANS, TOTAL LENGTH 37.369
				       	                         POSEY COUNTY - ON I-64 OVER SR 69 (RP 004+042)
					
	
           9709091            |  0641100                         BRIDGE DECK OVERLAY - STR I-64-5-5200B EB AND WB, TWIN
                                                                 CONTINUOUS STEEL BEAM, 12 SPAN, TOTAL LENGTH 257.785 m
				       	                         POSEY COUNTY - ON I-64 OVER BLACK RIVER OVERFLOW, 10.45 km
					                         WEST OF SR 165 (RP 005+038)
	
           9709092            |  0641100                         BRIDGE DECK OVERLAY STR I-64-5-5201B EB AND WB, CONTINUOUS
                                                                 STEEL BEAM AND WELDED PLATE GIRDER, 13 SPANS, LENGTH 334.838
				       	                         POSEY COUNTY - ON I-64 OVER BLACK RIVER, 10.01 km WEST OF SR
					                         165 (RP 005+065)
	
           9709093            |  0641100                         BRIDGE DECK OVERLAY STR I-64-6-5209B EB AND WB, CONTINUOUS
                                                                 REINFORCED CONCRETE SLAB, 3 SPANS, TOTAL LENGTH 31.851
				       	                         POSEY COUNTY - ON I-64 OVER WILSEY RD, 9.15km WEST OF SR 165
					                         (RP 006+019)
	
           9709094            |  0641100                         BRIDGE DECK OVERLAY - STR I-64-7-2367B EB AND WB, CONTINUOUS
                                                                 REINFORCED CONCRETE SLAB, 3 SPANS, TOTAL LENGTH 32.309 m
				       	                         POSEY COUNTY - I-64 OVER COX'S CREEK AND ABANDONED RAILROAD,
					                         7.73 km WEST OF SR 165 (RP 007+007)
	
           9709095            |  0641100                         BRIDGE DECK OVERLAY - STR I-64-11-5202B EB AND WB, REIN.
                                                                 CONCRETE SLAB, 3 SPANS, TOTAL LENGTH 21.800 m
				       	                         POSEY COUNTY - ON I-64 OVER FLAT RUN DITCH, 0.95 km WEST OF
					                         SR 165 (RP 011+021)
	
       COMPLETION DATE:  December 15, 2003             DBE GOAL:   8.0 QUALIFICATIONS: B(A)  C(B)  D(C)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $    33.40         X-SECT: $    87.60                      0.00
       BRIDGE ITEMS:      PLANS: $    20.00         X-SECT: $     0.00
       TRAFFIC ITEMS:     PLANS: $     7.80
 
___________________________________________________________________________________________________________________________________
 
CALL 210     CONTRACT R -25837-A       ROAD REHABILITATION                                   VINCENNES DISTRICT            PG. 24
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9703080            |  0951020                         ROAD REHABILITATION
				       	                         PERRY COUNTY- ON SR 37 FROM 3.2 km NORTH OF SR 66 TO 0.18 km
					                         SOUTH OF SR 70 (RP 01+098 TO RP 10+078)
	
       COMPLETION DATE:  November 01, 2002             DBE GOAL:   3.0 QUALIFICATIONS: B(A)  C(B)
 
       PROPOSAL PRICE:           $    12.50
 

                                                                                                                         PAGE   5
                                              NOTICE TO CONTRACTORS  --  January 15, 2002   LETTING
___________________________________________________________________________________________________________________________________
 
CALL 220     CONTRACT R -25849-A       SMALL STRUCTURE REPLACEMENT                           LAPORTE DISTRICT              PG. 26
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9407870            |  3650020                         SMALL STRUCTURE REPLACEMENT
				       	                         MARSHALL COUNTY - ON SR 10 OVER HORN DITCH, 1.6 MILES WEST
					                         OF SR 331 (RP 080+030)
	
       COMPLETION DATE:  June 15, 2002                 DBE GOAL:   5.0 QUALIFICATIONS: C(B)  E(E)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     3.00         X-SECT: $     0.00                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 230     CONTRACT R -25862-A       INTERSECTION IMPROVEMENT                              VINCENNES DISTRICT            PG. 28
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9405060            |  3387003                         INTERSECTION IMPROVEMENT
				       	                         WARRICK COUNTY - SR 261 AT JCT WITH HUNTER RD, 3.48 MILES
					                         NORTH OF SR 66 (RP 003+048)
	
       COMPLETION TIME:    65   WORK DAYS              DBE GOAL:   7.0 QUALIFICATIONS: B(A)  C(B)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     3.80         X-SECT: $     2.80                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 250     CONTRACT R -25948-A       ASPHALT RESURFACE                                     LAPORTE DISTRICT              PG. 30
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9980630            |  IN48043                         ASPHALT RESURFACE
				       	                         LAPORTE COUNTY - ON CR 450W.; OLD US 30; 1350S. IN HANNA
					
	
       COMPLETION TIME:    20   WORK DAYS              DBE GOAL:   2.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 260     CONTRACT R -25949-A       ASPHALT RESURFACE                                     LAPORTE DISTRICT              PG. 31
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9980680            |  IN48042                         ASPHALT RESURFACE
				       	                         LAPORTE COUNTY - ON WATER ST; UNION ST; RR ST; LOOMIS AND
					                         MOUND ST IN UNION MILLS
	

                                                                                                                         PAGE   6
                                              NOTICE TO CONTRACTORS  --  January 15, 2002   LETTING
       COMPLETION TIME:    15   WORK DAYS              DBE GOAL:   2.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 280     CONTRACT R -26072-A       DEMOLITION, REMOVE BUILDINGS AND FOUNDATION           VINCENNES DISTRICT            PG. 32
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0101176            |  01230AB                         DEMOLITION, REMOVE BUILDINGS AND FOUNDATION
				       	                         WARRICK COUNTY - ON SR 62 FROM 6TH STREET TO 0.15 MILE EAST
					                         OF UAB OF BOONVILLE(RP 037+047 TO 043+026)
	
       COMPLETION DATE:  June 01, 2002                 DBE GOAL:   0.0 QUALIFICATIONS: C(B)  E(T)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     0.80         X-SECT: $     0.00                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 290     CONTRACT R -26076-A       DEMOLITION, REMOVE BUILDINGS AND FOUNDATIONS          SEYMOUR DISTRICT              PG. 33
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0101179            |  141100M                         DEMOLITION, REMOVE BUILDINGS AND FOUNDATIONS
				       	                         WASHINGTON COUNTY- ALONG SR 135 FROM SHORT CORNER ROAD TO
					                         SR 60 AT SALEM (RP 35+081 TO RP 42+161)
	
       COMPLETION DATE:  April 01, 2002                DBE GOAL:   0.0 QUALIFICATIONS: C(B)  E(T)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     1.00         X-SECT: $     0.00                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 320     CONTRACT RS-25789-A       ASPHALT RESURFACE AND SMALL STRUCTURE REPLACEMENT     GREENFIELD DISTRICT           PG. 34
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100222            |  1069008                         ASPHALT RESURFACE
				       	                         MADISON COUNTY - ON SR 28 FROM SR 37 TO SR 9(RP 096+054 TO
					                         103+-82)
	
           0101152            |  N/A                             SMALL STRUCTURE REPLACEMENT
				       	                         MADISON COUNTY - ON SR 28, 2.91 MILES EAST OF SR 37
					                         (RP 99+45)
	
       COMPLETION TIME:    25   WORK DAYS              DBE GOAL:   2.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 

                                                                                                                         PAGE   7
                                              NOTICE TO CONTRACTORS  --  January 15, 2002   LETTING
___________________________________________________________________________________________________________________________________
 
CALL 350     CONTRACT RS-25839-A       ASPHALT RESURFACE                                     VINCENNES DISTRICT            PG. 35
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100844            |  5063004                         ASPHALT RESURFACE
				       	                         GIBSON AND PIKE COUNTIES- ON SR 56 FROM US 41 TO SR 65
					                         (RP 00+00 TO RP 11+54)
	
       COMPLETION TIME:    90   WORK DAYS              DBE GOAL:   2.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 380     CONTRACT RS-25891-A       PAVEMENT REPAIR                                       GREENFIELD DISTRICT           PG. 36
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100210            |  4218005                         PAVEMENT REPAIR
				       	                         DELAWARE COUNTY - ON SR 332 FROM I-69 TO 7.64 MILES EAST
					                         OF I-69 (RP 0+00 TO RP 7+64)
	
       COMPLETION TIME:    60   WORK DAYS              DBE GOAL:   0.0 QUALIFICATIONS: A(B)  E(Q)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 400     CONTRACT RS-25943-A       ASPHALT RESURFACE                                     FT. WAYNE DISTRICT            PG. 37
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100890            |  1448009                         ASPHALT RESURFACE
				       	                         MIAMI COUNTY-ON US 24 FROM 0.43 MILE EAST OF US 31 TO MIAMI/
					                         WABASH COUNTY LINE
	
       COMPLETION DATE:  August 02, 2002               DBE GOAL:  10.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 440     CONTRACT RS-25947-A       ASPHALT RESURFACE                                     FT. WAYNE DISTRICT            PG. 38
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100973            |  550200Q                         ASPHALT RESURFACE
				       	                         ALLEN COUNTY - ON SR 101 FROM ADAMS/ALLEN COUNTY LINE TO
					                         US 30
	
       COMPLETION DATE:  August 03, 2002               DBE GOAL:   0.0 QUALIFICATIONS: B(A)
 

                                                                                                                         PAGE   8
                                              NOTICE TO CONTRACTORS  --  January 15, 2002   LETTING
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 452     CONTRACT RS-26009-A       ASPHALT RESURFACE                                     FT. WAYNE DISTRICT            PG. 39
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0101097            |  2311004                         RESURFACE (NON-3R/4R STANDARDS)
				       	                         WELLS COUNTY-ON SR 1 FROM SR 124 TO SR 116(NJCT) IN BLUFFTON
					
	
       COMPLETION DATE:  June 29, 2002                 DBE GOAL:   2.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 460     CONTRACT RS-26021-A       MILL SURFACE AND ASPHALT OVERLAY                      CRAWFORDSVILLE DISTRICT       PG. 40
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100444            |  0741129                         MILL SURFACE AND ASPHALT OVERLAY
				       	                         HENDRICKS AND MARION COUNTIES- ON I-74 FROM 2.71 MI EAST OF
					                         SR267 TO 0.50 MI WEST OF I-465 -EAST BOUND DRIVING LANE ONLY
	
       COMPLETION TIME:    15   WORK DAYS              DBE GOAL:   0.0 QUALIFICATIONS: B(A)
 
       PROPOSAL PRICE:           $    12.50
 
___________________________________________________________________________________________________________________________________
 
CALL 470     CONTRACT B -24979-A       BRIDGE REPLACEMENT                                    SEYMOUR DISTRICT              PG. 41
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           8676610            |  9922007                         BRIDGE REPLACEMENT - STR FLOYD 10543 - CONTINUOUS REINFORCED
                                                                 CONCRETE SLAB, 3 SPANS TOTAL LENGTH 93.5'
				       	                         FLOYD COUNTY - ON CR 59 (WALTS ROAD) OVER GEORGETOWN CREEK,
					                         0.15 MILE SOUTH OF SR 64
	
       COMPLETION TIME:    75   WORK DAYS              DBE GOAL:  10.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     4.00         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 490     CONTRACT B -25283-A       BRIDGE REHABILITATION                                 GREENFIELD DISTRICT           PG. 43
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9609680            |  0653285                         BRIDGE REHABILITATION - STR I-65-121-4843B -
                                                                 CONTINUOUS COMPOSITE STEEL BEAM, 4 SPANS TOTAL LENGTH 69.3 m

                                                                                                                         PAGE   9
                                              NOTICE TO CONTRACTORS  --  January 15, 2002   LETTING
				       	                         MARION COUNTY - ON WEST 52ND STREET (INDIANAPOLIS) OVER I-65
					                         2.4 km SOUTH OF I-465 (NORTH LEG) (RP 121+40)
	
       COMPLETION DATE:  November 15, 2002             DBE GOAL:  10.0 QUALIFICATIONS: D(B)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     3.40         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 500     CONTRACT B -25560-A       BRIDGE REPLACEMENT                                    CRAWFORDSVILLE DISTRICT       PG. 45
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           8826085            |  5232007                         BRIDGE REPLACEMENT - STR 136-32-7782 - CONTINUOUS COMPOSITE
                                                                 PRESTRESSED CONCRETE I-BEAM, 3 SPANS TOTAL LENGTH 30.5 m
				       	                         HENDRICKS COUNTY - ON US 136 OVER WEST FORK OF BIG WALNUT
					                         CREEK, 1.1 km EAST OF SR 75 AND SR 234 (RP 54+32)
	
       COMPLETION DATE:  August 30, 2002               DBE GOAL:   8.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     5.60         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 520     CONTRACT B -25655-A       BRIDGE REHABILITATION                                 LAPORTE DISTRICT              PG. 47
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9610910            |  4071002                         BRIDGE REHABILITATION-STR 4-71-6990A-CONTINUOUS REINFORCED
                                                                 CONCRETE SLAB, 3 SPANS TOTAL LENGTH 24.5 m
				       	                         ST. JOSEPH COUNTY - ON SR 4 OVER POTATO CREEK, 2.2 km  ES
					                         WEST OF SR 23 (RP 16+00)
	
       COMPLETION DATE:  July 31, 2002                 DBE GOAL:   6.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     2.40         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 530     CONTRACT B -25717-A       BRIDGE REPLACEMENT                                    VINCENNES DISTRICT            PG. 49
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9611970            |  0242030                         BRIDGE REPLACEMENT - STR 56-63-8086 - CONTINUOUS REINFORCED
                                                                 CONCRETE SLAB, 3 SPANS TOTAL LENGTH 30.4 m
				       	                         PIKE COUNTY - ON SR 56 OVER CONGER CREEK, 0.9 km EAST OF
					                         SR 65 (RP 12+67))
	
       COMPLETION TIME:    85   WORK DAYS              DBE GOAL:  10.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     4.80         X-SECT: $     0.00

                                                                                                                         PAGE  10
                                              NOTICE TO CONTRACTORS  --  January 15, 2002   LETTING
 
___________________________________________________________________________________________________________________________________
 
CALL 540     CONTRACT B -25748-A       BRIDGE REHABILITATION                                 VINCENNES DISTRICT            PG. 51
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9620230            |  3262010                         BRIDGE REHABILITATION - STR 66-62-5757B - PRESTRESSED
                                                                 CONCRETE I-BEAM, 3 SPANS TOTAL LENGTH 212.8'
				       	                         PERRY COUNTY - ON SR 66 OVER DEER CREEK, 0.14 MILE NORTH OF
					                         SR 166 (RP 86+23)
	
       COMPLETION TIME:    70   WORK DAYS              DBE GOAL:   8.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     2.60         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 560     CONTRACT B -25856-A       BRIDGE REHABILITATION                                 LAPORTE DISTRICT              PG. 52
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9901830            |  3737015                         BRIDGE REHABILITATION - STR (231)553-37-1825A - CONTINUOUS
                                                                 PRESTRESSED CONCRETE I-BEAM, 3 SPANS TOTAL LENGTH 34.9 m
				       	                         JASPER COUNTY - ON US 231 OVER IROQUOIS RIVER, 0.3 km
					                         SOUTH OF SR 114 (RP 251+64)
	
       COMPLETION DATE:  June 22, 2002                 DBE GOAL:   8.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     3.00         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 570     CONTRACT B -25860-A       BRIDGE REHABILITATION                                 CRAWFORDSVILLE DISTRICT       PG. 54
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9900580            |  4823006                         BRIDGE REHABILITATION - STR 136-23-3964A - CONTINUOUS REIN-
                                                                 FORCED CONCRETE SLAB, 3 SPANS TOTAL LENGTH 31.6 m
				       	                         FOUNTAIN COUNTY - ON US 36 OVER GRAHAM CREEK, 2.8 km
					                         WEST OF I-74 (RP 10+34)
	
       COMPLETION DATE:  June 15, 2002                 DBE GOAL:   5.0 QUALIFICATIONS: D(A)  E(C)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     1.20         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 580     CONTRACT B -25863-A       BRIDGE REPLACEMENT                                    VINCENNES DISTRICT            PG. 56
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------

                                                                                                                         PAGE  11
                                              NOTICE TO CONTRACTORS  --  January 15, 2002   LETTING
 
           9611840            |  6426005                         BRIDGE REPLACEMENT - STR 68-26-8051 - CONTINUOUS REINFORCED
                                                                 CONCRETE SLAB, 3 SPANS TOTAL LENGTH 21.4 m
				       	                         GIBSON COUNTY - ON SR 68 OVER NEWMAN LATERAL OF BIG CREEK,
					                         1.4 km EAST OF SR 65 (RP 14+58)
	
       COMPLETION TIME:    80   WORK DAYS              DBE GOAL:  10.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     3.60         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 590     CONTRACT B -25864-A       BRIDGE REHABILITATION                                 VINCENNES DISTRICT            PG. 58
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9620240            |  5462005                         BRIDGE REHABILITATION - STR 66-62-5699B - CONTINUOUS PRE-
                                                                 STRESSED CONCRETE I-BEAM, 3 SPANS TOTAL LENGTH 148.2'
				       	                         PERRY COUNTY - ON SR 66 OVER KNOBB'S CREEK, 0.12 MILE SOUTH
					                         OF SR 70 (RP 103+07)
	
       COMPLETION TIME:    70   WORK DAYS              DBE GOAL:   6.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     3.20         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 600     CONTRACT B -25942-A       DESIGN/BUILD - BRIDGE REPLACEMENT                     LAPORTE DISTRICT              PG. 60
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9610290            |  8001160                         DESIGN BUILD - BRIDGE REPLACEMENT - STR I-80-9-8055 AND
                                                                 I-80-7-8468 - CONT COMP BEAM, 2 SPANS, LENGTH 110.75 FT
				       	                         LAKE COUNTY - ON HARRISON ST OVER I-80, 0.48 MILE WEST OF
					                         SR 53 AND ON CLARK ST OVER I-80, 2.02 MILE EAST OF SR 912
	
       COMPLETION DATE:  November 27, 2002             DBE GOAL:  10.0 QUALIFICATIONS: D(B)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     8.20         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 610     CONTRACT B -25978-A       NEW BRIDGE CONSTRUCTION                               CRAWFORDSVILLE DISTRICT       PG. 61
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9608740            |  4204005                         NEW BRIDGE CONSTRUCTION - STR 18-04-8373 - CONTINUOUS REIN-
                                                                 FORCED CONCRETE SLAB, 3 SPANS TOTAL LENGTH 18.7 m
				       	                         BENTON COUNTY - ON SR 18 OVER TRIBUTARY TO MUD CREEK, 0.24
					                         MILE EAST OF US 41 (RP 007+090)
	
                                                       DBE GOAL:   8.0 QUALIFICATIONS: D(A)

                                                                                                                         PAGE  12
                                              NOTICE TO CONTRACTORS  --  January 15, 2002   LETTING
       COMPLETION DATE:  September 30, 2002
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     3.80         X-SECT: $     2.20
 
___________________________________________________________________________________________________________________________________
 
CALL 620     CONTRACT B -26016-A       BRIDGE REHABILITATION                                 GREENFIELD DISTRICT           PG. 63
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9881700            |  B372004                         BRIDGE REHABILITATION - STR MARION 3111F - REINFORCED
                                                                 CONCRETE ARCH, 3 SPANS TOTAL LENGTH 61.9 m
				       	                         MARION COUNTY - ON KENTUCKY AVENUE (INDIANAPOLIS) OVER BIG
					                         EAGLE CREEK, 1.6 km SOUTHWEST OF I-70
	
       COMPLETION DATE:  October 15, 2002              DBE GOAL:  10.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     5.40         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 630     CONTRACT B -26023-A       BRIDGE REPAIR - BEAM STRAIGHTENING                    GREENFIELD DISTRICT           PG. 65
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0101000            |  46540JS                         BRIDGE REPAIR - STR I-465-132-5282B - CONTINUOUS COMPOSITE
                                                                 STEEL BEAM, 4 SPANS TOTAL LENGTH 273.0'
				       	                         MARION COUNTY - ON I-465 (W LEG) UNDER WEST 96TH STREET
					                         (INDIANAPOLIS), 0.5 MILE WEST OF US 31 (RP 29+51)
	
           0101049            |  135100C                         BRIDGE REPAIR - STR (421X)421-49-4463B - REINFORCED CONCRETE
                                                                 GIRDER & CONTINUOUS STEEL BEAM, 4 SPANS TOTAL LENGTH 216.0'
				       	                         MARION COUNTY - ON US 421 UNDER HUNTER ROAD (INDIANAPOLIS),
					                         3.0 MILES SOUTH OF US 40 (RP 93+29)
	
           0101050            |  46540JU                         BRIDGE REPAIR - STR I-465-129-5277C - CONTINUOUS COMPOSITE
                                                                 STEEL BEAM, 4 SPANS TOTAL LENGTH 203.0'
				       	                         MARION COUNTY - ON I-465 (N LEG) UNDER WESTFIELD BOULEVARD
					                         (INDIANAPOLIS), 1.5 MILES EAST OF US 31 (RP 32+42)
	
           0101087            |  065300F                         BRIDGE REPAIR - STR. I-65-124-4285E NBL - CONTINUOUS
                                                                 COMPOSITE STEEL BEAM, 4 SPANS TOTAL LENGTH 216.9'
				       	                         MARION COUNTY - ON I-65 OVER W 71ST STREET AND BUSHS' RUN,
					                         1.5 MILES NORTHWEST OF I-465 (W LEG) (RP 124+42)
	
           0101088            |  070300N                         BRIDGE REPAIR - STR I-70-73-4647 DREC - REINFORCED CONCRETE
                                                                 GIRDER & CONTINUOUS STEEL BEAM, 4 SPANS TOTAL LENGTH 206.7'
				       	                         MARION COUNTY - ON RAMP FROM I-465 NORTHBOUND TO I-70
					                         WESTBOUND OVER I-70, 0.75 MILE NORTH OF SR 67 (RP 72+107)
	
           0101118            |  46540JT                         BRIDGE REPAIR - STR I-465-125-5270JC SB - CONTINUOUS
                                                                 COMPOSITE STEEL BEAM, 2 SPANS TOTAL LENGTH 205.0'
				       	                         MARION COUNTY - I-465 OVER I-69/BINFORD BOULEVARD, 4.25
					                         MILES NORTH OF US 36/SR 67 (RP 36+87)

                                                                                                                         PAGE  13
                                              NOTICE TO CONTRACTORS  --  January 15, 2002   LETTING
	
           0101209            |  065300H                         BRIDGE REPAIR - STR I-65-121-4843C - REINFORCED CONCRETE
                                                                 GIRDER & CONTINUOUS STEEL BEAM, 4 SPANS TOTAL LENGTH 217.0'
				       	                         MARION COUNTY - ON I-65 UNDER W 52ND STREET (INDIANAPOLIS),
					                         1.5 MILES SOUTHEAST OF I-465 (W LEG) (RP 121+44)
	
       COMPLETION DATE:  June 30, 2002                 DBE GOAL:   0.0 QUALIFICATIONS: 0050
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     1.80         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 640     CONTRACT B -26083-A       BRIDGE REPLACEMENT                                    CRAWFORDSVILLE DISTRICT       PG. 66
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9700460            |  1354012                         BRIDGE REPLACEMENT - STR 29-12-8210 - PRECAST 3 SIDED
                                                                 REINFORCED CONCRETE CULVERT, 1 SPAN TOTAL LENGTH 9.9 m
				       	                         CLINTON COUNTY - ON SR 29 OVER SOUTH FORK OF WILDCAT CREEK,
					                         2.5 km NORTH OF US 421 (RP 1+56)
	
       COMPLETION DATE:  August 17, 2002               DBE GOAL:   6.0 QUALIFICATIONS: D(A)
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     2.80         X-SECT: $     2.00
 
___________________________________________________________________________________________________________________________________
 
CALL 650     CONTRACT B -26095-A       BRIDGE REPAIR - BEAM STRAIGHTENING                    CRAWFORDSVILLE DISTRICT       PG. 68
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0101155            |  070100P                         BRIDGE REPAIR-STR I-70-11-5073D WB & I-70-11-5073C EB-CONT
                                                                 STEEL BEAM (TWO STRUCTURES), 4 SPANS TOTAL LENGTH 154.0'
				       	                         VIGO COUNTY - ON I-70 OVER SR 46, 3.8 MILES SOUTH OF US 40
					                         (RP 11+20)
	
       COMPLETION TIME:    20   WORK DAYS              DBE GOAL:   0.0 QUALIFICATIONS: 0050
 
       PROPOSAL PRICE:           $    12.50
       BRIDGE ITEMS:      PLANS: $     0.40         X-SECT: $     0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 700     CONTRACT M -24762-A       BOX CULVERT REPLACEMENT                               VINCENNES DISTRICT            PG. 69
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           986760L            |  600000E                         SMALL STRUCTURE REPLACEMENT
				       	                         GREENE COUNTY- ON SR 43 , 4.8 km NORTH OF ANDERSON BRANCH
					
	
       COMPLETION DATE:  August 20, 2002               DBE GOAL:   0.0 QUALIFICATIONS: D(A)
 

                                                                                                                         PAGE  14
                                              NOTICE TO CONTRACTORS  --  January 15, 2002   LETTING
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     2.80         X-SECT: $     0.00                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 710     CONTRACT M -25702-A       SMALL STRUCTURE REPLACEMENT AND ADDED TURN LANES      GREENFIELD DISTRICT           PG. 70
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100437            |  300000A                         SMALL STRUCTURE REPLACEMENTS AND ADDED TURN LANES
				       	                         SHELBY COUNTY- ON SR 9 AT 6.1 MI NORTH AND AT 7.7 MI NORTH
					                         OF I-74 (RP 036+003 TO RP 037+060)
	
       COMPLETION DATE:  August 23, 2002               DBE GOAL:   0.0 QUALIFICATIONS: C(B)  E(E)
 
       PROPOSAL PRICE:           $    12.50
       ROAD ITEMS:        PLANS: $     0.00         X-SECT: $     1.00                      0.00
 
___________________________________________________________________________________________________________________________________
 
CALL 800     CONTRACT T -25334-A       DYNAMIC MESSAGE SIGN INSTALLATION - PHASE V           GREENFIELD DISTRICT           PG. 71
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           9967020            |  000C536                         DYNAMIC MESSAGE SIGN INSTALLTION- PHASE V
				       	                         MULTIPLE COUNTIES - 10 NEW DYNAMIC MESSAGE SIGNS AT I-65,
					                         I-70 I-74,AND I-465
	
       COMPLETION DATE:  October 01, 2002              DBE GOAL:   2.0 QUALIFICATIONS: E(D)
 
       PROPOSAL PRICE:           $    12.50
       TRAFFIC ITEMS:     PLANS: $     5.40
 
___________________________________________________________________________________________________________________________________
 
CALL 806     CONTRACT T -25431-A       NEW FLASHER INSTALLATION                              SEYMOUR DISTRICT              PG. 72
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0101019            |  0242000                         NEW FLASHER INSTALLATION
				       	                         SCOTT COUNTY - ON SR 56 AT BOATMAN RD (RP 116+009)
					
	
       COMPLETION DATE:  June 01, 2002                 DBE GOAL:   0.0 QUALIFICATIONS: E(A)
 
       PROPOSAL PRICE:           $    12.50
       TRAFFIC ITEMS:     PLANS: $     0.40
 
___________________________________________________________________________________________________________________________________
 
CALL 810     CONTRACT T -25568-A       NEW CONTINUOUS LIGHTING                               LAPORTE DISTRICT              PG. 73
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 

                                                                                                                         PAGE  15
                                              NOTICE TO CONTRACTORS  --  January 15, 2002   LETTING
           0003150            |  2003015                         NEW CONTINOUS LIGHTING
				       	                         PORTER COUNTY - ON US 30 AT SR 49 (RP 026+045)
					
	
       COMPLETION DATE:  August 01, 2002               DBE GOAL:   0.0 QUALIFICATIONS: E(A)  0165
 
       PROPOSAL PRICE:           $    12.50
       TRAFFIC ITEMS:     PLANS: $     1.60
 
___________________________________________________________________________________________________________________________________
 
CALL 820     CONTRACT T -25672-A       TRAFFIC SIGNAL MODERNIZATION, NEW SIGNAL              CRAWFORDSVILLE DISTRICT       PG. 74
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100877            |  129200F                         NEW SIGNAL INSTALLATION
				       	                         HENDRICKS COUNTY - ON SR 267 AT CLARKS CREEK RD (RP 007+085)
					
	
           0100900            |  363200H                         TRAFFIC SIGNAL MODERNIZATION
				       	                         MARION COUNTY - ON US 40 AT GIRL SCHOOL RD (RP 070+027)
					
	
       COMPLETION DATE:  June 30, 2002                 DBE GOAL:   0.0 QUALIFICATIONS: E(A)
 
       PROPOSAL PRICE:           $    12.50
       TRAFFIC ITEMS:     PLANS: $     2.20
 
___________________________________________________________________________________________________________________________________
 
CALL 830     CONTRACT T -25727-A       TRAFFIC SIGNAL, NEW                                   FT. WAYNE DISTRICT            PG. 75
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0100414            |  351700F                         TRAFFIC SIGNAL, NEW
				       	                         DEKALB COUNTY - ON SR 327 AT QUINCY ST IN GARRETT
					                         (RP 002+000)
	
       COMPLETION DATE:  June 01, 2002                 DBE GOAL:   0.0 QUALIFICATIONS: E(A)
 
       PROPOSAL PRICE:           $    12.50
       TRAFFIC ITEMS:     PLANS: $     0.40
 
___________________________________________________________________________________________________________________________________
 
CALL 840     CONTRACT T -26039-A       NEW SIGNAL INSTALLATIONS                              LAPORTE DISTRICT              PG. 76
 
       PROJECT CONTROL NUMBER |  FED/STATE NUMBER                                          LOCATION
       ------------------------------------------                -----------------------------------------------------------
 
           0101018            |  06580AA                         NEW SIGNAL INSTALLATION
				       	                         LAKE COUNTY - ON I-65 NORTH BOUND ON-OFF RAMPS AT SR 2
					                         (RP 239+094)
	
           0101048            |  065300E                         NEW SIGNAL INSTALLATION
				       	                         LAKE COUNTY - ON I-65 SOUTH BOUND ON-OFF RAMPS AT SR 2

                                                                                                                         PAGE  16
                                              NOTICE TO CONTRACTORS  --  January 15, 2002   LETTING
					                         (RP 293+094)
	
           0101091            |  373700Q                         NEW SIGNAL INSTALLATION
				       	                         JASPER COUNTY - ON US 231 AT DIVISION ST (RP 257+014)
					
	
       COMPLETION TIME:    35   WORK DAYS              DBE GOAL:   0.0 QUALIFICATIONS: E(A)
 
       PROPOSAL PRICE:           $    12.50
       TRAFFIC ITEMS:     PLANS: $     1.20