Language Translation
  Close Menu

General Guidelines:

  • Minimize soil disturbance and clear only the size of landing needed.
  • Clear high stumps, dead snags, and other hazards.
  • Construct water diversions to drain water away from the landing and onto a stable area of the forest floor.
  • If leveling is necessary, cut and fill should not obstruct the natural drainage of the area.
  • During construction, use temporary erosion and sediment control practices (such as silt fences) where there is significant erosion potential or where there are insufficient buffer strips next to waterways.

<< Back to Log Landings

 Upcoming Events

More Events

 Top FAQs