IC 8-4.5-5-1
Purpose and administration
Sec. 1. (a) The recreational trails program is established.
(b) The purpose of the program is to provide funding and other
support for the acquisition, construction, or improvement of
recreational trails open for public use or trails that will be dedicated
to public use upon completion.
(c) The department of natural resources shall administer the
program.
As added by P.L.40-1995, SEC.3.
IC 8-4.5-5-2
Grant eligibility
Sec. 2. (a) The following are eligible to receive a grant under this
chapter:
(1) A state agency.
(2) A political subdivision.
(3) A nonprofit organization.
(b) The following may not receive a grant under this chapter:
(1) A private trail project.
(2) A project for a private purpose.
(3) A private business.
(4) A developer.
As added by P.L.40-1995, SEC.3.
IC 8-4.5-5-3
Duties of applicant
Sec. 3. (a) An applicant shall complete and submit an application
as prescribed by the department of natural resources.
(b) An applicant may submit more than one (1) application in a
state fiscal year.
(c) Two (2) or more eligible applicants may submit a joint
application. A joint application must designate a lead applicant to
serve as the principal contact with the department of natural
resources.
(d) The department of natural resources may not consider an
application under this chapter until the department determines that
the requirements for approval of a recreational trail under IC 8-4.5-6
have been satisfied.
As added by P.L.40-1995, SEC.3.
IC 8-4.5-5-4
Application
Sec. 4. (a) An application must contain the following information:
(1) The information required by IC 8-4.5-6-3.
(2) The applicant's name, mailing address, and telephone
number.
IC 8-4.5-5-5
Eligibility criteria
Sec. 5. A proposed project must meet all of the following
eligibility criteria:
(1) The project must be part of a local, an areawide, a regional,
or a statewide plan.
(2) The trail route must be designed in a reasonably safe manner
and to allow enjoyment of scenic views or points of historical
interest. The route may use:
(A) existing roads, streets, or parkways if the normal flow of
motor vehicle traffic will not be hindered;
(B) abandoned railroad corridors;
(C) water corridors, such as river levees and canal tow-paths;
(D) utility corridors; or
IC 8-4.5-5-6
Permitted costs
Sec. 6. The following costs may be paid from a grant made under
this chapter:
(1) Real property acquisition costs, including appraisal costs
and negotiation costs.
(2) Trail surfacing, resurfacing, rehabilitation, modernization,
upgrading, and reconstruction, including pavement repairs and
overlays and shoulder widening and stabilization.
(3) Initial trail construction, including grading, drainage,
paving, and erosion control.
(4) Bridge and culvert repair, modernization, replacement, or
initial construction.
(5) Roadway intersection and interchange improvements,
including warranted traffic signals that are an integral part of
the project.
(6) Construction or improvement of rest areas, information
centers, waysides, permanent interpretive displays, lighting, and
restrooms, including the costs of utility connections that are an
integral part of the project.
(7) Design engineering and construction inspection costs
directly associated with the project.
(8) Storm drainage and storm sewer costs to the extent needed
for draining the trail.
(9) Utility relocation costs necessary for trail construction or
improvement if the utility is not located on a public road.
(10) Trail signs, fencing, landscaping, parking areas, and
walkways.
As added by P.L.40-1995, SEC.3.
IC 8-4.5-5-7
Prohibited costs
Sec. 7. The following costs may not be paid from a grant made
under this chapter:
IC 8-4.5-5-8
Waiver of specified costs
Sec. 8. (a) Notwithstanding section 7 of this chapter, the board
may grant a waiver from section 7 of this chapter for specified costs.
(b) An applicant must make a written request for a waiver under
this section.
(c) If the board grants a waiver, the applicant may make the
specified expenditure. Approval of a waiver does not imply or
guarantee that a subsequent application will be approved.
(d) Unless an applicant requests an advance waiver and the
request is approved before an expenditure, any costs incurred before
a waiver is granted may not be reimbursed from a grant under this
chapter.
As added by P.L.40-1995, SEC.3.
IC 8-4.5-5-9
Waiver for acquisition of real property
Sec. 9. (a) Notwithstanding section 7(1) of this chapter, if there is
extreme urgency involving real property acquisition, the board may
grant an applicant's request for a waiver to acquire the real property
immediately.
(b) A request for a waiver under subsection (a) must be in writing
and include all of the following:
(1) Justification for the urgency of the acquisition.
(2) A description of the real property to be acquired.
(3) A county map showing the location of the real property to
be acquired.
As added by P.L.40-1995, SEC.3.
IC 8-4.5-5-10
Request for preconstruction costs
Sec. 10. (a) The board may grant an applicant's request for
preconstruction project planning design and development costs.
(b) A request submitted under subsection (a) must be in writing.
(c) The board may not grant a request under subsection (a) if the
total design and development expenditure exceeds fifteen percent
(15%) of the total construction costs for the project.
(d) The board shall require adequate documentation of eligible
costs before approving reimbursement under this section.
As added by P.L.40-1995, SEC.3.
IC 8-4.5-5-11
Review and evaluation of applications
Sec. 11. (a) The board:
(1) shall review each application;
(2) may verify the contents of an application; and
(3) may visit the trail site that is the subject of an application.
(b) The board shall evaluate each complete application on the
basis of the following criteria:
(1) Whether the predicted use of the trail justifies the
construction and maintenance costs.
(2) Need, in terms of the population to be served and existing
trails in the area.
(3) Compatibility with local, areawide, regional, or statewide
plans.
(4) The acceptability of the proposed trail to property owners.
(5) The general acceptability of the proposed trail to the
community at large.
(6) Benefits of multiple uses and recreational opportunities.
(7) Quality of the site.
(8) Economic benefits to the local area.
(9) Accessibility for persons with disabilities.
(10) Interference with any existing public utility use.
(11) Other criteria set by the board.
(c) The board shall determine the applicants to whom grants will
be awarded.
As added by P.L.40-1995, SEC.3. Amended by P.L.158-1999,
SEC.14.
IC 8-4.5-5-12
Funding commitments
Sec. 12. The board is solely responsible for all funding
commitments and shall determine which projects are funded, subject
to availability of money in the fund.
As added by P.L.40-1995, SEC.3.
IC 8-4.5-5-14
Unexpended funds
Sec. 14. The board is not required to commit all funds available
during a fiscal year. The board may reserve unexpended or repaid
money for the next programming cycle or for anticipated present or
future project needs or for other contingencies.
As added by P.L.40-1995, SEC.3.
IC 8-4.5-5-15
Limitations on reimbursement
Sec. 15. Project costs that exceed the amount granted by the board
may not be reimbursed from the fund or the state general fund.
Reimbursement of project costs is limited to the percentage match
approved by the board and actual eligible project costs incurred.
As added by P.L.40-1995, SEC.3.
IC 8-4.5-5-16
Project agreement
Sec. 16. (a) After the board has approved funding for a project,
the department of natural resources and the applicant must execute
a project agreement.
(b) Except as provided in subsection (d), the agreement shall
specify the responsibilities for project planning, design, real property
acquisition, contracting, construction and materials inspection, and
documentation and the criteria for each.
(c) The agreement shall specify the overall funding level approved
and contain an estimated budget for eligible work items.
(d) The agreement shall specify that the department of natural
resources shall assume control of the trail if the project fails because
the applicant breaches the agreement.
(e) An entity having jurisdiction over a road shall administer a
project located on a road. The entity by agreement may delegate part
or all of this responsibility.
As added by P.L.40-1995, SEC.3.
IC 8-4.5-5-17
Reimbursement of actual project costs
Sec. 17. (a) Actual eligible project costs incurred as specified in
the agreement, not to exceed the amounts authorized by the project
agreement, must be reimbursed.
(b) Project expenditures incurred after the board has made a
funding commitment but before execution of the agreement may be
reimbursed if prior written authorization is obtained from the
department of natural resources and a project agreement is
subsequently executed. However, reimbursement may not be paid
until the project agreement has been executed.
As added by P.L.40-1995, SEC.3.
IC 8-4.5-5-18
Real property acquisitions
Sec. 18. (a) Real property may be acquired by lease, by easement,
or in fee simple.
(b) If real property is acquired in fee simple, title must be taken in
the name of the state.
As added by P.L.40-1995, SEC.3.
IC 8-4.5-5-19
Audits
Sec. 19. The department of natural resources may audit all project
costs incurred for compliance with the agreement, including costs
that are part of the matching contribution.
As added by P.L.40-1995, SEC.3.
IC 8-4.5-5-20
Revocation or repayment of funds
Sec. 20. The board may revoke funding commitments or seek
repayment of funds loaned or granted, or take both actions, if any of
the following are true:
(1) The terms of the project agreement have not been fulfilled.
(2) The department of natural resources finds that the
application contained inaccuracies, omissions, errors, or
misrepresentations.
(3) The time schedule for project completion was
misrepresented or has not been maintained.
(4) The authority fails to comply with section 4(a)(7) of this
chapter.
As added by P.L.40-1995, SEC.3.
IC 8-4.5-5-21
Abandoned projects
Sec. 21. (a) If a project is completed and later abandoned, the
department shall inform the board as soon as is reasonably possible.
(b) After the board receives notification under subsection (a), the
board shall consider all possible uses by the state, including
continued abandonment of the corridor.
As added by P.L.40-1995, SEC.3.