|
|
IC 21-33-1-1
Definitions
Sec. 1. The definitions in this chapter apply throughout this
article.
As added by P.L.2-2007, SEC.274.
IC 21-33-1-2
"Cost"
Sec. 2. "Cost", for purposes of IC 21-33-3, refers to costs
described in IC 21-33-3-8.
As added by P.L.2-2007, SEC.274.
IC 21-33-1-3
"Energy cost savings contract"
Sec. 3. "Energy cost savings contract" means a contract between
a state educational institution and a qualified provider for the
implementation of at least one (1) qualified energy savings project
and related measures.
As added by P.L.2-2007, SEC.274.
IC 21-33-1-4
"Fund"
Sec. 4. "Fund", for purposes of IC 21-33-2, refers to a facilities
planning fund established under IC 21-33-2-2.
As added by P.L.2-2007, SEC.274.
IC 21-33-1-5
"Project"
Sec. 5. "Project", for purposes of IC 21-33-3, refers to a project
that is authorized under IC 21-33-3.
As added by P.L.2-2007, SEC.274.
IC 21-33-1-6
"Qualified energy savings project"
Sec. 6. "Qualified energy savings project" means a facility
alteration designed to reduce energy consumption costs or other
operating costs, including the following:
(1) Providing insulation of the facility and systems within the
facility.
(2) Installing or providing for window and door systems,
including:
(A) storm windows and storm doors;
(B) caulking or weatherstripping;
IC 21-33-1-7
"Qualified provider"
Sec. 7. "Qualified provider" means a person or business
experienced in the design, implementation, and installation of energy
and operational cost savings systems.
As added by P.L.2-2007, SEC.274.
IC 21-33-1-8
"Regional campus"
Sec. 8. "Regional campus" means Indiana State University .
Regional Campus Evansville, a regional campus managed by the
Indiana State University board of trustees before July 1, 1985.
As added by P.L.2-2007, SEC.274.
IC 21-33-1-9
"Repair and rehabilitation project"
Sec. 9. "Repair and rehabilitation project" means a project to do
any of the following:
(1) Repair, rehabilitate, remodel, renovate, reconstruct, or finish
existing facilities or buildings, or both, or take any combination
of those actions.
(2) Improve, replace, or add utilities, fixed equipment, or both,
or take any combination of those actions.
(3) Perform site improvement work without substantially
changing the exterior dimensions of existing facilities,
buildings, or any combination of facilities and buildings.
As added by P.L.2-2007, SEC.274.