Maps


Click on the links below to view maps of the U.S. 50 West project.

Preliminary Alternatives Recommended for Further NEPA Study

Preliminary Alternatives Studied

·         Western Section Preliminary Alternatives (U.S. 31 to C.R. 575W)

o    Preliminary Alternative W

o    Preliminary Alternative W1

o    Preliminary Alternative W2

o    Preliminary Alternative W3

·         Eastern Section Preliminary Alternatives (C.R. 575W to Jennings/Ripley County Line)

o    Added Travel Lanes Through North Vernon Preliminary Alternative

o    One-Way Pair Through North Vernon Preliminary Alternative

o    Preliminary Alternative A

o    Preliminary Alternative B

o    Preliminary Alternative C

o    Preliminary Alternative D

o    Preliminary Alternative E

Preliminary Alternatives

From U.S. 31 to west side of North Vernon:

From west side of North Vernon to Jennings/Ripley County Line:

Study Area