Maintaining Traffic
and Project Schedule
• Traffic on both 71st and 86th
St. will be maintained during construction by means of crossovers. Traffic
will be maintained on the existing WB lanes during construction of new
EB lanes. Traffic will then be maintained on the new EB lanes while
the WB lanes are replaced.
• All ramp traffic will be maintained during construction with
the exception that a ramp may be closed during the night or over a weekend.
Only 1 ramp in both interchanges may be closed at a time.
• All new ramps and lanes, with the exception of the 73rd direct
connect ramp, will be open to traffic by November 17, 2006 unless unforeseen
circumstances delay completion.
• The 73rd St. ramp will be open to traffic by June 1, 2007.