IN.gov - Skip Navigation

Note: This message is displayed if (1) your browser is not standards-compliant or (2) you have you disabled CSS. Read our Policies for more information.

Amber Alert
Amber Alert - TEST
  • trafficwise_widget
  • state_map_widget
  • report_concern_widget

Indiana Department of Transportation

INDOT > Resources > STIP & ARRA Documents > Transportation Long Range Plan > 2002 Transportation Plan 2002 Transportation Plan

The INDOT 25-Year Long Range Plan lays out a strategy for the future of the state highway system, which is intended to provide Hoosiers the highest level of mobility and safety possible, and to meet the needs of economic development and quality of life into the next quarter century. The Long Range Plan provides an update of the 1995 Statewide Multimodal Transportation Plan titled Transportation in Indiana: Multimodal Plan Development for the 1990's and Beyond. The 1995 mutimodal policy plan provides a foundation for developing more detailed plans for specific transportation modes. This highway plan document is intended to extend the planning period for highway improvements from the initial five years of the 1995 Plan to a 25 year planning horizon. This extended planning period provides INDOT and our planning partners, including the state's Metropolitan Planning Organizations and other key transportation stakeholders, a long range vision of how the state jurisdictional highway system will develop in the future.

The use of Adobe Acrobat Bookmarks make viewing the Chapters much easier. To Activate, Select Window/Bookmarks on the toolbar or press F5 to toggle on the keyboard. Using Thumbnails (F4) will also assist in viewing the pages.

Executive Summary 1.52 MB
2003 Amended Adoption Letter
2002 Adoption Letter
FHWA Letter 400KB

Contents

Cover
Table of Contents

Chapter Topic

  1. Introduction and Background
  2. The Planning Process
  3. Public and Stakeholder Involvement 400 KB
  4. Multimodal Coordination
  5. Air Quality Issues
  6. System Definition 2.40 MB
  7. Corridor Planning Studies 585 KB
  8. Fiscal Forecast
  9. Highway Needs Analysis 2.53 MB
  10. Planning Analysis
  11. Types of Improvements and Listing of Expansion Projects 787 KB

Project Listing by District

J300 Maps

Crawfordsville
Fort Wayne
Greenfield
LaPorte
Seymour
Vincennes

Listing by District

Crawfordsville / Map
Fort Wayne / Map
Greenfield / Map
LaPorte / Map
Seymour / Map
Vincennes / Map

Project Listing by MPO & Funding Period
Listing by Urbanized Area

Anderson / Map
Bloomington / Map
Evansville / Map
Fort Wayne / Map
Indianapolis / Map
Kokomo / Map
Lafayette / Map
Louisville / Map
Muncie / Map
NW Indiana / Map
South Bend - Elkhart / Map
Terre Haute / Map
Outside

12. Implementation

Download the Complete PDF Document 326 pages 14.1 MB