Drinking Water Permits
Capacity Development
Drinking Water Guidance Manuals
Backflow Inspectors
Permit Applications
The following applications are able to be filled out using your keyboard and mouse, then printed and mailed into IDEM.
Permit Rules
- General Permit Rules [PDF] Adds 327 IAC 8-3.5, Permit by Rule. New rules concerning water main extensions, effective April 30, 1999. (See the bookmark for Rule 3.5 in the PDF document)
- Amendments to 327 IAC 8 [PDF] Technical standards for issuances of permits or approvals for construction of public water mains, effective April 30, 1999.
- Well Construction Permit Rule [PDF], adds 327 IAC 8-3.4 to establish technical standards for the design and construction of public water system wells, effective July 17, 1999. (See the bookmark for Rule 3.4 in the PDF document)
Reports